Project Background:
Badas National High School has a student population of over 1,000 students and
is one of the largest schools in the area. The school has limited facilities for physical
education and recreation, and there is currently no space designated for basketball. The
students often have to travel to nearby parks or community centers to play basketball,
which can be time-consuming and inconvenient. Additionally, many of these facilities
are overcrowded, making it difficult for students to secure a place to play.
Project Objectives:
Project Methodology:
Work Breakdown:
The construction of the basketball court is expected to take 8 weeks in total, with
site preparation and construction being the longest and most complex stages.
Project Deliverables:
To mitigate these risks, the project manager will closely monitor the weather and
adjust the construction schedule as needed. The project budget will also be monitored
and updated regularly to ensure that it stays within the approved amount. The
equipment will be carefully packaged and transported to ensure its safety during transit.
Project Costs:
The estimated cost of the project is [insert amount]. This cost includes all materials,
labor, and equipment necessary for the construction of the court.
The project manager will work with the school administration to ensure that these
steps are implemented and sustained in the years to come, ensuring that the students
of Badas National High School continue to benefit from the new basketball court.