sirbakunkur has been canceled due to heavy traffic flow.
Today's comprehensive patrolling plan between methara and sirbakunkur has been canceled due to heavy traffic flow
at 12:00 metehara substation
bigger mikeage 212 feeder line reclosing failed ,the ocs protection device in metehara substation shows an emergency happen between Matahara and Sirba, so metehara ocs team go out and find to the exact fault place. Today's plan has been canceled due to the failure of the Methara railcar