You are on page 1of 1

BREAKDOWN REPORT

DATE :

17/8/2016

SHIFT : C

MAINTENANCE SHIFT INCHARGE : ANAND

(A)-RIGID STRANDING SECTION (BREAKDOWN REMARKS/PM PLANS/OBSERVATIONS)


S NO M/C NO BD/GEN/OBSERVATION

RST-03

BD

PB REPORTED/OBSERVED

BREAK PAD ISSUE

REASON/ACTION PLAN/WORK DONE


24 CAGE TWO BREAK PAD WAS COMPLETE
WORN OUT AND ALSO ITS SOLENOID COIL
WAS DAMAGED, SO BOTH OF THEM WERE
CHANGED.

MATERIAL ISSUED/CODE TIME/DURATION

BREAK PAD 180

40MIN

FITTER/ELE

MANOJ

(B)-STEEL STRANDING SECTION (BREAKDOWN REMARKS/PM PLANS/OBSERVATIONS)


S NO M/C NO BD/GEN/OBSERVATION
TUB-01

BD

PB REPORTED/OBSERVED
PULLY PROBLEM

REASON/ACTION PLAN/WORK DONE

MATERIAL ISSUED/CODE

POST FORMING PULLY BEARING GOT


DAMAGED, AFTERMATH IT WAS CHANGED

TIME/DURATION
2:00 TO 2:20

FITTER/ELE
SHESHNARAYAN

(C)-ROD BREAKDOWN SECTION (BREAKDOWN REMARKS/PM PLANS/OBSERVATIONS)


S NO M/C NO BD/GEN/OBSERVATION
1

RBD-01

BD

PB REPORTED/OBSERVED
OIL PROBLEM

REASON/ACTION PLAN/WORK DONE

MATERIAL ISSUED/CODE

CLOTH GOT STRUCK IN FOOTVALVE WHICH


CREATING HINDERENCE DURING SUCTION OF
OIL,IT WAS THEN REMOVED AND MADE TO
START.

TIME/DURATION

1HRS 20MIN

FITTER/ELE
DINESH

2
S NO M/C NO

BD/GEN/OBSERVATION

PB REPORTED/OBSERVED

D) STEEL SPOOLER
REASON/ACTION PLAN/WORK DONE

MATERIAL ISSUED/CODE

WORKS DONE :
AT DISPATCH CRANE, TO AND FRO MOVEMENT MAKING WHEEL BEARING GOT DAMAGED, NEED TO BE CHANGED.
DRUM BUSH MADE READY AND FITTED IN ARM.
SHIFT HANDOVERD TO : VIKAS

TIME/DURATION

FITTER/ELE