Professional Documents
Culture Documents
Concept Paper Daryll - 082641
Concept Paper Daryll - 082641
I. INTRODUCTION
For the past years, poor comfort rooms facilities is one of the problem why students find
it useless or inconvenient to use. With this, it's important to know whether comfort
rooms deserves its priority to be comfortable to use. With the help of this study the we
guarantee that the said will be able to determine the possible solutions of this project
and with this study this can also benefit the students in public high schools in Senator
Ninoy Aquino Sultan Kudarat and one example of public high school in Senator Ninoy
Aquino is the Senator Ninoy Aquino National High School. The cleanliness of an
educational facility’s restrooms has a major effect on how the institution is perceived. As
a student, we all know that a lot of us are not used to dirty comfort rooms in schools.
Comfortroom is one of the most important parts of the school. It is important to us,
students as we use it in our everyday lives. Not all the schools have a clean comfort
rooms with complete equipment. So, I hereby to implement a project that can help to
improve their proper hygiene.To create such project needs a better and acceptable
reasons for it to work out comfort room with lockers would be an essential and
convenient place forhardworking students.
The purpose of this report is to propose the rehabilitations of the comfort rooms in
the school. This rehabilitation will provide the students comfort rooms where they can
experience convenience and indeed,comfort. Its motive is to promote health and
personal hygiene awareness among the students.
This study aims to return awareness toward having inconvenient comfort rooms in public
school as an example of public high school in Senator Ninoy Aquino is the Senator Ninoy
Aquino National High School.
At a minimum, schools and universities need to provide comfort room that are cleaned
regularly to kill germs and preventthe spread of disease; that are outfitted with fixtures
and equipment thatward off the temptations of vandalism; and that allow for a level
ofsupervision that deters would-be bullies from using a restroom break toharass
vulnerable fellow students. In addition, facility managers looking to save energy and cut
costs should seek washroom designs that conservewater and rely less on artificial
lighting. In addition to an effective cleaning strategy, schools can fight the dissemination
of germs by selecting the right fixtures and equipment. Frequent and thorough hand
washing is a criticalstep in trying to avoid contact with germs, but even with regular
washing,restroom users can pick up germs each time they touch a door.
•To make use of the paid tuition fees and see that the money that they are paying not
only goes to therenovation of classroom and campus, but also for a safe and
comfortable restrooms.
•To give more privacy for the male students and to give female students.
• Are all comfort room's in Senator Ninoy Aquino National High School sufficient for the
students especially the Señor High School, the teachers and staffs to use?
• Does the inconvenience of Comfort rooms in Senator Ninoy Aquino National High
School affects the learning of students and working of staffs and teachers?
• Are all the comfort rooms still safe for all the users?
I hereby to implement a project that can help to improve their proper hygiene, to create
such project needs a better and acceptable reasons for it to work out comfort room with
lockers would be an essential and convenient place for hardworking students. The
proposed the methodology for this study is qualitative data collection and analysis
method. The study will involve the following steps.
• Survey: Surveyors may conduct the survey to know some information about this study.
Survey students, faculty members and also the parent to know their opinions about it
and to inform them about the benefits when it take action to this project.
• Cost Analysis: Discuss and conduct the cost of this proposed project, including the
materials needed, equipment, labors and etc.
• Data Analysis: Analyze the data collected from the survey, interview and also the
conduction of cost about this rehabilitation project.
If this project will be approved, it will build as soon as possible. By 7 months and 15 days,
it will be done and ready to use.
VIII. REFERENCE
Kennedy (2012)
Morrison (2014)