Observation:
The cable which is passing through the walkway side area of zone 06 is damaged
due to the ongoing land reclamation work by UCC. The work is ongoing between
two ring pole lights and the cables between them are damaged. We are getting
continuity from blue phase with neutral cable. Due to this, multiple drivers of ring
pole lights were damaged.
Land reclamation by UCC; Cable damaged Cable damaged where the land reclamation
due to the JCB and other machines are ongoing by UCC.
passing over it.
Page 1 of 3
Incident Report: Ring Pole Lights not
working (Zone 06)
Date: 01.10.2023 Ref No: 008
FDP02, RYBN 09 Circuit for the Pole Ring Cables damaged, Getting continuity between
Lights. Neutral and blue phase cable.
The drivers of 12 ring pole lights busted due Driver sample for the Ring pole lights.
to the damaged cable. 25-50V, 0.4A.
Page 2 of 3
Incident Report: Ring Pole Lights not
working (Zone 06)
Date: 01.10.2023 Ref No: 008
Page 3 of 3