ASIAWORLD STATION COVER PERIOD: 06/23/23 – 06/1/23/

PROGRESS PHOTO

CONCRETE TOPPING
CORRIDOR-01 (C-01)

ESCALATOR PIT
ASIAWORLD STATION COVER PERIOD: 06/23/23 – 06/1/23/

PROGRESS PHOTO

INSTALLATION OF WIREMESH
CORRIDOR-01 (C-01)

PAID AREA (P-02)


ASIAWORLD STATION COVER PERIOD: 06/23/23 – 06/1/23/

PROGRESS PHOTO

APPLICATION OF EPOXY PRIMER GRAY IN ROOF TRUSS & STEEL COLUMNS


PLATFORM LEVEL
ASIAWORLD STATION COVER PERIOD: 06/23/23 – 06/1/23/

PROGRESS PHOTO

APPLICATION OF SKIMCOAT WHITE AND CONCRETE PRIMER


ST-06 (STAIR)

UNPAID AREA (CANOPY)


ASIAWORLD STATION COVER PERIOD: 06/23/23 – 06/1/23/

PROGRESS PHOTO

CORRIDOR-01 (C-01)

PIER COLUMN GL-C

S
ASIAWORLD STATION COVER PERIOD: 06/23/23 – 06/1/23/

PROGRESS PHOTO

WATERPROOFING
ELEVATOR PIT 1

PLASTERING
GRID C-E/3
ASIAWORLD STATION COVER PERIOD: 06/23/23 – 06/1/23/

PROGRESS PHOTO

ELEVATOR LIFT 1

CHB LAYING
FIRE CONTROL ROOM / PUMP ROOM