You are on page 1of 1

Eastern Railway

(Construction Department)
Date 12.10.2023
No.CEE/CON/ER/Estt./TRD&GI779

Dy CE/Con/G/HQ
Kolkata,
Eastern Railway KM) between Murarai and Pakur
Sub- Vetting of DPR in connection with proposed 3rd line (23.91
Murarai-Pakur 3rd line dtd-12.10.2023.
Ref: - i) DyCE/Con-/HWH's letter no. DCE/Con/l/HWH/
dtd.10.10.2023.
i) Dy FA&CAO/CON's Letter no. Accts/Con/FT/Murarai-Pakur

as follows
In reference to the above, the subject DPRs observations reply of Elect(TRD) portion are

Observation Remarks
S.No

4 Electrical (TRD)
Electrical TRD estimate should be substantiated with The pegging plan design and drawing to be
wiring diagram and Pegging plan arrived after foot-by- prepared after awarded the work, during
estimate stage the scope of work derived
foot survey in keeping with requirement of realistic
working estimate. from PWP scope of work.After getting
sanction of electrification of Murarai-Pakur 3rd
line necessary wiring plan, ESP and SIP
shall be prepared with approval of Division.

In view of above, the administrative remarks are being sent herewith to competent authority for necessary
vetting and sanction please.

(Rk. KATARIA)
Dy. Chief Electrical Engineer/Con/HQ
For Chief Electrical Engineer/Con/ER