Professional Documents
Culture Documents
Itard
Performance comparison: guided example
Photo Sun Emits a Solstice CME by NASA Goddard Space Flight Center, CC BY 2.0
https://creativecommons.org/licenses/by/2.0/ . Changes made by Rins Lindeman, 2020
Prof. Dr. L.C.M. Itard
Performance comparison: guided example
Photo Sun Emits a Solstice CME by NASA Goddard Space Flight Center, CC BY 2.0
https://creativecommons.org/licenses/by/2.0/ . Changes made by Rins Lindeman, 2020
Choice of the energy supply of a building
Case 1: Office building in the Netherlands
Nominal Heating Load
450 = 421 kW
400
50
2000000 Space
0 854052 heating
(kWh)
1 731 1461 2191 2921 3651 4381 5111 5841 6571 7301 8031
1500000
Time (hours) from January 1st,1:00 to December 31st, 24:00
59432 Hot tap
40 m
72 m
Hourly cooling demand (kWh)
800
600
500
Nominal power space heating: 421 kW
Cooling demand: 297 505 kWh.
400
300
200
Nominal power space cooling: 921 kW
100
0
1 731 1461 2191 2921 3651 4381 5111 5841 6571 7301 8031
Time (hours) from January 1st,1:00 to December 31st, 24:00
Options
1. Condensing gas boiler (η=0.95) + air chiller with SEER 2
2. Reversible ground source Heat pump with SCOP 5 for space
heating and SEER 4
Annual Primary
Annual resource
Energy: 899 MWh
depletion: 91735 m3
gas
η PE to Final: 1 Specific emissions
NL: 0.2 CO2-eq/kWh PE
Annual heating Annual CO2-eq
demand: 854 MWh emissions fuels
Final annual NL: 180 t CO2-eq
energy: 899 MWh
Annual energy costs
η Final to Demand:
59628 €
0.95
Final Energy price
0.65 €/m3 Total annual
energy costs:
Annual equivalent 61593 €
Investments costs Investment costs Investment costs
70 €/kW 29470 € 1965 €
Nominal load
Service life: 15 years
heating 421 kW
Option 1: Gas boiler & Chiller
1b: Chiller
Energy content fuel
59%gas,with 9.8
kWh/m3; 14.4% coal
with 8.2 kWh/kg
Nominal load
Service life: 15
cooling: 921 kW
years
Option 2: Reversible heat pump
Nominal load
Service life: 15
heating:
years
921x5/4=1150 kW
Summary of performances