Update (Module 1)
As of August 24, 2023
Module 1- House 1: Scope of Work 1/5
*Structural completed
SCOPE OF WORK STATUS REMARKS MATERIAL LACKING
1. ROOFING:
Layout COMPLETED
2. PLUMBING WORKS
Foundation COMPLETED
Flooring COMPLETED
Corrections On-going…
Module 1- House 2: Scope of Work 1/5
*Structural completed
SCOPE OF WORK STATUS REMARKS MATERIAL LACKING
1. ROOFING:
SKOV installation plus controls 90% Control panel installed Cable pulling and tapping
Module 1- House 2: Scope of Work 3/5
Layout COMPLETED
2. PLUMBING WORKS
Foundation COMPLETED
Flooring COMPLETED
Rain water canal (outside) 80% On-going chb piling (rear) Flooring
Corrections 0%
Module 1- House 3: Scope of Work 1/5
SCOPE OF WORK STATUS REMARKS MATERIAL LACKING
1. ROOFING:
Layout 0%
2. PLUMBING WORKS
Foundation COMPLETED
Flooring COMPLETED
Rain water canal (outside) 80% On-going chb piling (rear) Flooring
Corrections 0%
Module 1- Auxiliary Buildings
3. WALL INSTALLATION:
Rectification of PU junction 0%
Module 2- House 1: Scope of Work 2/5
SCOPE OF WORK STATUS REMARKS LACKING
1. ROXELL FEEDING SYSTEM
Layout
Assembly of parts (feet)
Assembly of parts (body)
Assembly of conveyor and
installation
Installation of flaps and roofing
2. PLUMBING WORKS
Foundation
Flooring
Waste water canal (inside)
Rain water canal (outside)
Skirting (outside)
Skirting (inside)
Waste water septic tank
Corrections
Module 2- House 2: Scope of Work 1/5 (August 7-on-going)
SCOPE OF WORK STATUS REMARKS MATERIAL LACKING
1. STRUCTURAL:
Installation of runners
Rectification of PU junction
Module 2- House 2: Scope of Work 2/5
SCOPE OF WORK STATUS REMARKS LACKING
1. ROXELL FEEDING SYSTEM
Layout
Assembly of parts (feet)
Assembly of parts (body)
Assembly of conveyor and
installation
Installation of flaps and roofing
2. PLUMBING WORKS
Foundation
Flooring
Waste water canal (inside)
Rain water canal (outside)
Skirting (outside)
Skirting (inside)
Waste water septic tank
Corrections
Module 2- House 3: Scope of Work 1/5
SCOPE OF WORK STATUS REMARKS MATERIAL LACKING
1. STRUCTURAL:
2. ROOFING:
Installation of runners
Rectification of PU junction
Module 2- House 3: Scope of Work 2/5
SCOPE OF WORK STATUS REMARKS LACKING
1. ROXELL FEEDING SYSTEM
Layout
Assembly of parts (feet)
Assembly of parts (body)
Assembly of conveyor and
installation
Installation of flaps and roofing
2. PLUMBING WORKS
Foundation
Flooring
Waste water canal (inside)
Rain water canal (outside)
Skirting (outside)
Skirting (inside)
Waste water septic tank
Corrections
WINES – BRIDGE BOX CULVERT
Foundation COMPLETED
Flooring/CARRAIGEWAY COMPLETED
NOT YET TURNOVER TO
WINGWALL COMPLETED THE BRIDGE IS NOW GOVERNMENT
ACCESSIBLE
COMLETED C/O MAM HELEN
REINFORCING BARS