Battery repairs should include the following specific jobs:
510 – Replace
The above jobs will consist of the following:
Each Job should have SMU's For both 1st and 2nd Intervals, a labor time, a component group number input in the Group Number Field, and a complete parts list with the exception of the Remove & Install job. When there are two components, an O (BOTH) quantity modifier is used and enter 1 in the QUANTITY column. If there are more than 2 batteries, use quantity code S (SET-ALL) and enter 1 in the quantity column. The Labor Code for REPLACE WILL BE FLD.
SMCS CODES Use component code 1401
1401 - 510 - Replace Battery
LABOR INCLUDES: Labor for replacement of the component. EXCLUDES: Excessive labor for removal of component due to any type of failure. Cleaning due to excessive exposure to extreme conditions such as dust and debris. Excessive labor caused by rust and corrosion. PARTS INCLUDES: All parts to replace the battery/batteries. Cable assemblies and ground straps up to $1500 total parts cost. EXCLUDES: Any other parts. LABOR TIME: See chart for labor times.