Takeoff Sheet for Dike 2 (IPC 8) Takeoff Sheet for Dike 2 (IPC 8)

For the Contractor For the Consultant For the Contractor For the Consultant

___________ ___________

Elev=360.21

Elev=360.21
Elev=360.21

Elev=360.21
Elev=360.21

Elev=360.21
Offset =-1.5

Offset =1.5

Offset =-1.5

Offset =1.5
Offset =0.0

Offset =0.0
___________ ___________

Elev=357.99

Offset =5.9
Elev=356.38

Offset =9.2

Offset =-13.2
Elev=354.36
Offset =-13.6
Elev=354.14

STN = 4+100 , STN = 4+120 ,


Alignment Name = Dike 2 Alignment Name = Dike 2

FEDERAL DEMOCRATIC REPUBLIC ENSIRAD Civil Systems Engineering Plc. Afar Construction Corporation Tendaho PC-16 Irrigation Block
OF ETHIOPIA Tel: +251-116 -677684 Rehabilitation and Flood Protection Dike
Mobile: +251-930-000079 Maintenance Work