Method Statement For Suspended Ceiling Installation
Method Statement For Suspended Ceiling Installation
The QA/QC Department is responsible for the overall inspection and documentation of
works in compliance with the work procedure and Project Specifications and shall be
responsible for coordination with Client for inspection activities and close out of the
NCR, if any.
PM Project Manager
CM Construction Manager
PE Project Engineer
The Construction Manager and/or his nominee are responsible for the overall execution
of the works in accordance with the steps outlined in this procedure and consistent with
the approved project schedule.
6. PROCEDURE
Obtain each color, grade, finish, type, composition, and variety of tiles from a single
source. For grout and setting materials, obtain ingredients of uniform quality from one
manufacturer for each cementitious and admixture component and from one source or
producer.