Facility layout

 Consider the problem of finding suitable locations for machines,


workstations, storage areas and aisles within a plant.

 The layout problem may also occur in other places such as grocery
stores, hospitals, airports, etc. 3
Objectives of Facility layout

 A facility layout problem may have many objectives. In the


context of manufacturing plants, minimizing material
handling costs is the most common one.

 Other objectives include efficient utilization of


 space
 labor

 Eliminate
 bottlenecks
 waste or redundant movement
4
Objectives of Facility layout

 Facilitate
 organization structure
 communication and interaction between workers
 manufacturing process
 visual control
 Minimize
 manufacturing cycle time or customer flow time
 investment
 Provide
 convenience, safety and comfort of the employees
 flexibility to adapt to changing conditions
5
Material flow system
If the flow of materials, parts, and
supplies within a manufacturing
facility is to be the subject of the flow
process, the process is called the material
flow system.

Production line
Process departments
departments

Layout
Types
Product family Fixed material
departments location departments

6
Product Layout

 This layout that uses standardized processing operations to achieve smooth,


rapid, high-volume flow

 Product layouts arrange this standardized tasks in a line according to the


sequence of operations that need to be performed to assemble a
particular product

7
Product Layout

8
Pros and Cons of Product Layout

9
Fixed Position Layout

 Fixed-Position layouts are layouts used in projects in which the product is


too fragile, bulky, or heavy to move e.g. ships, houses, aircraft

 Equipment, material, and workers are brought to the production site

 The workers on such job sites are highly skilled at performing the
special tasks that they are requested to do

10
Fixed Position Layout

11
12
Pros and Cons of Fixed Production Layout

13
Process Layout

 It is a layout that groups similar


activities together in
departments of work centers
according to the process or
function that they perform.

 The operations of each work center


could serve different customers
different needs.

14
Process Layout

15
Process Layout

16
Process Layout – 1 product

17
Process Layout – 2 products

18
Process Layout – 3 products

19
Process Layout – 4 products

20
Pros and Cons of Process Layout

21
Process and Product Layouts

22
23
Product Family Layout

Group technology (product


family) departments aggregate
medium volume-variety parts into
families based on similar
manufacturing operations and design
attributes.

24
Product Family Layout

25
Product Family Layout

26
Before Product Familiy Layout

27
Before Product Familiy Layout

28
Before Product Familiy Layout

29
Before Product Familiy Layout

30
After Product Familiy Layout

31
After Product Familiy Layout

32
After Product Familiy Layout

33
After Product Familiy Layout

34
Pros and Cons of Product Family Layout

35
Comparison of differen layouts

36
Comparison of different layouts

37
Tools for Facility Layout

Activity relationship chart

Software

38
Activity relationship chart

 An activity
relationship chart
(ARC) is a tabular means
of displaying the
closeness rating among
all pairs of activities or
departments.

 In an ARC there are six


closeness ratings
which may be assigned
to each pair of
departments
39
Activity relationship chart / example

40
Activity relationship chart / example

41
Activity relationship chart / example

42
Activity relationship chart /example

43
Activity relationship chart /example

44
Activity relationship chart /example

SEC

DOR
ENG

FIL
COP STO FOY

45
Activity relationship chart – Example

46
Softwares for Facility Layout

CRAFT - Computerized Relative Allocation of Facilities Technique


CORELAP - Computerized Relationship Layout Planning
ALDEP - Automated Layout Design Program
COFAD - Computerized Facility Design

AUTOCAD
SOLIDWORKS

47
Softwares for Facility Layout

48