1-Load On Box
1-Load On Box
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including wearing coa = 1.275 mts.
Thickness of wc = 0.075 mts.
Thickness of Top Hor. Mem = 0.350 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
Height of Box excluding wc = 1.200 mts.
Sill level = 195.538 M
Live Load Surcharge = 0.200 t/sqm
Top of Bank level = 202.228 M
Height of earth over box = 5.140 mts.
Top level of box = 197.088 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361
Width of Box = 3.200 m.
TBL 202.228
197.088
0.350
196.738
1.275
195.538
0.350
3.200
Loads on RCC box per mt.
water load D = 0
A
E E
5 6 7 8
C C C C C C
F D D D F
1 2 3 4
B
DESIGN OF BOX ( UNDER CANAL)
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including sealing coat = 1.240 mts.
Thickness of wc = 0.075 mts.
Thickness of sc = 0.040 mts.
Thickness of Top Hor. Mem = 0.300 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
FSL of canal = 201.478 M
CBL of canal = 197.078 M
Sill level = 195.538 M
Tail water level of drain = 198.335 M
Top of Bank level = 202.228 M
Top level of box = 197.038 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361
TBL 202.228
197.038
0.300
196.738
1.240
195.538
0.350
3.200
Loads on RCC box per mt.
water load D = 0
water load D = 0
1 2 3 4
F F
B
DESIGN OF BOX ( UNDER HEAD WALL)
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including sealing coat = 1.240 mts.
Thickness of wc = 0.075 mts.
Thickness of sc = 0.040 mts.
Thickness of Top Hor. Mem = 0.300 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
FSL of canal = 201.478 M
CBL of canal = 197.078 M
Sill level = 195.538 M
Live load surcharge = 0.200 m
Tail water level of drain = 198.335 M
Top of Bank level = 202.228 M
Top of head wall level = 199.650 M
Stress under head wall level = 10.605 t/m2
Top level of box = 197.038 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361
Width of Box = 3.2
TBL 202.228
197.038
0.300
196.738
1.240
195.538
0.350
3.200
Loads on RCC box per mt.
water load D = 0
A
H
E E H
5 6 7 8
C C C C C C
G G G
J
J D D D
1 2 3 4
F F
B
DESIGN OF BOX ( UNDER CANAL)
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including sealing coat = 1.240 mts.
Thickness of wc = 0.075 mts.
Thickness of sc = 0.040 mts.
Thickness of Top Hor. Mem = 0.350 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
FSL of canal = 201.478 M
CBL of canal = 197.078 M
Sill level = 195.538 M
Tail water level of drain = 198.335 M
Top of Bank level = 202.228 M
Top level of box = 197.088 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361
TBL 202.228
197.088
0.350
196.738
1.240
195.538
0.350
3.200
Loads on RCC box per mt.
water load D = 0
water load D = 0
1 2 3 4
F F
B