You are on page 1of 10

DESIGN OF BOX ( UNDER EARTH BANK)

No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including wearing coa = 1.275 mts.
Thickness of wc = 0.075 mts.
Thickness of Top Hor. Mem = 0.350 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
Height of Box excluding wc = 1.200 mts.
Sill level = 195.538 M
Live Load Surcharge = 0.200 t/sqm
Top of Bank level = 202.228 M
Height of earth over box = 5.140 mts.
Top level of box = 197.088 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361
Width of Box = 3.200 m.

TBL 202.228

197.088
0.350
196.738

1.275

195.538
0.350

0.35 2.50 0.00 0.00 0.00 0.00 0.35

3.200
Loads on RCC box per mt.

Wt. of top member = 3.200 x 0.350 x 2.500 = 2.800 t


Wt. of bottom member = 3.200 x 0.350 x 2.500 = 2.800 t
Wt. of vertical walls (end = 2 x 1.275 x 0.350 x 2.500 = 2.231 t
Wt. of vertical walls (mid) = 0 x 1.275 x 0.000 x 2.500 = 0.000 t
Wt. of water = 1 x 1.200 x 2.500 x 1.000 = 3.000 t
Wt. of wc = 1 x 2.500 x 0.075 x 2.400 = 0.450 t
Wt. of Earth over the box = 5.140 x 3.200 x 2.100 = 34.541 t
Load due to Live load = 0.200 x 3.200 = 0.640 t
TOTAL 46.462

CASE 1 BOX EMPTY


Total wt. of box(without water) = 46.462 - 3.000 = 43.462 t

net upward soil reaction B = 43.462 - 2.800 - 0.450 = 12.566 t/m2


3.200
load on top of slab A = 34.541 + 0.640 + 2.800 = 11.869 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 2.100 x 5.315 = 4.029 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 6.940 = 5.261 t/m2


CASE 2 BOX FULL
Total wt. of box = = 46.462 t

net upward soil reaction B = 46.462 - 2.800 - 0.450 = 13.504 t/m2


3.200
load on top of slab A = 34.541 + 0.640 * 2.800 = 11.869 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 1.200 t/m2

earth pr. At top E = 0.361 x 2.100 x 5.315 = 4.029 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 6.940 = 5.261 t/m2

A
E E

5 6 7 8
C C C C C C

F D D D F

1 2 3 4

B
DESIGN OF BOX ( UNDER CANAL)
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including sealing coat = 1.240 mts.
Thickness of wc = 0.075 mts.
Thickness of sc = 0.040 mts.
Thickness of Top Hor. Mem = 0.300 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
FSL of canal = 201.478 M
CBL of canal = 197.078 M
Sill level = 195.538 M
Tail water level of drain = 198.335 M
Top of Bank level = 202.228 M
Top level of box = 197.038 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361

TBL 202.228

197.038
0.300
196.738

1.240

195.538
0.350

0.35 2.50 0.00 0.00 0.00 0.00 0.35

3.200
Loads on RCC box per mt.

Wt. of top member = 3.200 x 0.300 x 2.500 = 2.400 t


Wt. of bottom member = 3.200 x 0.350 x 2.500 = 2.800 t
Wt. of vertical walls (end = 2 x 1.240 x 0.350 x 2.500 = 2.170 t
Wt. of vertical walls (mid) = 0 x 1.240 x 0.000 x 2.500 = 0.000 t
Wt. of sealing coat = 1 x 2.500 x 0.040 x 2.400 = 0.240 t
Wt. of water = 1 2.500 x 1.200 x 1.000 = 3.000 t
Wt. of wc = 1 x 2.500 x 0.075 x 2.400 = 0.450 t
Wt. of water over the box = 3.200 x 4.400 x 1.000 = 14.080 t
TOTAL 25.140

CASE 1 BOX EMPTY - CANAL EMPTY


Total wt. of box(without water) = 25.140 - 3.000 - 14.080 = 8.060 t

net upward soil reaction B = 8.060 - 2.400 - 0.450 = 1.628 t/m2


3.200
load on top of slab A = 2.400 + 0.450 = 0.891 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 2.100 x 0.225 = 0.171 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 1.750 = 1.327 t/m2


CASE 2 BOX FULL - CANAL EMPTY

Total wt. of box(with water) = 25.140 - 14.080 = 11.060 t

net upward soil reaction B = 25.140 - 2.400 - 0.450 = 6.966 t/m2


3.200
load on top of slab A = 2.400 + 0.450 * 0.000 = 0.891 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 2.100 x 0.225 = 0.171 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 1.750 = 1.327 t/m2

upward thrust on top slab G = 1.597 x 1.000 = 1.597 t/m3

CASE 3 BOX EMPTY - CANAL FULL

Total wt. of box = 25.140 - 3.000 = 22.140 t

net upward soil reaction B = 22.140 - 2.400 - 0.450 = 6.028 t/m2


3.200
load on top of slab A = 14.080 + 2.400 + 0.450 = 5.291 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 1.100 x 0.225 = 0.089 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.750 = 0.695 t/m2

water pr. At top H = 4.590 x 1.000 = 4.590 t/m2

water pr. At bottom J = 6.155 x 1.000 = 6.155 t/m2

CASE 4 BOX FULL - CANAL FULL

Total wt. of box = = 25.140 t

net upward soil reaction B = 25.140 - 2.400 - 0.450 = 6.966 t/m2


3.200
load on top of slab A = 14.080 + 2.400 + 0.450 = 5.291 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 1.100 x 0.225 = 0.089 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.750 = 0.695 t/m2

water pr. At top H = 4.590 x 1.000 = 4.590 t/m2

water pr. At bottom J = 6.155 x 1.000 = 6.155 t/m2


A
H
E E H
5 6 7 8
C C C C C C
G G G
J
J D D D

1 2 3 4
F F
B
DESIGN OF BOX ( UNDER HEAD WALL)
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including sealing coat = 1.240 mts.
Thickness of wc = 0.075 mts.
Thickness of sc = 0.040 mts.
Thickness of Top Hor. Mem = 0.300 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
FSL of canal = 201.478 M
CBL of canal = 197.078 M
Sill level = 195.538 M
Live load surcharge = 0.200 m
Tail water level of drain = 198.335 M
Top of Bank level = 202.228 M
Top of head wall level = 199.650 M
Stress under head wall level = 10.605 t/m2
Top level of box = 197.038 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361
Width of Box = 3.2

TBL 202.228

197.038
0.300
196.738

1.240

195.538
0.350

0.35 2.50 0.35 2.50 0.35 2.50 0.35

3.200
Loads on RCC box per mt.

Wt. of top member = 3.200 x 0.300 x 2.500 = 2.400 t


Wt. of bottom member = 3.200 x 0.350 x 2.500 = 2.800 t
Wt. of vertical walls (end = 2 x 1.240 x 0.350 x 2.500 = 2.170 t
Wt. of vertical walls (mid) = 0 x 1.240 x 0.350 x 2.500 = 0.000 t
Wt. of water = 1 x 2.500 x 1.200 x 1.000 = 3.000 t
Wt. of wc = 1 x 2.500 x 0.075 x 2.400 = 0.450 t
Stress under head wall = 10.605 x 3.200 = 33.936 t
TOTAL 44.756

CASE 1 BOX EMPTY


Total wt. of box(without water) = 44.756 - 3.000 = 41.756 t

net upward soil reaction B = 41.756 - 2.400 - 0.450 = 12.158 t/m2


3.200
load on top of slab A = 10.605 + 0.300 * 2.500 = 11.355 t/m2
1.000
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 2.100 x 2.962 = 2.245 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 3.312 = 2.511 t/m2


CASE 2 BOX FULL

Total wt. of box(with water) = = 44.756 t

net upward soil reaction B = 44.756 - 2.400 - 0.450 = 13.096 t/m2


3.200
load on top of slab A = 10.605 + 0.300 * 2.500 = 11.355 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 2.100 x 2.962 = 2.245 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 3.312 = 2.511 t/m2

A
H
E E H
5 6 7 8
C C C C C C
G G G
J
J D D D

1 2 3 4
F F
B
DESIGN OF BOX ( UNDER CANAL)
No. of Vents = 1
Height of Box 1.200 mts.
Width of Box = 2.500 mts.
Height of Box including sealing coat = 1.240 mts.
Thickness of wc = 0.075 mts.
Thickness of sc = 0.040 mts.
Thickness of Top Hor. Mem = 0.350 mts.
Thickness of Bottom Hor. Mem = 0.350 mts.
Thickness of Ver.(end) Mem = 0.350 mts.
Thickness of Middle Mem = 0.350 mts.
FSL of canal = 201.478 M
CBL of canal = 197.078 M
Sill level = 195.538 M
Tail water level of drain = 198.335 M
Top of Bank level = 202.228 M
Top level of box = 197.088 M
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361

TBL 202.228

197.088
0.350
196.738

1.240

195.538
0.350

0.35 2.50 0.00 0.00 0.00 0.00 0.35

3.200
Loads on RCC box per mt.

Wt. of top member = 3.200 x 0.350 x 2.500 = 2.800 t


Wt. of bottom member = 3.200 x 0.350 x 2.500 = 2.800 t
Wt. of vertical walls (end = 2 x 1.240 x 0.350 x 2.500 = 2.170 t
Wt. of vertical walls (mid) = 0 x 1.240 x 0.000 x 2.500 = 0.000 t
Wt. of sealing coat = 1 x 2.500 x 0.040 x 2.400 = 0.240 t
Wt. of water = 1 2.500 x 1.200 x 1.000 = 3.000 t
Wt. of wc = 1 x 2.500 x 0.075 x 2.400 = 0.450 t
Wt. of water over the box = 3.200 x 4.400 x 1.000 = 14.080 t
TOTAL 25.540

CASE 1 BOX EMPTY - CANAL EMPTY


Total wt. of box(without water) = 25.540 - 3.000 - 14.080 = 8.460 t

net upward soil reaction B = 8.460 - 2.800 - 0.450 = 1.628 t/m2


3.200
load on top of slab A = 2.800 + 0.450 = 1.016 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 2.100 x 0.250 = 0.190 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 1.800 = 1.365 t/m2


CASE 2 BOX FULL - CANAL EMPTY

Total wt. of box(with water) = 25.540 - 14.080 = 11.460 t

net upward soil reaction B = 25.540 - 2.800 - 0.450 = 6.966 t/m2


3.200
load on top of slab A = 2.800 + 0.450 * 0.000 = 1.016 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 2.100 x 0.250 = 0.190 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 1.800 = 1.365 t/m2

upward thrust on top slab G = 1.597 x 1.000 = 1.597 t/m3

CASE 3 BOX EMPTY - CANAL FULL

Total wt. of box = 25.540 - 3.000 = 22.540 t

net upward soil reaction B = 22.540 - 2.800 - 0.450 = 6.028 t/m2


3.200
load on top of slab A = 14.080 + 2.800 + 0.450 = 5.416 t/m2
3.200
water pressure C = 0

water load D = 0

earth pr. At top E = 0.361 x 1.100 x 0.250 = 0.099 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.800 = 0.715 t/m2

water pr. At top H = 4.565 x 1.000 = 4.565 t/m2

water pr. At bottom J = 6.155 x 1.000 = 6.155 t/m2

CASE 4 BOX FULL - CANAL FULL

Total wt. of box = = 25.540 t

net upward soil reaction B = 25.540 - 2.800 - 0.450 = 6.966 t/m2


3.200
load on top of slab A = 14.080 + 2.800 + 0.450 = 5.416 t/m2
3.200
water pressure C = 0 TO 1.200 t/m2

water load D = 0 TO 1.200 t/m2

earth pr. At top E = 0.361 x 1.100 x 0.250 = 0.099 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.800 = 0.715 t/m2

water pr. At top H = 4.565 x 1.000 = 4.565 t/m2

water pr. At bottom J = 6.155 x 1.000 = 6.155 t/m2


A
H
E E H
5 6 7 8
C C C C C C
G G G
J
J D D D

1 2 3 4
F F