You are on page 1of 3

Electrical Industries Co. Ltd.

INSPECTION AND TEST RECORD


Description: Contract no.: Customer Ref .No
TRIP CIRCUIT SUPERVISION 4400006595 -
Customer: End Client: Sheet:
SEC-COA SEC-COA Page 1 of 3

Site: Location #: Project name:


SS 7707 , AL KHARJ 13.8 KV SWG Protection modifaction of 13.8KV Switchgear

1. GENERAL DATA AND INFORMATION:

Panel Designation : H1 Relay Designation : +D1-743

Manufacturer : ABB Rated Voltage : 40-265VDC

Relay Type : SPER 1C1E255 S. No : EB215688

1. MECHANICAL CHECK AND VISUAL INSPECTION :


ITEM DESCRIPTION CHECKED
1 Inspect for physical damage / defects. OK
2 Verify connections as per approved drawings. OK
3 Check Ferrules OK
4 Check apparatus lists OK

2.ELECTRICAL TESTS :
ITEM DESCRIPTION CHECKED
1 Flag Operation checked. OK
2 ALL contacts checked. OK
3 All output contacts resistance measured OK

2.1 Pick up and Drop-out test :


Pick-up Voltage Drop-out Voltage
Terminal no Volt .meas(V Remarks
Volt .meas(V) Curr.meas(mA) Curr.measm(A)
)
11-21 19.7 0.35 18.7 0.32 OK

NOTE:
Drop-off voltage should be < 12V DC (Table 1 of Buyer’s Guide 1MRS 750 428-MBG).

COMPANY ABB Electrical Industries CO.LTD SEC – C0A


NAME M.ABDULLAH
SIGNATURE
DATE 19/05/2020
TEST EQUIPMENT USED: Sverker 750
SPR1C1 Page 1 of 3
Electrical Industries Co. Ltd. INSPECTION AND TEST RECORD
Description: Contract no.: Customer Ref .No
TRIP CIRCUIT SUPERVISION 4400006595 -
Customer: End Client: Sheet:
SEC-COA SEC-COA Page 2 of 3

Site: Location #: Project name:


SS 7707 , AL KHARJ 13.8 KV SWG Protection modifaction of 13.8KV Switchgear

2.2.Operation Time at Rated Voltage :


Terminal Operating Operating
no Time for Pick- up (S) Time for Drop-out (S)
16-17 826 2.99
NOTE:
Typical operate time 3 Sec (Table 2 of Buyer’s Guide 1MRS 750 428-MBG).
Typical reset time 1 Sec (Table 2 of Buyer’s Guide 1MRS 750 428-MBG).

NOTE:
The timing test should be done at the relay terminal 11(+), 21(-).
During the timing test do not disturb the Aux. Supply at terminal 18(+), 28(-).
For the operating time, the voltage at the terminal should be reduced from 48V DC to 0V DC.
For the resetting time, the voltage at the terminal should be increased from 0V DC to 48V DC

2.3.Measure Aux supply voltage and current :


Resistance
Terminal no Voltage (V) Current (mA) Power(watt)
(mΩ)
18 -28 48 5.96 0.285 4.60
Note:
The limit of supply voltage should be 48-V DC (Table 3 of Buyer’s Guide 1MRS 750 428-MBG).
The drain current should be 7mA (Table 3 of Buyer’s Guide 1MRS 750 428-MBG).
* While testing the drain current, Keep the supply at 11(+) & 21(-) 48 V DC.

2.4 POWER CONSUMPTION


Terminal no Voltage (V) Current (mA) Power(watt)
11-21 48 1.10 0.054
Cu rrent through the circuit 11(+) & 21(-) at 48 V DC should be 1.5mA
(Table 1 of Buyer’s Guide 1MRS 750 428-MBG).

NOTE:
For testing purpose, the Aux. Supply for the terminal 11, 21 and the Aux. supply for
the terminal 18, 28 must be different.
The Pick-up & Drop off test should be done at the relay terminal 11(+), 21(-).
During the pick-up & drop off test do not disturb the Aux. Supply at terminal 18(+), 28(-).
During drop-off test the voltage should be reduced gradually in steps.
For each step wait 3 Sec to find correct drop off value

COMPANY ABB Electrical Industries CO.LTD SEC – C0A


NAME M.ABDULLAH
SIGNATURE
DATE 19/05/2020
TEST EQUIPMENT USED: Sverker 750
SPR1C1 Page 2 of 3
Electrical Industries Co. Ltd. INSPECTION AND TEST RECORD
Description: Contract no.: Customer Ref .No
TRIP CIRCUIT SUPERVISION 4400006595 -
Customer: End Client: Sheet:
SEC-COA SEC-COA Page 3 of 3

Site: Location #: Project name:


SS 7707 , AL KHARJ 13.8 KV SWG Protection modifaction of 13.8KV Switchgear

2.5 CONTACT RESISTANCE

Terminal no Contcat resistance(Ω)

16-17 0.2

COMPANY ABB Electrical Industries CO.LTD SEC – C0A


NAME M.ABDULLAH
SIGNATURE
DATE 19/05/2020
TEST EQUIPMENT USED: Sverker 750
SPR1C1 Page 3 of 3