Professional Documents
Culture Documents
DATE :
DRG.NO.: PH10-1B-43-35-1101
Sr.
Test carried out for Test Description Test Result / Remark
No.
2 Apply 110V DC Supply (Control DC) Apply 110V DC at X162: 1,2 - 3,4
Switch ON MCB F120.B Check Voltage at X220.B: 1-2 Checked OK
3 Apply 110V DC Supply (BCU DC) Apply 110V DC at X131: 1,2 - 3,4
Switch ON MCB F132.B Check Voltage at A201.B (F1-F2) Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1101
K311.B Reset Short A201.B (J7-J8) with Link-1 Remote Reset Resetted OK
Closed
Press Push Button Local Reset Resetted OK
Check Continuity at X321.B: 27-28 Spare Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1101
DATE :
DRG.NO.: PH10-1B-43-35-1101
DATE :
DRG.NO.: PH10-1B-43-35-1101
1 Relay: A201.B
7SJ632 Binary Outputs Operate BO from DIGSI & Check at
BO 1 Check BI-1 at F502.B with CB Close Command Checked OK
S201.B in Service From BCU
BO 2 Spare
BO 3 Check Continuity at X321.B: 10-11 CB Remote Open Checked OK
BO 4 & 6 Check Continuity at X235: 1-3 Sync. Check Initiation Checked OK
BO 5 to 7 Spare
BO 8 Check Reset K311.B with Remote Reset Resetted OK
Link-1 Closed
BO 9 Spare
BO 10 Spare
BO 11 Check Continuity at Line VT R Phase Checked OK
X231: 1 - X710.B: 1
BO 12 & 13 Spare
BO 14 Check Continuity at Line VT Y Phase Checked OK
X231: 3 - X710.B: 2
BO 15 Check Continuity at X321.B: 7-8 CB Remote Close Checked OK
with S201.B in Service
2 Relay: F501.B
ARGUS Binary Outputs Operate BO from Relay & Check at
BO 1 Check pickup of K311.B with S501.B Pilot wire Diff. Protn. Picked Up OK
in Service, Short F871.B (6-8), Trip & O/C Guard
Link B.2 Inserted & Link -2 Closed Relay Trip
BO 2 Check BI-14 at A201.B with For DCS Indications Checked OK
S501.B in Service & Pilot Wire with O/C &
Short F871.B (1-3) Guard Relay Optd.
BO 3 Check Continuity at X838.B: 1-5 Protn. Unhealthy Checked OK
BO 4 & 5 Spare
DATE :
DRG.NO.: PH10-1B-43-35-1101
3 Relay: F502.B
7SJ802 Binary Outputs Operate BO from DIGSI & Check at
BO 1 Spare
BO 2 Check Continuity at X221.B: 8-9/ Spare Checked OK
Check Continuity at X221.B: 8-10(NC)
BO 3 Check pickup of K311.B with S502.B O/C & E/F Relay Trip. Picked Up OK
in Service, Link B.3 Inserted &
Link-2 Closed
BO 4 Check pickup of K311.B with S502.B SOTF Trip. Picked Up OK
in Service, Link B.3 Inserted &
Link-2 Closed
BO 5 Check Continuity at X221.B: 11-12 Spare Checked OK
BO 6 Check Continuity at X221.B: 13-14 Spare Checked OK
BO 7 & 8 Spare
DATE :
DRG.NO.: PH10-1B-43-35-1101
1 Relay: A201.B
7SJ632 BI Power up the relay & Inject variable DC Voltage to relay BI terminal
BI 3 F12-F14 Threshold Voltage >= 65V Checked OK
BI 7 F17-F18 Threshold Voltage >= 65V Checked OK
BI 11 K4-K5 Threshold Voltage >= 65V Checked OK
BI 15 K5-K9 Threshold Voltage >= 65V Checked OK
BI 24 R12-R13 Threshold Voltage >= 65V Checked OK
2 Relay: F502.B
7SJ802 BI Power up the relay & Inject variable DC Voltage to relay BI terminal
BI 1 C3-C4 Threshold Voltage >= 65V Checked OK
BI 7 D7-D8 Threshold Voltage >= 65V Checked OK
DATE :
DRG.NO.: PH10-1B-43-35-1101
Sr.
Test carried out for Test Description Test Result / Remark
No.
IB =
Sr.
NO. Test carried out for Test Description Test Result / Remark
A) 50/51/51N Function: ISET (A) TSET (sec) TCAL (sec) IPICKUP (A) TOPTD (sec)
3 PH RYB
1 PH RN
1 PH YN
1 PH BN
C) Stability Check:
Inject Current at in Local and 3 phase Stability Checked OK
Remote end panels 1 phase Stability Checked OK
Sr.
NO. Test carried out for Test Description Test Result / Remark
A) 50/51/51N Function: ISET (A) TSET (sec) TCAL (sec) IPICKUP (A) TOPTD (sec)
B) 49 Overload Function:
49 set at : Tau=1; K=1; IINJ= 1.6 A
Expected operating time: TEXP = 30 sec TOPTD (sec) =
DATE :
DRG.NO.: PH10-1B-43-35-1101
1 CB Tripping Circuit
Check continuity at X321.B: 9-12 Short K311.B ( 6-8 ) / Checked OK
With Link B.1 Inserted. Short X321.B: 17-18
2 CB Closing Interlock
Check continuity at X321.B: 5-6 Short X321.B: 1-2 With K312.B in Set Checked OK
Condition & K311.B in Reset Condition
3 BF Initiation -1
Check continuity at X232: 1-3 Short X201.B: 1-2, Short K311.B (5-7) Checked OK
& Link B.4 Inserted.
4 BF Initiation -2
Check continuity at X232: 5-7 Short X201.B: 3-4, Short K311.B (13-15) Checked OK
& Link B.5 Inserted.
DATE :
DRG.NO.: PH10-1B-43-35-1101
1 11KV RP DCMCB Trip / Off / Short A201.B (F3-F4) / X239: 1,2-3,4 Checked OK
BCU Unhealthy Switch OFF MCB F132.B
2 Protn/Trip Coil DC MCB Trip/Off Switch OFF MCB F110.B X838.B: 1-3 Checked OK
3 SWGR Control DC MCB Trip / Off Switch OFF MCB F120.B X838.B: 1-4 Checked OK
4 BCU BI/Alarm DC MCB Trip / Off Switch OFF MCB F131.B X838.B: 1-11 Checked OK
6 BCU Test Block in Test Position Insert Test Switch at X838.B: 1-6 Checked OK
S201.B
7 Swgr AC Supply MCB Trip / off Short X203.B: 21-22 X838.B: 1-7 Checked OK
8 SWGR Line VT MCB Trip / off Short X203.B: 21-23 X838.B: 1-8 Checked OK
9 SWGR Indication MCB Trip / off Short X203.B: 21-24 X838.B: 1-9 Checked OK