Wines Module 1 Poultry Houses August 7 2023
Wines Module 1 Poultry Houses August 7 2023
Project
Kamagong Farm
Update (Module 1)
As of August 7, 2023
Module 1- House 1: Scope of Work 1/5
*Structural completed
SCOPE OF WORK STATUS REMARKS MATERIAL LACKING
1. ROOFING:
Layout COMPLETED
2. PLUMBING WORKS
Foundation COMPLETED
Flooring COMPLETED
Corrections On-going…
Module 1- House 2: Scope of Work 1/5
*Structural completed
SCOPE OF WORK STATUS REMARKS MATERIAL LACKING
1. ROOFING:
Layout COMPLETED
2. PLUMBING WORKS
Foundation COMPLETED
Flooring COMPLETED
Rain water canal (outside) 80% On-going chb piling (rear) Flooring
Corrections 0%
Module 1- House 3: Scope of Work 1/5
Cable pulling and termination 90% On-going light laying (T8) Finishing
2. PLUMBING WORKS
Foundation COMPLETED
Flooring COMPLETED
Rain water canal (outside) 80% On-going chb piling (rear) Flooring
Corrections 0%
Module 1- Auxiliary Buildings
2. ROOFING:
Installation of runners
Rectification of PU junction
Module 2- House 4: Scope of Work 2/5
SCOPE OF WORK STATUS REMARKS LACKING
1. ROXELL FEEDING SYSTEM
Layout
Assembly of parts (feet)
Assembly of parts (body)
Assembly of conveyor and
installation
Installation of flaps and roofing
Installation of plastic slots
Module 2- House 4: Scope of Work 4/5
SCOPE OF WORK STATUS REMARKS LACKING
1. ELECTRICAL WORKS
2. PLUMBING WORKS
Foundation COMPLETED
Flooring COMPLETED
Skirting (outside)
Skirting (inside)
Waste water septic tank
Corrections
Module 2- House 5: Scope of Work 1/5
2. ROOFING:
PU roof installation
Installation of runners
Rectification of PU junction
Module 2- House 5: Scope of Work 2/5
SCOPE OF WORK STATUS REMARKS LACKING
1. ROXELL FEEDING SYSTEM
Layout
Assembly of parts (feet)
Assembly of parts (body)
Assembly of conveyor and
installation
Installation of flaps and roofing
Installation of plastic slots
Module 2- House 5: Scope of Work 4/5
SCOPE OF WORK STATUS REMARKS LACKING
1. ELECTRICAL WORKS
2. PLUMBING WORKS
Foundation
Flooring
Waste water canal (inside)
Rain water canal (outside)
Skirting (outside)
Skirting (inside)
Waste water septic tank
Corrections
Module 2- House 6: Scope of Work 1/5
2. ROOFING:
Installation of runners
Rectification of PU junction
Module 2- House 6: Scope of Work 2/5
SCOPE OF WORK STATUS REMARKS LACKING
1. ROXELL FEEDING SYSTEM
Layout
Assembly of parts (feet)
Assembly of parts (body)
Assembly of conveyor and
installation
Installation of flaps and roofing
Installation of plastic slots
Module 2- House 6: Scope of Work 4/5
SCOPE OF WORK STATUS REMARKS LACKING
1. ELECTRICAL WORKS
2. PLUMBING WORKS
Foundation COMPLETED
Flooring COMPLETED
Skirting (outside)
Skirting (inside)
Waste water septic tank
Corrections
Module 2- Auxiliary Buildings