Timeline for Hand Injury During Sandblasting

Tech Manual Tech Manual NO1 Maintenance records NO1 NO1


Nozzle
Operator Maintenance not Nozzle operator Nozzle operator
#1 performed as required observed no flow disengages dead-man
Two person crew for by manufacturer through his hose switch
each tank consists of
nozzle operator and CF
blast pot operator
Operators begin
Blast pot None of the operators sandblasting of three
operator are wearing eye 100,000-gallon waste
#1 protection as required storage tanks to
by company policy prepare them for
repainting

Blast pot
operator
#2

CF 10/2001

Tech Manual Tests Valve inspection Tech Manual

Sand enters vent valve Release of the switch


Blast pot Sandblaster normally Vent valve
when rapidly escaping should de-pressurize
operators at 100 psi contaminated by sand
air entrains sand the pot

Tech Manual, Field Tech Manual


Observation

Nozzle delivery hose is Nozzle clogs


Hose
1 inch in diameter

CF

Tech Manual

Miscell-
Three waste storage
aneous
tanks need repainting

Sandblasting Timeline 1 of Sandblasting CF, FT, and Timeline.xls Page 1 of 3 3/27/2008 at 5:44 AM
Timeline for Hand Injury During Sandblasting

NO1 NO1, BPO1 BPO1, NO1 BPO1, NO1

Nozzle
Nozzle operator Nozzle operator
Operator
assumed that the hose signals blast pot
#1
was clogged operator

Operators fail to notice Nozzle operator and


that the hose is still blast pot operator
rigid, indicating a failed to notice system
BPO1 BPO1 BPO1 BPO1
pressurized system was still pressurized
Blast pot Blast pot operator Pot operator could not
Blast pot operator fails Blast pot operator
operator attempts to disconnect rotate the quick
to notice that air relief assumes that pot is
#1 hose with system connect 1/4 turn to
valve did not open depressurized
pressurized disconnect the hose

CF CF CF

Blast pot
operator
#2

Valve

Blast pot System fails to


Vent valve fails to open
depressurize

CF

Hose is still
Hose
pressurized making
removal difficult

Miscell-
aneous

Sandblasting Timeline 1 of Sandblasting CF, FT, and Timeline.xls Page 2 of 3 3/27/2008 at 5:44 AM
Timeline for Hand Injury During Sandblasting

Nozzle
Operator
#1

BPO1 BPO1 BPO1, BPO2 BPO1, BPO2 BPO1, BPO2 BPO1, BPO2 BPO1, BPO2 BPO1
Operator assumes the Operator did not
Blast pot hose is stuck because Blast pot operator asks Blast pot operator #1
consider that the
operator of past contamination second blast pot hand's cut by spraying
connector was stuck
#1 of the hose coupling operator to assist with sand
because of a
with sand and dirt removal of the hose
pressurized system
Neither blast operator Two workers work
Operators rotate Sand sprayed onto
notices that the system together to free up the
coupling worker's hands
BPO2 is not depressurized connection BPO1
Second blast pot
Blast pot operator assumes that
operator the other operator No injuries to the
#2 determined that the worker's eyes
system was
depressurized
CF

BPO1, BPO2

Blast pot
System rapidly
depressurizes

Hose

Miscell-
aneous

Sandblasting Timeline 1 of Sandblasting CF, FT, and Timeline.xls Page 3 of 3 3/27/2008 at 5:44 AM