FORM AR'!

A1

MATERIAL EXT. COMP Selection Criteria


Crit Service Plant Code
MUTIARA IN PLANT MTA

Line Number : 'BZ'' ''CA'' & ''CB'' Op. Pressure###


: ### psig Des. Pressure : psig
P & ID : Op. Temp : F Des. Temp : F
System : Content Test Press : psig Des. Low Temp : F
Material Spec : Rem Life: years Insulation : -
Material : Retirement Anomaly Nom Wall Corr. All Max Loss Min Wall

From : Thickness Level (inches) (inches) (inches) (inches)

To :

NDT DATA : NDT Report Number : ISO Number :


Minimum Record WT : at TML Number :

Wall Thickness Reading (inches) Wall Thickness Reading (inches)


Locn Pipe # A B C D E Locn Pipe # A B C D E
R1. BZ 2'' NR NR NR NR P1. CA SPOT A 0.240 0.238 0.237 0.239
2x3 3'' 0.312 0.316 0.308 0.323 SPOT B 0.238 0.240 0.235 0.231
P1. BZ SPOT A 0.208 0.207 0.210 0.218 SPOT C 0.241 0.237 0.236 0.240
SPOT B 0.212 0.214 0.210 0.218 E1. CA 4'' 0.266 0.250 0.237 0.272
SPOT C 0.210 0.211 0.210 0.215 P2. CA SPOT A 0.227 0.218 0.230 0.231
E1. BZ 3'' 0.400 0.387 0.390 0.398 SPOT B 0.230 0.219 0.224 0.232
P2. BZ SPOT A 0.215 0.220 0.211 0.218 SPOT C 0.228 0.228 0.230 0.227
SPOT B 0.215 0.214 0.218 0.218 P3. CA 3/4'' 0.218 0.217 0.220 0.215
SPOT C 0.217 0.209 0.211 0.213
P3. BZ 3/4'' 0.225 0.218 0.220 0.218
R1. CB 1,5'' NR NR NR NR
1,5x2 2'' 0.225 0.224 0.220 0.238
R1. CA 2'' NR NR NR NR R2. CB 2'' NR NR NR NR
2x4 4'' 0.250 0.241 0.230 0.236 2x3 3'' 0.444 0.431 0.430 0.434
.
General Condition Of Line
TASK METHOD
IC1 Low UT Acceptable Report
External Painting -
Inspection Coment Corrosion/Pitting -
Insulation -
3'' SCH 160 = 0,437 (0,382) Bolt -
3/4'' SCH 160 = 0,218 (0,191) Non Welded Joint -
4'' SCH 40 = 0,237 (0,208) Mechanical Damage -
3'' SCH 40 = 0,216 (0,189) Valves -
Supports -
Penetration -
Clamps -
Disimiliar Metals -
Vibration -
Non Conformance -
Small Bore T/Off -

Other NDT Required ? Y/N Report Close Out


Type of NDT to be carried out e.g. MPI, DPI Access Required YES NO
Additional NDT Report Number (Attached) Anomalies Reported YES NO
NDT Procedure/s
Photografic Log :
Inspector : HANDRA F.
Location : File Name :
Location : File Name : Signature :
Location : File Name :
Location : File Name : Report No : Date : 17-Sep-23
FORM AR'!A1

MATERIAL EXT. COMP Selection Criteria


Crit Service Plant Code
MUTIARA IN PLANT MTA

Line Number : 'BZ'' ''CA'' & ''CB'' Op. Pressure###


: ### psig Des. Pressure : psig
P & ID : Op. Temp : F Des. Temp : F
System : Content Test Press : psig Des. Low Temp : F
Material Spec : Rem Life: years Insulation : -
Material : Retirement Anomaly Nom Wall Corr. All Max Loss Min Wall

From : Thickness Level (inches) (inches) (inches) (inches)

To :

NDT DATA : NDT Report Number : ISO Number :


Minimum Record WT : at TML Number :

Wall Thickness Reading (inches) Wall Thickness Reading (inches)


Locn Pipe # A B C D E Locn Pipe # A B C D E
P1. CB SPOT A 0.228 0.220 0.221 0.226
SPOT B 0.216 0.210 0.222 0.221
SPOT C 0.220 0.215 0.224 0.223
E1. CB 3'' 0.230 0.212 0.221 0.232
P2. CB SPOT A 0.215 0.220 0.218 0.209
SPOT B 0.220 0.221 0.218 0.210
SPOT C 0.216 0.220 0.215 0.217
P3. CB 3/4'' 0.215 0.210 0.211 0.215

.
General Condition Of Line
TASK METHOD
IC1 Low UT Acceptable Report
External Painting -
Inspection Coment Corrosion/Pitting -
Insulation -
3'' SCH 160 = 0,437 (0,382) Bolt -
3/4'' SCH 160 = 0,218 (0,191) Non Welded Joint -
4'' SCH 40 = 0,237 (0,208) Mechanical Damage -
3'' SCH 40 = 0,216 (0,189) Valves -
Supports -
Penetration -
Clamps -
Disimiliar Metals -
Vibration -
Non Conformance -
Small Bore T/Off -

Other NDT Required ? Y/N Report Close Out


Type of NDT to be carried out e.g. MPI, DPI Access Required YES NO
Additional NDT Report Number (Attached) Anomalies Reported YES NO
NDT Procedure/s
Photografic Log :
Inspector : HANDRA F.
Location : File Name :
Location : File Name : Signature :
Location : File Name :
Location : File Name : Report No : Date : 17-Sep-23
MATERIAL EXT. COMP
MUTIARA IN PLANT
LINE NUMBER : ''BZ'' ''CA'' & ''CB''

3''

R1. BZ P1. BZ (582 CM)


2x3

P3. BZ 3/4
P2. BZ (15
CM)

E1. BZ

R1. CA P1. CA (565 CM)


2x4
4''
P3. CA
3/4
P2. CA (23 CM)

E1. CA

R2. CB
2x3

R1. CB P1. CB (565 CM)


1,5x2 6''

P3. CB
3/4 P2. CB (20
CM)

E1. CB

Criticality Date : 17-Sep-23


MATERIAL EXT. COMP
MUTIARA IN PLANT
LINE NUMBER : ''BZ'' ''CA'' & ''CB''

Criticality Date : 17-Sep-23