You are on page 1of 1

DISASTER MANAGEMENT MATRIX

HAZARD AND POSSIBLE IMPACTS NUMBER OF MATERIALS MEASURES THAT HUMAN AND POSSIBLE
RISK PEOPLE THAT AND ASSETS CAN REDUCE MATERIAL SOURCES OF
WILL BE THAT CAN BE RISKS SOURCES TO ASSISTANCE
AFFECTED DESTROYED EMPLEMENT THE
MEASURES
 Poorly built Uneven or awfully More or less than 500 Learners, Teachers, Reconstruct and Funds for the PTA SSG Municipal
stairs constructed steps disrupt that people a year. and Staffs. repair stairways. reconstruction of Government/LGU
rhythm, increasing the Building of well- stairways. Private Sectors
likelihood that the student or designed stairways, Donors or Sponsors
teacher walking up or down combined with
will trip or skip a step training focused on
entirely. raising our
awareness of the
potential for
disaster.
 Malfunctioning A broken door knob in your Population of the Learners, Teachers, Replace, fix, or Funds for the fixation PTA SSG Municipal
of door knobs classroom is commonly prone classrooms with and other change the door of broken door knobs. Government/LGU
to security issues, including broken or belongings. handle set. Secure Private Sectors
robbery. malfunctioning door the handle and the Donors or Sponsors
knobs. effectiveness of door
knobs.
 Broken This type of lack of Population of the Learners and Remove the broken Funds for the PTA SSG Municipal
windows classroom maintenance can classrooms with Teachers. window and replace replacement of unsafe Government/LGU
distract both students and broken windows. or change it with a or broken windows. Private Sectors
teachers during discussions new and sturdy one. Donors or Sponsors
and may pose a health risk if
they are tainted with
hazardous chemicals or
infectious substances that
enter the body through a cut
or puncture.
Dianne Qate Apostolero
Katelyn Jay Cabalonga
Jackielyn Rose Moldero 12 STEM B NEWTON
Joeniela Teves
Sophia Tumesa

You might also like