You are on page 1of 192

GLSB/SI/2723-094/2014

SOIL INVESTIGATION WORKS FOR PROPOSED DEVELOPMENT OF PUTERI


HARBOUR YATCH CLUB CLUBHOUSE, ON LOT TM1 AT PRECINT TANJUNG,
PUTERI HARBOUR NUSAJAYA, MUKIM PULAI, JOHOR BAHRU,
JOHOR DARUL TAKZIM.

TABLE OF CONTENT

Page

1.0 INTRODUCTION ............................................................... 1

2.0 SCOPE OF WORKS ............................................................ 1

3.0 FIELD EXPLORATION ........................................................ 2


3.1 General .................................................................. 2
3.2 Deep Boring............................................................. 2
3.2.1 Deep Boring Equipment ..................................... 2
3.2.2 Method of Advancing Borehole ............................ 2
3.2.3 Sampling In Borehole ........................................ 2
i. Disturbed sample..................................... 2
ii. Undistured Sampling ................................ 3
iii. Rock Sample .......................................... 3
iv. Ground Water Sampling ............................ 3

3.3 Field Testing ............................................................ 4


3.3.1 Standard Penetration Test ................................... 4
3.3.2 PermeabilityTest .............................................. 4

3.4 Installation And Monitoring Of Water Standpipe ................ 5


3.4.1 General ......................................................... 5
3.4.2 Installation Procedure ........................................ 5
3.4.3 Monitoring ..................................................... 5

3.5 Water Tabel Measurement............................................ 5

Foundation, Soil & Concrete Specialists


i
GLSB/SI/2723-094/2014

4.0 LABORATORY TESTING..................................................... 6


4.1 Classification Test ..................................................... 6
a. Natural Moisture Content .......................................... 6
b. Bulk and Dry Density .............................................. 6
c. Particle Size Distributions ......................................... 7
d. Atterberg Limits Determinations ................................. 7

4.2 Consolidated Undrained Triaxial Compression Test ............. 7


4.3 Shear Box Test ......................................................... 7
4.4 Uniaxial Compressive Strength Test on Rock .................... 8

4.5 Chemical Test........................................................... 8


a. PH Test ............................................................... 8
b. Organic Matter Content ............................................ 8
c. Sulphate Content .................................................... 8
d. Chloride Content .................................................... 8
e. Carbonate Content .................................................. 8

5.0 COMMENTARY ................................................................. 9

Foundation, Soil & Concrete Specialists


ii
GLSB/SI/2723-094/2014

APPENDICES

Appendix A - Site Plan


Appendix B - Engineering Logs
Appendix C - Permeability Test Results
Appendix D - Water Standpipe Monitoring Results
Appendix E - Summary and Results of Laboratory Test
Appendix F - Photographs

Foundation, Soil & Concrete Specialists


iii
GLSB/SI/2723-094/2014

SOIL INVESTIGATION WORKS


FOR
PROPOSED DEVELOPMENT OF PUTERI HARBOUR YATCH CLUB CLUBHOUSE,
ON LOT TM1 AT PRECINT TANJUNG, PUTERI HARBOUR NUSAJAYA,
]MUKIM PULAI, JOHOR BAHRU,
JOHOR DARUL TAKZIM.

1.0 INTRODUCTION.

This report presents the result of the subsurface exploration for Soil Investigation Works for
Proposed Development of Puteri Harbour Yatch Club Clubhouse, on Lot TM1 at Precint
Tanjung, Puteri Harbour Nusajaya, Mukim Pulai, Johor Bahru, Johor Darul Takzim.

The work was carried out in accordance with the instruction given by the Personnel of Messrs.
Messrs. UEM Land Berhad. The site investigation works was carried out accordance to the
British Standard Code of Practice BS 5930: 1999 “Code Practice for Site Investigation” and
laboratory tests as per BS 1377: 1990 or otherwise instructed by the client or mentioned in this
report.

2.0 SCOPE OF WORKS

The scope of works involved in this investigation includes the following: -

1. To explore the subsurface condition of proposed development area and to provide


general data relating to the project.

2. To carry out Standard Penetration Test (SPT – 63.5kg hammer having a free fall of
760mm) to determine the natural bearing resistance of the subsoil for the purpose of
design.

3. To obtain disturbed and undisturbed soil samples for carrying out the laboratory tests
to determine the natural and relevant physical properties of the subsoil pertaining to
the site for the purpose of design.

4. To carry out field Permeability Test on selected boreholes to determine the coefficient
of the soil.

5. To carry out the installation and monitoring of Water Standpipe Test for ground water
observation.

Foundation, Soil & Concrete Specialists


1
GLSB/SI/2723-094/2014

3.0 FIELD EXPLORATION.

3.1 GENERAL

Field exploration programme was conducted during the period of 18th July 2014 to
14th August 2014. The programme was supervised by our personnel from our office.

The exploration of works involved in this investigation includes the following: -

a. Six (6) numbers of Borehole


b. Eight (8) numbers of Permeability Test
c. Two (2) numbers of Water Standpipe Monitoring

to be done for the design of the foundation for the proposed project.

3.2 DEEP BORING

3.2.1 Deep Boring Equipment

The Boring equipment used was “Rotary Drilling Rig” which is capable of
boring and drilling to the depth. These boring rigs are also suitable for
advancing the borehole, sampling, in-situ testing and rock drilling in
accordance with the relevant specifications of each of these operations.
advancing the borehole, sampling, in-situ testing and rock drilling in
accordance with the relevant specifications of each of these operations.

3.2.2 Method of Advancing Boreholes

Soil drill was carried out by the rotary action of drill bit attached to the bottom
of a hollow rod, which cuts/discharges all material within the diameter of
borehole washed to the ground surface by drilling fluid pumped down the
drilling rod. Normally the drill bit is rarely allowed to extend more than
150mm ahead of the bottom of the casing (if casing is used). Advancing of the
borehole is using drill rods with suitable drill bit and casing or where
permitted, proper drilling fluids. Advancing of the borehole will be such that
the disturbance to and contamination of the soil(s) immediately below the
borehole will be kept to minimum.

Casing was required in the soft or cohesionless soils, but is often omitted in
stiff, cohesive soils when only small representative samples are desired.

3.2.3 Sampling in Boreholes

i. Disturbed Sample

Disturbed samples may be obtained by any means as long as the soil


sample obtained is representative and unchanged in the constituent
contents. After the completion of the test, the sampler tube is removed and
disassembled to provide „disturbed‟ but representative samples.

Foundation, Soil & Concrete Specialists


2
GLSB/SI/2723-094/2014

Disturbed samples were taken from continuous sampling and split barrel
samples in conjunction with penetration resistance tests for purpose of
laboratory soil classification.

Disturbed samples were normally preserved immediately after being


recovered in doubled layered heavy polyethylene bags sealed to form an
airtight bag. Properly contained samples were stored under a shelter away
from the sun and rain.

ii. Undisturbed Sample

Undisturbed samples were taken with thin-wall tube sampler or stationary


piston sampler as according to the site conditions or as directed. The
minimum internal diameter of the tube used was 75mm and the minimum
length of the tube was 1000mm.
A minimum of 10.0mm of undisturbed materials was removed from the
top and the bottom of the tube to take up a jar sample for both the top and
bottom. Subsequent to the penetration of these samples, both ends of the
sample will be coated with a non-shrinking wax to ensure airtight seal.
The void at the top and bottom of the tube was then filled.

iii. Rock Sample

The procedure for rock drilling shall be in accordance with British


Standard Code of Practice BS 5930: 1981 (Formerly CP 2001: 1957)
“Site Investigation”. The diameter of core acceptable shall be 54.00mm
diameter (NMLC or NWX, NWM core barrels where X and M refers to
the design of corebit).

The Total Core Recovery (TCR) mean the ratio of the total length of good
quality core over the drilling length expressed the nearest 5%. Rock
Quality Designation (RQD) was the ratio of the total length of the good
quality core each exceeding 100mm in length over the drilling run correct
to circular circumference or in the case of broken rock fragment
assembled to form cores with circular circumference.

iv. Ground Water Sampling

Ground water sample taken in accordance with BS 5930: Section 23.3


“Groundwater samples” on each occasion that ground water is
encountered during boring. In all type of boring where water is added
groundwater samples should be collected when directed by the Employer,
by first removing all water from the borehole by pumping or bailing, then
taking a groundwater sample from the water which collects by seepage.

Approximately 1.0 litre of water should be collected and stored in a clear


inert plastic bottle, rinsing the bottle three times with the water being
sampled before filling. The groundwater sample shall sensibly fill the
bottle which shall be sealed with a water-tight screw cap and transported
to the lab within 3 days.

Foundation, Soil & Concrete Specialists


3
GLSB/SI/2723-094/2014

3.3 Field Testing

3.3.1 Standard Penetration Test

Standard Penetration Tests (SPT) was carried in accordance with BS 1377-


9:1990, 3.3. „Determination of the penetration resistance using a split barrel
sampler and a self tripping hammer of approved design”.

Generally, is carried out in all types of soil except the very soft and soft clays,
at 1.5m intervals or change of strata or as instructed by the S.O.
representative. In case of soft clay, vane shear test shall be carried out instead
of the SPT.

The value of the N as defined in the B.S. method was reported together with
the number of blow counts for each 75mm penetration of the sampling tube.
The blow counts for the first 150mm penetration (the seating drive) which do
not contribute the value of N was also included.

Two examples are 2,3,6,7,10,19 will give N= 42 and 10, 12,35 15/25mm will
give N= 50/100mm. When a penetration resistance of 25 blows or 150mm
penetration was encountered in a seating drive, the test would stop and the
SPT value would be N*= 25/150mm. The soil samples recovered from the
split barrel were preserved as disturbed samples as disturbed samples for
subsequent testing.

3.3.2 Permeability Test

Permeability test will be carried out in borehole as indicated by the Engineer in


accordance with BS 5930: 1999 and consist of falling or rising head tests.

The borehole will be cleaned out before carrying out a permeability test and the
casing raised to expose a length of borehole wall equal to approximately two
times the borehole diameter. For materials which are likely to collapse if
unsupported a suitable filter material will be placed in the base of the borehole
to support the uncased part.

Rising head tests, the water level in the borehole shall first be lower by bailing
to a level agreed by the engineer. The water level will be recorded at 10 second
intervals during the early stages of the test and at less frequent intervals in the
latter stages in order that a representative record of the fall or rise in the water
level relative to time can be obtained. The level of the natural ground water
table shall be established at the time of testing.

Foundation, Soil & Concrete Specialists


4
GLSB/SI/2723-094/2014

3.4 Installation And Monitoring Of Water Standpipe

This test is commonly employed for the purpose of ground water observation. Borehole
drill during the course of site investigations can be left open and cased if necessary to
provide an observation point. A minimum 24 hours after drilling has ceases should be
allowed to pass before observations are commenced.

a. The installation of water standpipe is as follow: -

i. Typically, the borehole of nominal diameter of 70 mm is drilled to a


predetermined depth generally 10m below EGL.

ii. The cased borehole is clean by flushing with water and the standpipe
generally consist of perforated or slotted 40mm PVC pipe wrapped with
Geotextile is lowered into the borehole and clean sand is placed surround it.

b. Monitoring:-

v. The probe usually suspended by a steel measuring tape to record the


distance from the collar on the top end of the access tube to the top of water
levels.

vi. The Reduced Level of the top of the standpipe is recorded and subsequent
reporting shall base on the calculated RL of water levels.

3.5 Water Table Measurement

The measurement of water table in the boreholes was done using either a measuring
tape or tape rod diameter or dip-meter as directed by the Client.

The recordings were repeated daily while boring for the drilled hole in progress and
were taken in the following time intervals: -

2. Before work commences in the morning


3. At the end of the day‟s work.

The water levels recorded in the borehole logs were levels observed in these
investigation holes during the period of the site investigation. Such observed levels may
not necessarily be the actual groundwater levels that are subject to seasonal fluctuations
from time to time.
For boreholes involving impervious stratum, the casing top was capped overnight to
prevent entry of rainwater and subsurface water.

Foundation, Soil & Concrete Specialists


5
GLSB/SI/2723-094/2014

4.0 LABORATORY TESTING

Both disturbed and undisturbed samples were obtained at various depths and at every change
of soil strata for the purpose of identification, classification and testing. The following
laboratory tests were carried out in our laboratory in accordance with the British Standard
Code 1377: 1990.

The tests consisted of: -

1. Soil Classification Test


a. Natural Moisture Content
b. Bulk and Dry Density
c. Particles Size Distributions.
d. Atterberg Limits Determination.

2. Consolidated Undrained Triaxial Compression


3. Shear Box Test
4. Uniaxial Compression Strength Test On Rock
5. Chemical Test
a. PH Test
b. Organic Matter Content
c. Sulphate Content
d. Chloride Content

The results of the laboratory soil test are summarised in the Summary of Laboratory Test
Result as presented in Appendix E – Summary and Results of Laboratory Test.

4.1 Soil Classification Test

Soil Classification Test was conducted in accordance to BS: 1377: Part 2: 1990. Soil
Classification Test was determined of basic physical properties. The tests are required
for the classification of soil in accordance with BS 5930:1999. The test was included as
follow:-

a. Natural Moisture Content

Moisture content and dry density determination were performed on numerous


samples in order to provide an identification of the relevant strength of the
samples and for correlation of sample type.

b. Bulk And Dry Density

This test follows BS 1377: Part 2: 1990 Method 7. The bulk density of a soil is
the mass per unit volume of the soil including any water it contains, expressed in
Mg/m3. The linear measurement method 7.2 was used in this project for sample
obtained from undisturbed sampling method.

Foundation, Soil & Concrete Specialists


6
GLSB/SI/2723-094/2014

c. Particle Size Distribution.

A sieve analysis consists of shaking the soil through a stack of wire screens with
opening of known sizes: the definition of particle diameter for a sieve test is,
therefore, the side dimensions of a square hole. The hydrometer method is based
on strokes equation for the velocity of a freely falling sphere: the definition of
particle diameter for hydrometer test is, therefore the diameter of a sphere of the
same density, which falls at the same velocity, as the particle is question. The test
procedure, which should be followed, depends on the soil in question. If nearly all
it grains are so large that they cannot pass through the square openings at
0.074mm (No. 200 screen), the sieve analysis is preferable. For those soils, which
are nearly all finer than a No. 200 screen, the hydrometer test is recommended.
Grained size analysis has been widely used as a mean for identification and
classification of soils.

d. Atterberg Limit

Atterberg Limit Determination Test was conducted in accordance to BS: 1377:


Part 2: 1990 Test 4 & 5. The Liquid & Plastic Limit was determined to furnish
basis for the classification and identification of fine-grained cohesive soils. The
liquid limit defines the boundary lectures the liquid and plastic states. It is the
water content at which the soil has such smaller shear strength that it flows to
close grove of standard width (13mm) when jarred in a specific manner. The
plastic limit defines the boundary between the plastic and semi-solid states; it is
the water content at which the soil begins to crumble when rolls into threads of
specific size (3mm). The amount of water which must be added to change a soil
from its plastic limit to its liquid limit is measured by the “Plasticity Index” which
is equal to the limit minus the plastic limit. The “natural” moisture content at the
time of testing was also presented in the data.

4.2 Consolidated Undrained Triaxial Compression Test

Consolidated Undrained Triaxial Compression Test with pore watering pressure


measurements is carried out according to BS 1377: part 8, Method 3, 4, 5, 6 and 7.
Testing is carried out either on a set of 3 x 38mm, x 50mm, or 70mm, diameter
specimens whichever is specified. The test procedure involves the successive saturation,
consolidation and shearing stages of each of the three specimens.

4.3 Shear Box Test

Shear strength is determined either by measuring the shearing force causing failure
(direct shear tests), or by derivation from the measured compressive strength
(unconfined or triaxial compression tests). The test specimen is consolidated under a
vertical normal load until the primary consolidation is completed. It is then sheared at a
rate of displacement that is slow enough to prevent development of excess pore
pressures. Test data enable the effective shear strength parameters c’and Ø’ to be
derived. The residual shear strength parameters c’ R,and Ø’R can be obtained by
extending the tests to give large cumulative displacements by reversals and re-shearing.

Foundation, Soil & Concrete Specialists


7
GLSB/SI/2723-094/2014

4.4 Unaxial Compression Strength Test On Rock

Uniaxial compressive strength test of intact rock often needed properties in engineering
designs of structures in rock. The test is carried out on intact rock with no discontinuities
and yields data on the rock materials properties. The length to diameter ratio of 2:1 is a
minimum for cylinders.

4.5 Chemical Test

Chemical Test was conducted in accordance to BS: 1377: Part 3: 1990.The test was
included as follow:-

a. PH Test

The PH Test was carried out in accordance with BS: 1377: Part 3 :1990 to
determine the PH value by electrometric method, which gives direct reading of
the pH value of a soil suspension water.

b. Organic Matter Content

The organic matter content is carried out in accordance with BS: 1377: Part 3:
1990. The procedure covers the determination of the percentage by dry mass of
organic matters present in soil. The method, which uses dichromate oxidation, is
known as Walkley and Black‟s method.

c. Sulphate Content

The sulphate content test is carried out in accordance with BS: 1377: Part 3:
1990. The procedures for determining the sulphate content of soil and ground
water. The results obtained give the sulphate content at the time of sampling
only. There are two methods for determining the sulphate contents of aggregate
either water-soluble sulphate content or total sulphate content.

d. Chloride Content

The chloride content test is carried out in accordance with BS: 1377:
Part 3: 1990. The test was carried out for determination of water-soluble and
acid-soluble chloride salt content in soil. Both procedures are based on Voldard‟s
Method.

e. Carbonate Content

The carbonate content test is carried out for determination of carbonate content of
the soil. The test depends upon the reaction between carbonate and hydrochloric
acid, which liberates carbon dioxide. The percentage carbonate in the soil sample
expressed as CO2. The test was carried out by using rapid titration method as
stated in BS: 1377: Part 3: 1990 (Item 6).

Foundation, Soil & Concrete Specialists


8
GLSB/SI/2723-094/2014

5.0 COMMENTARY

The classification of the soil as represented in the report follows the BS 5930: 1999 Section 6
„Description of soil and rocks‟.

It must be pointed out that, where the description of the samples from the laboratory results
differ from the field description of the soil layers, the laboratory results was supplemented and
in some instances, superseded the field description. The report is limited to the representation
of the soil information data gathered from the field works and laboratory test results. It should
be noted that natural moisture content and the ground level are subjected to seasonal variation
and the drainage condition of the adjoining areas.

With this site investigation report will give part of the information to enable the designer to
decide and design the foundation system of the proposed project.

Foundation, Soil & Concrete Specialists


9
GLSB/SI/2723-094/2014

The interpretation of the results of the investigation and the final decision on the type of
foundation to adopt, rest with the Engineer.

Should there be any questions regarding our work, we should be pleased to discuss them with you.

Prepared by,

GEOLAB (M) SDN. BHD. (Reg. No. 210351-V )


380-380A , Jalan Simbang,
Taman Perling,
81200 Johor Bahru,
Johor Darul Takzim
Tel. No. : 07 236 4932, 07 237 9814
Fax No. : 07 236 4931
Email : geolab@streamyx.com; geolab@tm.net.my; geolab.sisection@gmail.com
W eb site : www.geolab-sdn-bhd.com

Foundation, Soil & Concrete Specialists


10
APPENDIX A

Site Plan

Foundation, Soil & Concrete Specialists


Design As‐built Difference
N Cas E Cas N Cas E Cas N Cas E Cas RL(m) REMARK
BH 1 ‐69556.721 10468.626 ‐69554.446 10466.622 2.275 ‐2.004 9.411 Survey on 14.08.14, level on top of ground
BH 2/SP1 ‐69529.047 10500.479 ‐69526.108 10497.851 2.939 ‐2.628 9.432 Survey on 14.08.14, level on top of ground
BH 3 ‐69502.133 10531.550 ‐69497.653 10527.580 4.480 ‐3.970 9.508 Survey on 14.08.14, level on top of ground
BH 4/SP2 ‐69556.423 10500.562 ‐69556.393 10500.585 0.030 0.023 3.323 Survey on 14.08.14, level on top of ground
BH 5 ‐69577.894 10512.633 ‐69577.888 10512.635 0.006 0.002 3.207 Survey on 14.08.14, level on top of ground
BH 6 ‐69537.651 10560.974 ‐69537.652 10560.953 ‐0.001 ‐0.021 3.124 Survey on 14.08.14, level on top of ground
APPENDIX B

Engineering Logs

Foundation, Soil & Concrete Specialists


GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-1
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 1 of 2
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 19/07/2014 Reduced Level : 9.411 m Coordinate, E : -69554.446 Type of Boring : Rotary Boring
Date Completed : 21/07/2014 Final Depth : 22.00 m N: 10466.622 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
D Hand Auger.
Top soil.

P1/ 1.50 100/450 1 0 1 0 1 1 3


Soft, light yellow and purple with light grey D1 to
mottled, sandy CLAY. 1.95

Pm1 3.00 480/1000


Permeability Test 1 UD1 to
Medium grey with brown mottled, CLAY of 4.00
High Plasticity.
3.00
to
4.00

P2/ 4.50 450/450 1 0 0 2 3 3 8


Firm to stiff, light to medium grey with medium D2 to
orange mottled, sandy CLAY with a little 4.95
gravel.

P3/ 6.00 240/450 3 4 6 6 8 9 29


Very stiff, light grey with medium red spotted, D3 to NIL/1000
SILTS and CLAYS. UD2 6.45
No recovery.
6.00
to
7.00

P4/ 7.50 190/450 5 7 7 8 8 9 32


Hard, purplish brown with pale grey mottled, D4 to NIL/1000
sandy SILT. UD3 7.95
No recovery.
7.50
to
8.50

MZ1 9.00 420/1000


Purplish grey, sandy SILT of Intermediate Pm2 to
Plasticity. 10.00

9.00
to
10.00

P5/ 10.50 260/450 3 5 6 10 10 9 35


Hard, reddish pale brown with pale grey, D5 to
slightly sandy CLAY with traces of gravel. 10.95

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
19/07/2014 1733 4.00m 3.00m 0.13m 0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
20/07/2014 0930 4.00m 3.00m 0.48m 2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
20/07/2014 1710 10.00m 9.00m 0.25m 4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
21/07/2014 0900 10.00m 9.00m 2.90m 8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
21/07/2014 1620 22.00m 22.00m 1.50m 15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
22/07/2014 0900 22.00m 22.00m 2.00m > 30 Hard : Water Level (WL) Pm : Permeability Test
22/07/2014 1645 22.00m 22.00m 9.10m P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-1
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 2 of 2
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 19/07/2014 Reduced Level : 9.411 m Coordinate, E : -69554.446 Type of Boring : Rotary Boring
Date Completed : 21/07/2014 Final Depth : 22.00 m N: 10466.622 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
P6/ 12.00 230/330 5 4 6 14 30/ 50/
Hard, orangish light brown with pale grey, D6 to 30mm 180mm
sandy SILTS/CLAYS. 12.33

P7/ 13.50 180/210 5 18 50/ 50/60mm


Hard, reddish pale grey with brown spotted, D7 to 60mm
sandy SILT with a little gravel. 13.71

P8/ 15.00 80/95 25/ 50/ 50/45mm


Hard, brownish pale grey with yellow, sandy 50mm 45mm
D8 to
SILT with some gravel. 15.10

P9/ 16.50 100/450 3 3 3 2 3 2 10


Stiff, brownish yellow, gravelly SILT. D9 to
16.95

P10/ 18.00 210/450 4 5 8 5 6 6 25


Medium dense, medium grey with pale grey D10 to
spotted, silty SAND. 18.45

P11/ 19.50 210/450 4 3 4 4 4 5 17


Very stiff, light purple with pale grey spotted, D11 to
sandy SILT of Intermediate Plasticity. 19.95

P12/ 21.00 260/350 3 5 10 17 23/ 50/


Very dense, light purple with pale grey spotted, D12 to 50mm 200mm
very gravelly clayey SAND. 21.35

END OF BH-1 AT 22.00 m


Terminated due to hit rock.

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-2
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 1 of 2
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 22/07/2014 Reduced Level : 9.432 m Coordinate, E : -69526.108 Type of Boring : Rotary Boring
Date Completed : 25/07/2014 Final Depth : 21.26 m N: 10497.851 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
D Hand Auger
Top soil.

P1/ 1.50 190/450 1 0 0 0 0 0 0


Very soft, medium reddish brown with pale D1 to
yellow mottled, SILTS and CLAYS. 1.95

P2/ 3.00 300/450 1 1 3 9 10 10 32


Hard, pale grey with medium grey mottled, D2 to
sandy SILT. 3.45

P3/ 4.50 300/450 1 3 4 10 11 16 41


Hard, pale to light grey with medium orange
D3 to
mottled, sandy SILT with some gravels. 4.95

P4/ 6.00 180/450 2 2 4 5 8 10 27


Medium dense, pale to light grey, very silty/ D4 to
clayey SAND. 6.45

P5/ 7.50 250/330 5 8 8 18 24/ 50/


Hard, medium orangish purple with pale grey D5 to 30mm 180mm
mottled, sandy SIlT with some gravels. 7.83

P6/ 9.00 140/140 14 11 50/ 50/30mm


Very dense, pale grey with medium brown D6 to 30mm
spotted, very silty/clayey SAND. 9.14

P7/ 10.50 290/450 4 8 7 7 9 8 31


Hard, medium purplish grey, sandy SILT with D7 to
some gravels. 10.95

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
22/07/2014 1800 9.14m 9.00m 1.90m 0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
23/07/2014 0900 9.14m 9.00m 5.50m 2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
23/07/2014 1720 14.50m 13.50m 2.74m 4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
24/07/2014 0930 14.50m 13.50m 5.20m 8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
24/07/2014 1650 18.45m 18.00m 2.20m 15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
25/07/2014 0930 18.45m 18.00m 6.30m > 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-2
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 2 of 2
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 22/07/2014 Reduced Level : 9.432 m Coordinate, E : -69526.108 Type of Boring : Rotary Boring
Date Completed : 25/07/2014 Final Depth : 21.26 m N: 10497.851 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
UD1 12.00 420/1000
Medium greyish purple with pale brown
to
mottled, sandy SILT of Low Plasticity. 13.00

MZ1 13.50 500/1000


Pale brownish grey with light grey spotted, to
SILT of Intermediate Plasticity. 14.50

P8/ 15.00 150/450 7 6 7 9 13 12 41


Dense, medium greyish purple with medium D8 to
yellow mottled, slightly gravelly silty SAND. 15.45
Sand is fine to medium grained.

MZ2 16.50 210/1000


Medium purple with pale grey spotted, SILT of to
Low Plasticity. 17.50

P9/ 18.00 250/450 3 5 5 8 13 16 42


Hard, pale reddish grey with light grey mottled, D9 to
sandy SILT with some gravels. 18.45

P10/ 19.50 270/450 1 2 4 4 5 5 18


Medium dense, pale grey with pale yellow D10 to
spotted, sandy SILTS/CLAYS. 19.95

P11/ 21.00 160/255 4 8 25 25/ 50/30mm


D11 to 30mm
END OF BH-2 AT 21.26 m 21.26

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-3
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 1 of 2
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 26/07/2014 Reduced Level : 9.508 m Coordinate, E : -69497.653 Type of Boring : Rotary Boring
Date Completed : 31/07/2104 Final Depth : 23.50 m N: 10527.580 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
D Hand Auger
Top soil.

UD1 1.50 800/1000


S1 - Pale grey with light yellow mottled, CLAY to
of Very High Plasticity. 2.50
S2 - CLAY of High Plasticity.
S5 - CLAY of Intermediate Plasticity.

P1/ 3.00 270/450 2 2 2 6 6 8 22


Very stiff, light grey with medium yellow and D1 to
dark purple mottled, SILT. 3.45

MZ1 4.50 750/1000


Light grey with medium yellowish red mottled,
to
SILT of Intermediate Plasticity. 5.50

P2/ 6.00 200/450 4 6 8 8 10 10 36


Hard, medium to dark yellowish red with D2 to
medium red mottled, slightly sandy SILT with 6.45
traces of gravels.

P3/ 7.50 230/450 6 6 9 9 10 13 41


Hard, light greyish yellow with medium purple D3 to
mottled, silty SAND with a little gravels. 7.95
SAND is fine to medium grained.

P4/ 9.00 400/450 2 2 3 3 5 6 17


Very stiff, medium to dark yellowish grey with D4 to
medium purple mottled. slightly sandy SILT. 9.45

MZ2 10.50 450/1000


Light grey with medium red spotted, SILT of to
Low Plasticity. 11.50

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
26/07/2014 1700 11.50m 10.50m 3.10m 0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
30/07/2014 0910 11.50m 10.50m 5.10m 2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
30/07/2014 1600 16.64m 16.50m 3.40m 4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
31/07/2014 0915 16.64m 16.50m 5.15m 8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
31/07/2014 1850 23.50m 17.50m 5.50m 15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-3
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 2 of 2
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 26/07/2014 Reduced Level : 9.508 m Coordinate, E : -69497.653 Type of Boring : Rotary Boring
Date Completed : 31/07/2104 Final Depth : 23.50 m N: 10527.580 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
P5/ 12.00 450/450 3 5 7 8 8 9 32
Dense, pale to light grey with medium yellow D5 to
mottled, slightly gravelly silty SAND. Sand is 12.45
fine to medium grained.

P6/ 13.50 280/450 3 5 6 7 9 7 29


Medium dense, pale grey with light grey
D6 to
mottled, silty SAND. Sand is fine to medium 13.95
grained.

P7/ 15.00 100/130 25/ 50/ 50/70mm


Hard, light brownish grey, sandy SILTS/ D7 to 60mm 70mm
CLAYS. 15.13

P8/ 16.50 100/140 25/ 50/ 50/75mm


Hard, light brownish grey, sandy SILT with D8 to 65mm 75mm
some gravels. 16.64

C1 17.50 CL=1.50m
Weak to moderately strong, pale to light grey to TCR=100%
with orange spotted, highly to moderately 19.00 RQD=0%
fractured, moderately to slightly weathered,
QUARTZ SANDSTONE. (Metasediment)

C2 19.00 CL=1.50m
Moderately weak to moderately strong, light
to TCR=100%
greenish light grey with orange spotted, highly 20.50 RQD=7%
to moderately fractured, moderately to slightly
weathered, QUARTZ SANDSTONE.
(Metasediment)
C3 20.50 CL=1.50m
Moderately strong, light greenish light grey
to TCR=100%
with pale grey spotted, moderately to slightly 22.00 RQD=27%
fractured, slightly weathered to fresh, QUARTZ
SANDSTONE. (Metasediment)

C4 22.00 CL=1.50m
Moderately strong to strong, light greenish light
to TCR=100%
grey with pale grey spotted, slightly fractured, 23.50 RQD=42%
slightly weathered to fresh, QUARTZ
SANDSTONE. (Metasediment)

END OF BH-3 AT 23.50 m


Water Observation Scale of Strength Legend
Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-4
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 1 of 3
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 01/08/2014 Reduced Level : 3.323 m Coordinate, E : -69556.393 Type of Boring : Rotary Boring
Date Completed : 05/08/2014 Final Depth : 35.70 m N: 10500.585 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value

Top Soil - Pale brownish grey, SILT. D

P1/ 1.50 250/450 1 2 3 3 3 3 12


Stiff, pale to light grey, SILT with a little D1 to
gravels. 1.95

M1 3.00 280/1000
Light brownish grey, sandy CLAY of Low to
Plasticity. 4.00

P2/ 4.50 150/235 8 16 37 13/ 50/85mm


Hard, pale to light purplish grey, silty D2 to 1Omm
GRAVEL. 4.74

P3/ 6.00 200/330 5 8 9 17 24/ 50/


Hard, pale purplish grey with medium red D3 to 30mm 180mm
mottled, SILTS and CLAYS. 6.33

P4/ 7.50 150/225 8 16 50/ 50/75mm


Hard, light purplish grey with light grey D4 to 75mm
mottled, sandy SILT with some gravels. 7.73

P5/ 9.00 80/450 4 5 12 8 7 8 35


Dense, light grey with medium orange mottled, D5 to
sandy GRAVEL. 9.45

P6/ 10.50 280/370 5 3 4 17 29/ 50/


Hard, medium brownish grey with medium D6 to 70mm 220mm
yellow mottled, sandy SILT with some gravels. 10.87

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
01/08/2014 1715 4.74m 4.50m 0.45m 0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
02/08/2014 0830 4.74m 4.50m 0.15m 2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
02/08/2014 1530 19.74m 19.50m 0.70m 4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
04/08/2014 0915 19.74m 19.50m 0.80m 8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
04/08/2014 1700 31.20m 29.70m 1.30m 15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
05/08/2014 0900 31.20m 29.70m 1.45m > 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-4
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 2 of 3
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 01/08/2014 Reduced Level : 3.323 m Coordinate, E : -69556.393 Type of Boring : Rotary Boring
Date Completed : 05/08/2014 Final Depth : 35.70 m N: 10500.585 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
P7/ 12.00 0/100 25 50/ 50/40mm
No recovery. 40mm
D7 to
12.11

P8/ 13.50 120/450 8 9 7 6 6 6 25


Medium dense, medium yellow, sandy D8 to
GRAVEL. 13.95

P9/ 15.00 350/450 2 3 2 2 4 6 14


Stiff, dark grey with pale grey spotted, CLAY D9 to
of Intermediate Plasticity. 15.45

P10/ 16.50 240/345 3 4 11 17 22/ 50/


Hard, dark grey with pale grey spotted, sandy D10 to 45mm 195mm
SILT with a traces of gravels. 16.85

P11/ 18.00 200/320 5 8 13 19 18/ 50/


D11 to 20mm 170mm
18.32

P12/ 19.50 140/240 5 17 33 17/ 50/90mm


Hard, light purplish grey with medium brown D12 to 15mm
mottled, sandy SILTS/CLAYS. 19.74

P13/ 21.00 100/235 9 16 39 11/ 50/85mm


Very dense, medium brownish purple with pale D13 to 10mm
grey mottled, gravelly silty SAND. Sand is fine 21.24
to medium grained.

P14/ 22.50 330/330 6 9 13 17 20/ 50/


Very dense, medium brownish orange with pale 30mm
D14 to 180mm
grey mottled, silty SAND with some gravels. 22.83
Sand is fine to medium grained.

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-4
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 3 of 3
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 01/08/2014 Reduced Level : 3.323 m Coordinate, E : -69556.393 Type of Boring : Rotary Boring
Date Completed : 05/08/2014 Final Depth : 35.70 m N: 10500.585 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
P15/ 24.00 360/450 3 3 5 7 11 13 36
Hard, pale to light yellowish grey, sandy SILT. D15 to
24.45

P16/ 25.50 110/450 5 5 11 7 7 11 36


Hard, medium orange with light grey mottled, D16 to
silty/clayey GRAVEL. 25.95

P17/ 27.00 450/450 5 4 4 3 4 4 15


Medium dense, medium orange with medium D17 to
grey mottled, clayey SAND with some gravels. 27.45
Sand is fine to medium grained.

P18/ 28.50 160/370 15 10 13 14 23/ 50/


Very dense, dark grey with pale grey spotted, D18 to 70mm 220mm
silty SAND with a traces of gravel. 28.87

C1 29.70 CL=1.50m
Moderately weak to moderately strong, light to to TCR=90%
medium grey with pale grey mottled, highly to 31.20 RQD=16%
moderately fractured, slightly weathered to
fresh, SANDSTONE.

C2 31.20 CL=1.50m
Weak to moderately strong, light greenish light
to TCR=93%
to medium grey, highly fractured, slightly 32.70 RQD=0%
weathered to fresh, QUARTZ SANDSTONE.
(Metasediment)

C3 32.70 CL=1.50m
Weak to moderately strong, light greenish light
to TCR=100%
to medium grey, highly fractured, slightly 34.20 RQD=0%
weathered to fresh, QUARTZ SANDSTONE.
(Metasediment)

C4 34.20 CL=1.50m
Weak to moderately strong, light greenish light
to TCR=87%
to medium grey, highly fractured, slightly 35.70 RQD=0%
weathered to fresh, QUARTZ SANDSTONE.
(Metasediment)

END OF BH-4 AT 35.70 m


Water Observation Scale of Strength Legend
Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-5
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 1 of 3
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 06/08/2014 Reduced Level : 3.207 m Coordinate, E : -69577.888 Type of Boring : Rotary Boring
Date Completed : 09/08/2014 Final Depth : 34.90 m N: 10512.635 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value

Top soil - Medium grey and brown, sandy D 0.00


to
CLAY. 0.15

P1/ 1.50 120/450 1 0 1 1 0 0 2


Very soft to soft, reddish pale grey and purple,
D1 to
sandy CLAY. 1.95

Mz1 3.00 450/1000


Pale grey, SILT of Low Plasticity. to
4.00

P2/ 4.50 250/375 5 8 10 17 23/ 50/


Hard, reddish purple and pale grey, sandy D2 to 75mm 225mm
SILT. 4.88

P3/ 6.00 200/270 1 5 17 33/ 50/


Hard, light grey, sandy SILT. 45mm
D3 to 120mm
6.27

P4/ 7.50 300/450 2 4 4 4 5 4 17


Medium dense, light grey, clayey GRAVEL. D4 to
7.95

P5/ 9.00 300/445 6 11 9 10 13 18/ 50/


Very dense, pale grey, silty SAND. D5 to 70mm 295mm
9.45

P6/ 10.50 250/450 4 6 8 10 8 12 38


Dense, pale grey, silty SAND.
D6 to
10.95

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
06/08/2014 1700 12.36m 12.00m 0.25m 0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
07/08/2014 0900 12.36m 12.00m 0.30m 2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
07/08/2014 1700 22.55m 22.50m 2.80m 4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
08/08/2014 0900 22.55m 22.50m 2.85m 8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
08/08/2014 1740 33.40m 28.90m 1.25m 15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
09/08/2014 0900 33.40m 28.90m 2.60m > 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-5
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 2 of 3
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 06/08/2014 Reduced Level : 3.207 m Coordinate, E : -69577.888 Type of Boring : Rotary Boring
Date Completed : 09/08/2014 Final Depth : 34.90 m N: 10512.635 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
P7/ 12.00 240/360 5 8 14 17 19/ 50/
Very dense, pale grey, sandy CLAY of Low D7 to 60mm 210mm
Plasticity. 12.36

P8/ 13.50 230/370 4 5 7 13 30/ 50/


Hard, pale grey, sandy SILT. D8 to 70mm 220mm
13.87

P9/ 15.00 210/450 4 3 4 4 5 4 17


Very stiff, light grye with medium yellow,
D9 to
sandy SILT with some gravel. 15.45

P10/ 16.50 450/450 3 4 4 5 4 5 18


Very stiff, pale grey, yellow with medium D10 to
purple mottled, gravelly SILT of High Plasticity 16.95
.

P11/ 18.00 320/405 6 6 8 12 14 14/ 48/


Hard, medium purple and brownish pale grey, D11 to 30mm 255mm
SILT. 18.41

P12/ 19.50 190/190 5 17 50/ 50/40mm


Hard, brownish dark grey, SILT with some D12 to 40mm
gravel. 19.69

C1 20.40 CL=0.50m May be appear as boulder


Moderately weak to moderately strong, medium to TCR=100% or interbedded with
RQD=36% sandstone.
to dark grey with purple dappled, moderately to 20.90
slightly fractured, slightly weathered, P13
21.00
NIL/200 14 11/ 50/ 50/75mm
50mm 75mm
SILTSTONE. to
21.20
No recovery.

P14 22.50 NIL/45 25/ 50/ 50/25mm


No recovery. 20mm 25mm
to
22.55

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-5
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 3 of 3
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 06/08/2014 Reduced Level : 3.207 m Coordinate, E : -69577.888 Type of Boring : Rotary Boring
Date Completed : 09/08/2014 Final Depth : 34.90 m N: 10512.635 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
P15/ 24.00 180/235 8 16 37 13/ 50/85mm
Very dense, brownish grey, very silty/clayey D13 to 10mm
GRAVEL. 24.24

P16/ 25.50 70/90 25/ 50/ 50/40mm


Very dense, medium rbown and light purple, D14 to 50mm 40mm
sandy GRAVEL. 25.59

P17/ 27.00 300/395 5 4 5 12 23 10/ 50/


Hard, dark grey with pale grey spotted, sandy D15 to 20mm 245mm
SILT. 27.40

P18/ 28.50 240/335 4 12 17 19 14/ 50/


D16 to 35mm 185mm
C2 28.84 CL=1.50m
Weak to moderately strong, dark grey with pale TCR=93%
grey spotted, highly to moderately fractured, 28.90
RQD=10%
to
slightly weathered, SANDSTONE. 30.40

C3 30.40 CL=1.50m
Weak to moderately strong, medium to dark
to TCR=99%
grey with pale grey spotted, highly to 31.90 RQD=0%
moderately fractured, slightly weathered to
fresh, SANDSTONE.

C4 31.90 CL=1.50m
Weak to moderately strong, light to medium
to TCR=100%
grey, highly to moderately fractured, slightly 33.40 RQD=0%
weathered to fresh, SANDSTONE.

C5 33.40 CL=1.50m
Weak to moderately strong, light to medium
to TCR=100%
grey with light green mottled, highly to 34.90 RQD=13%
moderately fractured, slightly weathered to
fresh, QUARTZ SANDSTONE.
(Metasediment)

END OF BH-5 AT 34.90 m

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-6
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 1 of 3
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 09/08/2014 Reduced Level : 3.124 m Coordinate, E : -69537.652 Type of Boring : Rotary Boring
Date Completed : 12/08/2014 Final Depth : 27.30 m N: 10560.953 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value

Top soil - Medium brownish grey with light D 0.00


to
orange, sandy CLAY. 0.15

P1/ 1.50 320/450 1 4 4 3 4 3 14


Stiff, pale grey with brownish medium orange,
D1 to
sandy CLAY. 1.95

Mz1 3.00 NIL/1000


No recovery.
to
4.00

Pm1 4.50 280/450 4 3 2 2 3 3 10


Loose to medium dense, light grey with P2/ to
medium orange, very silty/clayey GRAVEL. D2 4.95

4.50
to
4.95

P3/ 6.00 140/185 9 16/ 50/ 50/70mm


Very dense, light to medium grey, silty SAND. D3 to 40mm 70mm
6.19

P4 7.50 NIL/1000
No recovery.
to
8.50

P5/ 9.00 130/200 3 18 50/ 50/50mm


Very dense, brownish light to medium grey, D4 to 50mm
silty/clayey SAND. 9.20

P6/ 10.50 110/145 25 50/ 50/70mm


Very dense, light to medium grey, silty D5 to 70mm
GRAVEL. 10.65

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
09/08/2014 1710 4.95m 4.50m 1.14m 0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
11/08/2014 0900 4.95m 4.50m 2.05m 2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
11/08/2014 1600 14.50m 14.50m 0.00m 4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
12/08/2014 0900 14.50m 14.50m 0.70m 8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
12/08/2014 1900 27.30m 21.30m 2.30m 15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
13/08/2014 1130 27.30m 21.30m 0.45m > 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-6
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 2 of 3
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 09/08/2014 Reduced Level : 3.124 m Coordinate, E : -69537.652 Type of Boring : Rotary Boring
Date Completed : 12/08/2014 Final Depth : 27.30 m N: 10560.953 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value
P7/ 12.00 60/450 6 6 4 5 9 7 25
Medium dense, brownish medium grey, silty D6 to
SAND with some gravel. 12.45

P8/ 13.50 80/115 25 50/ 50/40mm


Hard, medium to dark grey, sandy SILT with D7 to 40mm
some gravel. 13.62

P9/ 15.00 100/125 25 50/ 50/50mm


Very dense, pale to medium orangish light grey, D8 to 50mm
silty SAND with some gravel. 15.13

C1 16.50 CL=1.50m May be appear as boulder


Weak to moderately weak, light to medium to TCR=57%
or interbedded with
sandstone.
grey, light to medium grey with orangish 18.00 RQD=0%
brown, highly fractured, moderately to slightly
weathered, SILTSTONE.

P10/ 18.00 110/115 25 50/ 50/40mm


Very dense, pale to light grey, silty SAND. D9 to 40mm
18.12

P11/ 19.50 140/170 25 37 13/ 50/95mm


Very dense, light to medium grey, silty/clayey D10 to 20mm
GRAVEL. 19.67

P12/ 21.00 100/135 25/ 50/ 50/75mm


Very dense, light to medium grey, silty SAND D11 to 60mm 75mm
CL=1.50m
with some gravel. C2 21.14
TCR=87%
Moderately weak to moderately strong, pale to 21.30 RQD=14%
medium grey with dark grey spotted, to
22.80
moderately fractured, slightly weathered to
fresh, SANDSTONE.
C3 22.80 CL=1.50m
Moderately strong to strong, pale to medium
to TCR=93%
grey with dark grey spotted, moderately 24.30 RQD=48%
fractured, slightly weathered to fresh,
SANDSTONE.
Water Observation Scale of Strength Legend
Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
GEOLAB (M) SDN BHD (Reg. No : 210351-V) ENGINEERING LOG
Foundation, Soil & Concrete Specialists (Test Method BS5930: 1999)

Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Borehole No. : BH-6
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim. Pages 3 of 3
Customer : Messrs. UEM Land Berhad Job No. : GLSB/SI/2723-094/2014
Date Started : 09/08/2014 Reduced Level : 3.124 m Coordinate, E : -69537.652 Type of Boring : Rotary Boring
Date Completed : 12/08/2014 Final Depth : 27.30 m N: 10560.953 Boring Diameter : 75mm to 125mm
Depth Sample Standard Penetration Test
Legend

Soil Description
From
R.L
& Sample Depth Recovery 75 75 75 75 75 75 'N' Remarks
(m) Lithology Ref. (m) Ratio mm mm mm mm mm mm Value

C4 24.30 CL=1.50m
Weak to moderately weak, light to medium
to TCR=97%
grey, highly fractured, slightly weathered, 25.80 RQD=0%
SANDSTONE.

C5 25.80 CL=1.50m
Weak to moderately weak, pale to lighht grey
to TCR=100%
with light green, highly fractured, slightly 27.30 RQD=0%
weathered, SANDSTONE.

END OF BH-6 AT 27.30 m

Water Observation Scale of Strength Legend


Date Time Depth Casing W.L Cohesive Soil Non-Cohesive : Wash Boring D : Disturbed Sample
0-2 Very soft 0-4 Very loose : Split Spoon Sample UD : Undisturbed Sample
2-4 Soft 4 - 10 Loose : Thin Wall Tube Sample (UD) CL : Cored Length
4 -8 Firm 10 - 30 Medium dense : Piston Sample (Ps) TCR : Total Cored Recovery
8 - 15 Stiff 30 - 50 Dense : Maizer Sample (M) RQD : Rock Quality Designation
15 - 30 Very stiff > 50 Very dense : Rock Core Sample V : Vane Shear Test
> 30 Hard : Water Level (WL) Pm : Permeability Test
P : Standard Penetration Test Pr : Pressuremeter Test
*
APPENDIX C

Permeability Test Results

Foundation, Soil & Concrete Specialists


FALLING HEAD PERMEABILITY TEST
TEST METHOD BS 5930:1999 - CODE OF PRACTICE FOR SOIL INVESTIGATION
SECTION 4 - FIELD TEST, 25.4 PERMEABILITY

PROJECT : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Clubhouse,
on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai, Johor Bahru, Johor Darul Takzim.
CLIENT : Messrs. UEM Land Berhad
CONSULTANT : Messrs. G&P Geotechnics Sdn Bhd
LOCATION :
DEPTH BELOW TOP OF CASING/STANDPIPE
BOREHOLE NO. : BH1 TESTED DEPTH : 4 m
TEST NO. : 1 CASING DEPTH : 3 m
TESTED DATE : 19/07/2014 GROUND WATER LEVEL 1.5 m
:

CASING/STAND PIPE INFORMATION


CASING ABOVE G.L : 0.08 m
CASING DIAMETER : 110 mm
OPEN HOLE DIAMETER : 90 mm
BASIC TIME FACTOR, T : min
FIELD DATA: GRAPH: SKETCH:
Time Time Water Depth H=
on Elapsed From Casing Ho - DH H/Ho 1.00 DH
Clock (min) Top, DH (m) (m) G.L
15:33:00 0 0.000 1.50 1.00
Ho
1 0.019 1.48 0.99 T= H
0.0min
2 0.023 1.48 0.98 0.37
3 0.028 1.47 0.98
4 0.030 1.47 0.98
5 0.034 1.47 0.98 G.W.L
10 0.040 1.46 0.97
15 0.048 1.45 0.97
20 0.050 1.45 0.97 0.10
25 0.052 1.45 0.97
30 0.055 1.45 0.96
35 0.060 1.44 0.96
40 0.065 1.44 0.96
H / Ho

45 0.070 1.43 0.95


50 0.077 1.42 0.95
55 0.080 1.42 0.95
60 0.088 1.41 0.94
80 0.105 1.40 0.93
100 0.115 1.39 0.92 L
0.01
17:33:00 120 0.128 1.37 0.91 0 20 40 60 80 100 120 140 160 180

Time (min)
D

CALCULATION:

A where, K = Permeability coefficient


K=
FT A = Cross sectional area of borehole
F = Intake Factor (Refer to BS5930:1999, Fig. 6, pg. 50) Case : d
2
A = 0.0063617 m (Well point or hole extended in uniform soil)

F= 2.025 2 Pi() L
F=
ln[(L/D)+(1+(L/D)^2)^1/2]
T= min L= Testing depth - Casing depth
= 1.00 m
Therefore, D= Diameter of borehole
K= m/s = 0.09 m
T= Basic Time Factor (Refer to BS5930:1999, Fig. 8, pg. 52)
=
Remarks:
a) Initial water level from top of casing was estimated as 1.50m base on static ground water level before testing.
b) Probably due to nature of this type maybe contains of fine materials, permeability coeffiecient cannot be determine with short coarse of
falling head permeability test. The actual permeability value may be very low and hence it is recommended to carry out laboratory
permeability test for this type of soil.
c) Medium grey with brown mottled, CLAY of High Plasticity.

Geolab (M) Sdn. Bhd.


bh1 Foundation, Soil, Concrete Specialsts
FALLING HEAD PERMEABILITY TEST
TEST METHOD BS 5930:1999 - CODE OF PRACTICE FOR SOIL INVESTIGATION
SECTION 4 - FIELD TEST, 25.4 PERMEABILITY

PROJECT : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Clubhouse,
on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai, Johor Bahru, Johor Darul Takzim.
CLIENT : Messrs. UEM Land Berhad
CONSULTANT : Messrs. G&P Geotechnics Sdn Bhd
LOCATION :
DEPTH BELOW TOP OF CASING/STANDPIPE
BOREHOLE NO. : BH1 TESTED DEPTH : 10 m
TEST NO. : 2 CASING DEPTH : 9 m
TESTED DATE : 20/07/2014 GROUND WATER LEVEL 3.8 m
:

CASING/STAND PIPE INFORMATION


CASING ABOVE G.L : 0.1 m
CASING DIAMETER : 110 mm
OPEN HOLE DIAMETER : 90 mm
BASIC TIME FACTOR, T : min
FIELD DATA: GRAPH: SKETCH:
Time Time Water Depth H=
on Elapsed From Casing Ho - DH H/Ho 1.00 DH
Clock (min) Top, DH (m) (m) G.L
16:10:00 0 0.000 3.80 1.00
Ho
1 0.020 3.78 0.99 T= H
0.0min
2 0.023 3.78 0.99 0.37
3 0.027 3.77 0.99
4 0.030 3.77 0.99
5 0.036 3.76 0.99 G.W.L
10 0.050 3.75 0.99
15 0.070 3.73 0.98
20 0.085 3.72 0.98 0.10
25 0.108 3.69 0.97
30 0.125 3.68 0.97
35 0.145 3.66 0.96
40 0.180 3.62 0.95
H / Ho

45 0.185 3.62 0.95


50 0.200 3.60 0.95
55 0.230 3.57 0.94
17:10:00 60 0.250 3.55 0.93

L
0.01
0 20 40 60 80 100 120 140 160 180

Time (min)
D

CALCULATION:

A where, K = Permeability coefficient


K=
FT A = Cross sectional area of borehole
F = Intake Factor (Refer to BS5930:1999, Fig. 6, pg. 50) Case : d
2
A = 0.0063617 m (Well point or hole extended in uniform soil)

F= 2.025 2 Pi() L
F=
ln[(L/D)+(1+(L/D)^2)^1/2]
T= min L= Testing depth - Casing depth
= 1.00 m
Therefore, D= Diameter of borehole
K= m/s = 0.090 m
T= Basic Time Factor (Refer to BS5930:1999, Fig. 8, pg. 52)
=
Remarks:
a) Initial water level from top of casing was estimated as 3.80m base on static ground water level before testing.
b) Probably due to nature of this type maybe contains of fine materials, permeability coeffiecient cannot be determine with short coarse of
falling head permeability test. The actual permeability value may be very low and hence it is recommended to carry out laboratory
permeability test for this type of soil.
c) Purplish grey, sandy SILT of Intermediate Plasticity.

Geolab (M) Sdn. Bhd.


bh1-2 Foundation, Soil, Concrete Specialsts
FALLING HEAD PERMEABILITY TEST
TEST METHOD BS 5930:1999 - CODE OF PRACTICE FOR SOIL INVESTIGATION
SECTION 4 - FIELD TEST, 25.4 PERMEABILITY

PROJECT : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Clubhouse,
on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai, Johor Bahru, Johor Darul Takzim.
CLIENT : Messrs. UEM Land Berhad
CONSULTANT : Messrs. G&P Geotechnics Sdn Bhd
LOCATION :
DEPTH BELOW TOP OF CASING/STANDPIPE
BOREHOLE NO. : BH2 TESTED DEPTH : 12.42 m
TEST NO. : 1 CASING DEPTH : 12 m
TESTED DATE : 23/07/2014 GROUND WATER LEVEL 2.65 m
:

CASING/STAND PIPE INFORMATION


CASING ABOVE G.L : 0.35 m
CASING DIAMETER : 110 mm
OPEN HOLE DIAMETER : 90 mm
BASIC TIME FACTOR, T : 27 min
FIELD DATA: GRAPH: SKETCH:
Time Time Water Depth H=
on Elapsed From Casing Ho - DH H/Ho 1.00 DH
Clock (min) Top, DH (m) (m) G.L
13:48:00 0 0.000 2.65 1.00
Ho
1 0.170 2.48 0.94 T= H
27.0min
2 0.290 2.36 0.89 0.37
3 0.410 2.24 0.85
4 0.490 2.16 0.82
5 0.600 2.05 0.77 G.W.L
10 0.950 1.70 0.64
15 1.100 1.55 0.58
20 1.400 1.25 0.47 0.10
25 1.570 1.08 0.41
30 1.740 0.91 0.34
35 1.970 0.68 0.26
40 2.040 0.61 0.23
H / Ho

45 2.190 0.46 0.17


50 2.350 0.30 0.11
55 2.440 0.21 0.08
60 2.570 0.08 0.03

L
0.01
0 20 40 60 80 100 120 140 160 180

Time (min)
D

CALCULATION:

A where, K = Permeability coefficient


K=
FT A = Cross sectional area of borehole
F = Intake Factor (Refer to BS5930:1999, Fig. 6, pg. 50) Case : d
2
A = 0.0063617 m (Well point or hole extended in uniform soil)

F= 1.176 2 Pi() L
F=
ln[(L/D)+(1+(L/D)^2)^1/2]
T= 27.0 min L= Testing depth - Casing depth
= 0.42 m
Therefore, D= Diameter of borehole
K= 3.34E-06 m/s = 0.090 m
T= Basic Time Factor (Refer to BS5930:1999, Fig. 8, pg. 52)
= 27.0 min

Remarks:
a) Initial water level from top of casing was estimated as 2.65m base on static ground water level.
b) Medium greyish purple with pale brown mottled, sandy SILT of Low Plasticity.

Geolab (M) Sdn. Bhd.


BH2 Foundation, Soil, Concrete Specialsts
FALLING HEAD PERMEABILITY TEST
TEST METHOD BS 5930:1999 - CODE OF PRACTICE FOR SOIL INVESTIGATION
SECTION 4 - FIELD TEST, 25.4 PERMEABILITY

PROJECT : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Clubhouse,
on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai, Johor Bahru, Johor Darul Takzim.
CLIENT : Messrs. UEM Land Berhad
CONSULTANT : Messrs. G&P Geotechnics Sdn Bhd
LOCATION :
DEPTH BELOW TOP OF CASING/STANDPIPE
BOREHOLE NO. : BH2 TESTED DEPTH : 14.5 m
TEST NO. : 2 CASING DEPTH : 13.5 m
TESTED DATE : 23/07/2014 GROUND WATER LEVEL 2.74 m
:

CASING/STAND PIPE INFORMATION


CASING ABOVE G.L : 0 m
CASING DIAMETER : 110 mm
OPEN HOLE DIAMETER : 90 mm
BASIC TIME FACTOR, T : 18 min
FIELD DATA: GRAPH: SKETCH:
Time Time Water Depth H=
on Elapsed From Casing Ho - DH H/Ho 1.00 DH
Clock (min) Top, DH (m) (m) G.L
16:26:00 0 0.000 2.74 1.00
Ho
1 0.140 2.60 0.95 T= H
18.0min
2 0.280 2.46 0.90 0.37
3 0.390 2.35 0.86
4 0.510 2.23 0.81
5 0.630 2.11 0.77 G.W.L
10 1.260 1.48 0.54
15 1.410 1.33 0.49
20 1.790 0.95 0.35 0.10
25 2.040 0.70 0.26
30 2.230 0.51 0.19
35 2.400 0.34 0.12
40 2.520 0.22 0.08
H / Ho

45 2.590 0.15 0.05


50 2.630 0.11 0.04
55 2.690 0.05 0.02
60 2.740 0.00 0.00

L
0.01
0 20 40 60 80 100 120 140 160 180

Time (min)
D

CALCULATION:

A where, K = Permeability coefficient


K=
FT A = Cross sectional area of borehole
F = Intake Factor (Refer to BS5930:1999, Fig. 6, pg. 50) Case : d
2
A = 0.0063617 m (Well point or hole extended in uniform soil)

F= 2.025 2 Pi() L
F=
ln[(L/D)+(1+(L/D)^2)^1/2]
T= 18.0 min L= Testing depth - Casing depth
= 1.00 m
Therefore, D= Diameter of borehole
K= 2.91E-06 m/s = 0.090 m
T= Basic Time Factor (Refer to BS5930:1999, Fig. 8, pg. 52)
= 18.0 min

Remarks:
a) Initial water level from top of casing was estimated as 2.74m base on water level at the same depth as stated in borelog.
b) Pale brownish grey with light grey spotted, SILT of Intermediate Plasticity.

Geolab (M) Sdn. Bhd.


BH2-2 Foundation, Soil, Concrete Specialsts
FALLING HEAD PERMEABILITY TEST
TEST METHOD BS 5930:1999 - CODE OF PRACTICE FOR SOIL INVESTIGATION
SECTION 4 - FIELD TEST, 25.4 PERMEABILITY

PROJECT : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Clubhouse,
on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai, Johor Bahru, Johor Darul Takzim.
CLIENT : Messrs. UEM Land Berhad
CONSULTANT : Messrs. G&P Geotechnics Sdn Bhd
LOCATION :
DEPTH BELOW TOP OF CASING/STANDPIPE
BOREHOLE NO. : BH2 TESTED DEPTH : 18.45 m
TEST NO. : 3 CASING DEPTH : 18 m
TESTED DATE : 24/07/2014 GROUND WATER LEVEL 3.2 m
:

CASING/STAND PIPE INFORMATION


CASING ABOVE G.L : 0.5 m
CASING DIAMETER : 90 mm
OPEN HOLE DIAMETER : 75 mm
BASIC TIME FACTOR, T : 54 min
FIELD DATA: GRAPH: SKETCH:
Time Time Water Depth H=
on Elapsed From Casing Ho - DH H/Ho 1.00 DH
Clock (min) Top, DH (m) (m) G.L
15:47:00 0 0.000 3.20 1.00
Ho
1 0.170 3.03 0.95 T= H
54.0min
2 0.220 2.98 0.93 0.37
3 0.250 2.95 0.92
4 0.300 2.90 0.91
5 0.340 2.86 0.89 G.W.L
10 0.550 2.65 0.83
15 0.730 2.47 0.77
20 0.940 2.26 0.71 0.10
25 1.110 2.09 0.65
30 1.250 1.95 0.61
35 1.420 1.78 0.56
40 1.600 1.60 0.50
H / Ho

45 1.750 1.45 0.45


50 1.930 1.27 0.40
55 2.030 1.17 0.37
60 2.200 1.00 0.31

L
0.01
0 20 40 60 80 100 120 140 160 180

Time (min)
D

CALCULATION:

A where, K = Permeability coefficient


K=
FT A = Cross sectional area of borehole
F = Intake Factor (Refer to BS5930:1999, Fig. 6, pg. 50) Case : d
2
A = 0.0044179 m (Well point or hole extended in uniform soil)

F= 1.135 2 Pi() L
F=
ln[(L/D)+(1+(L/D)^2)^1/2]
T= 54.0 min L= Testing depth - Casing depth
= 0.45 m
Therefore, D= Diameter of borehole
K= 1.20E-06 m/s = 0.075 m
T= Basic Time Factor (Refer to BS5930:1999, Fig. 8, pg. 52)
= 54.0 min

Remarks:
a) Initial water level from top of casing was estimated as 3.20m base on static ground water level.
b) Hard, pale reddish grey with light grey mottled, sandy SILT with some gravels.

Geolab (M) Sdn. Bhd.


bh2-3 Foundation, Soil, Concrete Specialsts
FALLING HEAD PERMEABILITY TEST
TEST METHOD BS 5930:1999 - CODE OF PRACTICE FOR SOIL INVESTIGATION
SECTION 4 - FIELD TEST, 25.4 PERMEABILITY

PROJECT : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Clubhouse,
on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai, Johor Bahru, Johor Darul Takzim.
CLIENT : Messrs. UEM Land Berhad
CONSULTANT : Messrs. G&P Geotechnics Sdn Bhd
LOCATION :
DEPTH BELOW TOP OF CASING/STANDPIPE
BOREHOLE NO. : BH4 TESTED DEPTH : 4.735 m
TEST NO. : 1 CASING DEPTH : 4.5 m
TESTED DATE : 2/8/2014 GROUND WATER LEVEL 0.15 m
:

CASING/STAND PIPE INFORMATION


CASING ABOVE G.L : 0.5 m
CASING DIAMETER : 90 mm
OPEN HOLE DIAMETER : 75 mm
BASIC TIME FACTOR, T : 1 min
FIELD DATA: GRAPH: SKETCH:
Time Time Water Depth H=
on Elapsed From Casing Ho - DH H/Ho 1.00 DH
Clock (min) Top, DH (m) (m) G.L
8:35:00 0 0.000 0.15 1.00
Ho
1 0.080 0.07 0.47 T= H
1.0min
2 0.130 0.02 0.13 0.37
3 0.140 0.01 0.07
4 0.160 -0.01 -0.07
5 0.180 -0.03 -0.20 G.W.L
10 0.340 -0.19 -1.27
15 0.460 -0.31 -2.07
20 0.570 -0.42 -2.80 0.10
25 0.630 -0.48 -3.20
30 0.690 -0.54 -3.60
35 0.760 -0.61 -4.07
40 0.820 -0.67 -4.47
H / Ho

45 0.850 -0.70 -4.67


50 0.910 -0.76 -5.07
55 0.980 -0.83 -5.53
60 1.030 -0.88 -5.87

L
0.01
0 10 20 30 40 50 60

Time (min)
D

CALCULATION:

A where, K = Permeability coefficient


K=
FT A = Cross sectional area of borehole
F = Intake Factor (Refer to BS5930:1999, Fig. 6, pg. 50) Case : d
2
A = 0.0044179 m (Well point or hole extended in uniform soil)

F= 0.794 2 Pi() L
F=
ln[(L/D)+(1+(L/D)^2)^1/2]
T= 1.0 min L= Testing depth - Casing depth
= 0.24 m
Therefore, D= Diameter of borehole
K= 9.27E-05 m/s = 0.075 m
T= Basic Time Factor (Refer to BS5930:1999, Fig. 8, pg. 52)
= 1.0 min

Remarks:
a) Initial water level from top of casing was estimated as 0.15m base on static ground water level.
b) Hard, pale to light purplish grey, silty GRAVEL.

Geolab (M) Sdn. Bhd.


BH4 Foundation, Soil, Concrete Specialsts
FALLING HEAD PERMEABILITY TEST
TEST METHOD BS 5930:1999 - CODE OF PRACTICE FOR SOIL INVESTIGATION
SECTION 4 - FIELD TEST, 25.4 PERMEABILITY

PROJECT : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Clubhouse,
on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai, Johor Bahru, Johor Darul Takzim.
CLIENT : Messrs. UEM Land Berhad
CONSULTANT : Messrs. G&P Geotechnics Sdn Bhd
LOCATION :
DEPTH BELOW TOP OF CASING/STANDPIPE
BOREHOLE NO. : BH5 TESTED DEPTH : 4.875 m
TEST NO. : 1 CASING DEPTH : 4.5 m
TESTED DATE : 6/8/2014 GROUND WATER LEVEL 0.75 m
:

CASING/STAND PIPE INFORMATION


CASING ABOVE G.L : 0.5 m
CASING DIAMETER : 110 mm
OPEN HOLE DIAMETER : 90 mm
BASIC TIME FACTOR, T : 32 min
FIELD DATA: GRAPH: SKETCH:
Time Time Water Depth H=
on Elapsed From Casing Ho - DH H/Ho 1.00 DH
Clock (min) Top, DH (m) (m) G.L
13:40:00 0 0.000 0.75 1.00
Ho
1 0.050 0.70 0.93 T= H
32.0min
2 0.080 0.67 0.89 0.37
3 0.085 0.67 0.89
4 0.091 0.66 0.88
5 0.100 0.65 0.87 G.W.L
10 0.130 0.62 0.83
15 0.170 0.58 0.77
20 0.210 0.54 0.72 0.10
25 0.330 0.42 0.56
30 0.420 0.33 0.44
35 0.540 0.21 0.28
40 0.560 0.19 0.25
H / Ho

45 0.580 0.17 0.23


50 0.630 0.12 0.16
55 0.650 0.10 0.13
60 0.680 0.07 0.09

L
0.01
0 20 40 60 80 100 120 140 160 180

Time (min)
D

CALCULATION:

A where, K = Permeability coefficient


K=
FT A = Cross sectional area of borehole
F = Intake Factor (Refer to BS5930:1999, Fig. 6, pg. 50) Case : d
2
A = 0.0063617 m (Well point or hole extended in uniform soil)

F= 1.104 2 Pi() L
F=
ln[(L/D)+(1+(L/D)^2)^1/2]
T= 32.0 min L= Testing depth - Casing depth
= 0.38 m
Therefore, D= Diameter of borehole
K= 3.00E-06 m/s = 0.090 m
T= Basic Time Factor (Refer to BS5930:1999, Fig. 8, pg. 52)
= 32.0 min

Remarks:
a) Initial water level from top of casing was estimated as 0.75m base on static ground water level.
b) Hard, reddish purple and pale grey, sandy SILT.

Geolab (M) Sdn. Bhd.


BH5 Foundation, Soil, Concrete Specialsts
FALLING HEAD PERMEABILITY TEST
TEST METHOD BS 5930:1999 - CODE OF PRACTICE FOR SOIL INVESTIGATION
SECTION 4 - FIELD TEST, 25.4 PERMEABILITY

PROJECT : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club Clubhouse,
on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai, Johor Bahru, Johor Darul Takzim.
CLIENT : Messrs. UEM Land Berhad
CONSULTANT : Messrs. G&P Geotechnics Sdn Bhd
LOCATION :
DEPTH BELOW TOP OF CASING/STANDPIPE
BOREHOLE NO. : BH6 TESTED DEPTH : 4.95 m
TEST NO. : 1 CASING DEPTH : 4.5 m
TESTED DATE : 9/8/2014 GROUND WATER LEVEL 0.9 m
:

CASING/STAND PIPE INFORMATION


CASING ABOVE G.L : 0.5 m
CASING DIAMETER : 90 mm
OPEN HOLE DIAMETER : 75 mm
BASIC TIME FACTOR, T : 28 min
FIELD DATA: GRAPH: SKETCH:
Time Time Water Depth H=
on Elapsed From Casing Ho - DH H/Ho 1.00 DH
Clock (min) Top, DH (m) (m) G.L
16:10:00 0 0.000 0.90 1.00
Ho
1 0.080 0.82 0.91 T= H
28.0min
2 0.120 0.78 0.87 0.37
3 0.140 0.76 0.84
4 0.150 0.75 0.83
5 0.160 0.74 0.82 G.W.L
10 0.230 0.67 0.74
15 0.290 0.61 0.68
20 0.350 0.55 0.61 0.10
25 0.440 0.46 0.51
30 0.620 0.28 0.31
35 0.810 0.09 0.10
40 0.870 0.03 0.03
H / Ho

45 0.960 -0.06 -0.07


50 1.040 -0.14 -0.16
55 1.110 -0.21 -0.23
60 1.140 -0.24 -0.27

L
0.01
0 20 40 60 80 100 120 140 160 180

Time (min)
D

CALCULATION:

A where, K = Permeability coefficient


K=
FT A = Cross sectional area of borehole
F = Intake Factor (Refer to BS5930:1999, Fig. 6, pg. 50) Case : d
2
A = 0.0044179 m (Well point or hole extended in uniform soil)

F= 1.135 2 Pi() L
F=
ln[(L/D)+(1+(L/D)^2)^1/2]
T= 28.0 min L= Testing depth - Casing depth
= 0.45 m
Therefore, D= Diameter of borehole
K= 2.32E-06 m/s = 0.075 m
T= Basic Time Factor (Refer to BS5930:1999, Fig. 8, pg. 52)
= 28.0 min

Remarks:
a) Initial water level from top of casing was estimated as 0.9m base on static ground water level.
b) Loose to medium dense, light grey with medium orange, very silty/clayey GRAVEL.

Geolab (M) Sdn. Bhd.


BH6 Foundation, Soil, Concrete Specialsts
APPENDIX D

Water Standpipe Monitoring Results

Foundation, Soil & Concrete Specialists


Soil Investigation Works for Proposed Development of Puteri Harbour Yatch
Club Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya,
Mukim Pulai, Johor Bahru, Johor Darul Takzim.

WATER STAND PIPE MONITORING SUMMARY

Water Stand Pipe No. BH2-SP1


Date of installation 25/07/2014
Ground Level 9.432 m (At installation Time)
Installed Depth 15.00 m
Ground Level to pipe top 0.50 m
1 2 3 5 4 6
Time Water Depth
Ground Level Water Level
Date of Monitoring Elapsed from Ground Remarks
(mRL) (mRL)
(Day) Level (m)

26/07/14 09:00 0.00 5.300 9.432 4.132


26/07/14 18:20 0.39 5.700 9.432 3.732
30/07/14 09:00 4.00 6.200 9.432 3.232
30/07/14 16:00 4.29 6.250 9.432 3.182
31/07/14 09:00 5.00 6.500 9.432 2.932
31/07/14 18:50 5.41 6.300 9.432 3.132
01/08/14 08:40 5.99 6.400 9.432 3.032
01/08/14 17:20 6.35 6.350 9.432 3.082
02/08/14 08:30 6.98 6.500 9.432 2.932
02/08/14 17:30 7.35 6.420 9.432 3.012
04/08/14 08:00 8.96 6.450 9.432 2.982
04/08/14 17:00 9.33 6.430 9.432 3.002
05/08/14 09:00 10.00 6.450 9.432 2.982
05/08/14 17:00 5.33 6.500 9.432 2.932
06/08/14 09:15 6.01 6.450 9.432 2.982
06/08/14 17:00 6.33 6.400 9.432 3.032
07/08/14 09:00 7.00 6.500 9.432 2.932
07/08/14 17:00 5.35 6.470 9.432 2.962
08/08/14 09:00 6.02 6.520 9.432 2.912
08/08/14 17:40 6.38 6.450 9.432 2.982
09/08/14 09:00 7.02 6.520 9.432 2.912
09/08/14 20:20 7.12 6.450 9.432 2.982
11/08/14 09:00 7.04 6.450 9.432 2.982
11/08/14 16:00 6.96 6.500 9.432 2.932
12/08/14 09:00 7.00 6.500 9.432 2.932
12/08/14 19:00 7.08 6.450 9.432 2.982
13/08/14 11:30 7.77 6.470 9.432 2.962
23/09/14 11:55 48.11 6.250 9.432 3.182
Soil Investigation Works for Proposed Development of Puteri Harbour Yatch
Club Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya,
Mukim Pulai, Johor Bahru, Johor Darul Takzim.

WATER STAND PIPE MONITORING SUMMARY

Water Stand Pipe No. BH2-SP1


Date of installation 25/07/2014
Ground Level 9.432 m (At installation Time)
Installed Depth 15.00 m
Ground Level to pipe top 0.50 m

WATER LEVEL VS TIME ELAPSED


15.0

10.0
Water Level (m)

5.0

0.0

-5.0

-10.0
Series2

-15.0
20/07/14 30/07/14 09/08/14 19/08/14 29/08/14 08/09/14 18/09/14 28/09/14

Date
Soil Investigation Works for Proposed Development of Puteri Harbour Yatch
Club Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya,
Mukim Pulai, Johor Bahru, Johor Darul Takzim.

WATER STAND PIPE MONITORING SUMMARY

Water Stand Pipe No. BH4-SP2


Date of installation 5/8/2014
Ground Level 3.323 m (At installation Time)
Installed Depth 10.00 m
Ground Level to pipe top 0.50 m
1 2 3 5 4 6
Time Water Depth
Ground Level Water Level
Date of Monitoring Elapsed from Ground Remarks
(mRL) (mRL)
(Day) Level (m)

05/08/14 17:00 0.00 2.600 3.323 0.723


06/08/14 09:15 0.68 2.650 3.323 0.673
06/08/14 17:00 1.00 2.650 3.323 0.673
07/08/14 09:00 1.67 2.650 3.323 0.673
07/08/14 17:00 2.00 2.430 3.323 0.893
08/08/14 09:00 2.67 2.670 3.323 0.653
08/08/14 17:40 3.03 2.600 3.323 0.723
09/08/14 09:00 3.67 2.700 3.323 0.623
09/08/14 22:20 4.22 2.600 3.323 0.723
11/08/14 09:00 5.67 2.850 3.323 0.473
11/08/14 16:00 5.96 2.900 3.323 0.423
12/08/14 09:00 6.67 3.000 3.323 0.323
12/08/14 19:00 7.08 2.940 3.323 0.383
13/08/14 11:30 7.77 2.740 3.323 0.583
23/09/14 11:50 48.11 2.270 3.323 1.053

WATER LEVEL VS TIME ELAPSED


10.0
8.0
6.0
Water Level (m)

4.0
2.0
0.0
-2.0
-4.0
-6.0
-8.0 Water Level

-10.0
30/07/14 09/08/14 19/08/14 29/08/14 08/09/14 18/09/14 28/09/14

Date
APPENDIX E

Summary and Results of Laboratory Test

Foundation, Soil & Concrete Specialists


APPENDIX F

Photographs

Foundation, Soil & Concrete Specialists


BH1

Foundation, Soil & Concrete Specialists


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 1 : Deep Boring Location at BH1

Photo 2 : Disturbed sample of BH1 at 1.50m

Photo 3 : Disturbed sample of BH1 at 4.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 4 : Disturbed sample of BH1 at 6.00m

Photo 5 : Disturbed sample of BH1 at 7.50m

Photo 6 : Disturbed sample of BH1 at 10.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 7 : Disturbed sample of BH1 at 12.00m

Photo 8 : Disturbed sample of BH1 at 13.50m

Photo 9 : Disturbed sample of BH1 at 15.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 10 : Disturbed sample of BH1 at 16.50m

Photo 11 : Disturbed sample of BH1 at 18.00m

Photo 12 : Disturbed sample of BH1 at 19.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 13 : Disturbed sample of BH1 at 21.00m


BH2

Foundation, Soil & Concrete Specialists


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 1 : Deep Boring Location at BH2

Photo 2 : Disturbed sample of BH2 at 1.50m

Photo 3 : Disturbed sample of BH2 at 3.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 4 : Disturbed sample of BH2 at 4.50m

Photo 5 : Disturbed sample of BH2 at 6.00m

Photo 6 : Disturbed sample of BH2 at 7.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 7 : Disturbed sample of BH2 at 9.00m

Photo 8 : Disturbed sample of BH2 at 10.50m

Photo 9 : Disturbed sample of BH2 at 15.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 10 : Disturbed sample of BH2 at 18.00m

Photo 11 : Disturbed sample of BH2 at 19.50m

Photo 12 : Disturbed sample of BH2 at 21.00m


BH3

Foundation, Soil & Concrete Specialists


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 1 : Deep Boring Location at BH3

Photo 2 : Disturbed sample of BH3 at 3.00m

Photo 3 : Disturbed sample of BH3 at 4.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 4 : Disturbed sample of BH3 at 6.00m

Photo 5 : Disturbed sample of BH3 at 7.50m

Photo 6 : Disturbed sample of BH3 at 9.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 7 : Disturbed sample of BH3 at 10.50m

Photo 8 : Disturbed sample of BH3 at 12.00m

Photo 9 : Disturbed sample of BH3 at 13.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 10 : Disturbed sample of BH3 at 15.00m

Photo 11 : Rock Core Sample of BH3 at 17.50m to 23.50m (C1-C4)


BH4

Foundation, Soil & Concrete Specialists


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 1 : Deep Boring Location at BH4

Photo 2 : Disturbed sample of BH4 at 3.00m

Photo 3 : Disturbed sample of BH4 at 4.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 4 : Disturbed sample of BH4 at 6.00m

Photo 5 : Disturbed sample of BH4 at 7.50m

Photo 6 : Disturbed sample of BH4 at 9.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 7 : Disturbed sample of BH4 at 10.50m

Photo 8 : Disturbed sample of BH4 at 13.50m

Photo 9 : Disturbed sample of BH4 at 15.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 10 : Disturbed sample of BH4 at 16.50m

Photo 11 : Disturbed sample of BH4 at 18.00m

Photo 12 : Disturbed sample of BH4 at 19.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 13 : Disturbed sample of BH4 at 21.00m

Photo 14 : Disturbed sample of BH4 at 22.50m

Photo 15 : Disturbed sample of BH4 at 24.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 16 : Disturbed sample of BH4 at 25.50m

Photo 17 : Disturbed sample of BH4 at 27.00m

Photo 18 : Disturbed sample of BH4 at 28.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 19 : Rock Core Sample of BH4 at 29.70m to 35.70m (C2-C5)


BH5

Foundation, Soil & Concrete Specialists


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 1 : Deep Boring Location at BH5

Photo 2 : Disturbed sample of BH5 at 1.50m

Photo 3 : Disturbed sample of BH5 at 4.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 4 : Disturbed sample of BH5 at 7.50m

Photo 5 : Disturbed sample of BH5 at 9.00m

Photo 6 : Disturbed sample of BH5 at 10.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 7 : Disturbed sample of BH5 at 12.00m

Photo 8 : Disturbed sample of BH5 at 13.50m

Photo 9 : Disturbed sample of BH5 at 15.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 10 : Disturbed sample of BH5 at 16.50m

Photo 11 : Disturbed sample of BH5 at 18.00m

Photo 12 : Disturbed sample of BH5 at 19.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 13 : Disturbed sample of BH5 at 24.00m

Photo 14 : Disturbed sample of BH5 at 25.50m

Photo 15 : Disturbed sample of BH5 at 27.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 16 : Disturbed sample of BH5 at 28.50m

Photo 17 : Rock Core Sample of BH5 at 28.90m to 34.90m (C1-C4)


BH6

Foundation, Soil & Concrete Specialists


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 1 : Deep Boring Location at BH6

Photo 2 : Disturbed sample of BH6 at 1.50m

Photo 3 : Disturbed sample of BH6 at 4.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 4 : Disturbed sample of BH6 at 6.00m

Photo 5 : Disturbed sample of BH6 at 9.00m

Photo 6 : Disturbed sample of BH6 at 10.50m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 7 : Disturbed sample of BH6 at 12.00m

Photo 8 : Disturbed sample of BH6 at 13.50m

Photo 9 : Disturbed sample of BH6 at 15.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 10 : Disturbed sample of BH6 at 18.00m

Photo 11 : Disturbed sample of BH6 at 19.50m

Photo 12 : Disturbed sample of BH6 at 21.00m


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Land Berhad

Photo 13 : Rock Core Sample of BH6 at 16.50m to 18.00m (C1)

Photo 14 : Rock Core Sample of BH6 at 21.30m to 27.30m (C4-C5)


Lab Testing

Foundation, Soil & Concrete Specialists


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

CIU Test

Photo 1 : CIU Test for BH2 - M1 (13.50m)

Photo 2 : CIU Test for BH3 - UD1 (1.50m) - Before

Photo 3 : CIU Test for BH3 - UD1 (1.50m) - After


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

Photo 4 : CIU Test for BH3 - M1 (1.50m) - Before

Photo 5 : CIU Test for BH3 - M1 (1.50m) - After


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

Shear Box

Photo 1 : Shear Box for BH1-UD1 (3.00m) - A

Photo 2 : Shear Box for BH1-UD1 (3.00m) - B

Photo 3 : Shear Box for BH1-UD1 (3.00m) - C


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

Photo 4 : Shear Box for BH1-MZ1 (9.00m) - A

Photo 5 : Shear Box for BH1-MZ1 (9.00m) - B

Photo 6 : Shear Box for BH1-MZ1 (9.00m) - C


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

Photo 7 : Shear Box for BH2-UD1 (12.00m) - A

Photo 8 : Shear Box for BH2-UD1 (12.00m) - B

Photo 9 : Shear Box for BH2-UD1 (12.00m) - C


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

Photo 10 : Shear Box for BH2-M1 (13.50m) - A

Photo 11 : Shear Box for BH2-M1 (13.50m) - B

Photo 12 : Shear Box for BH2-M1 (13.50m) - C


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

Photo 13 : Shear Box for BH2-M2 (16.50m) - A

Photo 14 : Shear Box for BH2-M2 (16.50m) - B

Photo 15 : Shear Box for BH2-M2 (16.50m) - C


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

Photo 16 : Shear Box for BH3-MZ1 (10.50m) - A

Photo 17 : Shear Box for BH3-MZ1 (10.50m) - B

Photo 18 : Shear Box for BH3-MZ1 (10.50m) - C


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

Photo 19 : Shear Box for BH4-MZ1 (3.00m) - A

Photo 20 : Shear Box for BH4-MZ1 (3.00m) - B

Photo 21 : Shear Box for BH4-MZ1 (3.00m) - C


Project : Soil Investigation Works for Proposed Development of Puteri Harbour Yatch Club
Clubhouse, on Lot TM1 at Precint Tanjung, Puteri Harbour Nusajaya, Mukim Pulai,
Johor Bahru, Johor Darul Takzim.

Customer : Messrs. UEM Sunrise Berhad

Photo 22 : Shear Box for BH5-MZ1 (3.00m) - A

Photo 23 : Shear Box for BH5-MZ1 (3.00m) - B

Photo 30 : Shear Box for BH5-MZ1 (3.00m) - C

You might also like