Method Statement For Suspended Ceiling Installation
Method Statement For Suspended Ceiling Installation
Approved RAMS will be made available on-site, and job-specific dangers and
controls will be explained to all individuals participating in the job.
Ensure that staff has received manual handling training.
Use mechanical devices to avoid needless heavy manual handling of materials.
Accompanying the Engineer’s representative for ongoing inspection and obtaining his
approval to proceed with the next activity.
The Survey Department is responsible for all the layouts / setting out and for
establishing the reference elevations related to the work.
Accompanying the Engineer’s representative for ongoing inspection and obtaining his
approval to proceed with the next activity.
The Survey Department is responsible for all the layouts / setting out and for
establishing the reference elevations related to the work.
PM Project Manager
CM Construction Manager
PE Project Engineer
QCM Quality Control Manager
QCE Quality Control Engineer
SM Safety Manager
SR Surveyor
SF Section Foreman
QCP Quality Control Procedure
ITP Inspection and Test Plan
ITL Independent Test Laboratory
BOQ Bill Of Quantities
MS Method Statement
FM Form
NCR Non-Conformance Report
ITR Inspection & Test Request
5. RESPONSIBILITIES
The Project Manager is responsible for the preparation and approval of this work
procedure.
The Construction Manager and/or his nominee are responsible for the overall execution
of the works in accordance with the steps outlined in this procedure and consistent with
the approved project schedule.
He shall be responsible for controlling the coordination between all involved parties to
ensure Safety, Quality, controlling the progress of work, civil and MEP clearance prior to
starting tiling work, and ensuring final approval is obtained prior to starting the next
activity.
Notifying the QC engineer and issuing the checklist (inspection request for
approval/checklist – Annex A, including all clearances as applicable in a timely manner
when work is ready for inspection.
Accompanying the Engineer’s representative for ongoing inspection and obtaining his
approval to proceed with the next activity.