5 MM GROOVE LINE
1. ALL DRAWING TO BE READ
TO BE CONFIRMED
IN CONJUNCTION WITH GENERAL
TO BE CONFIRMED
DOOR HANDLE
BY OPERATOR
FINISHES SCHEDULE, FOR ,
DOOR GUARD
TIMBER VENEER
TIMBER JAMB
DOOR HANDLE
BY OPERATOR
INDICATED
DO2.01-02
03
01
01
01
01
05
01
01
2. ID CONTRACTOR TO SUBMIT
A
FINISH
WD
WD
WD
IR
IR
IR
IR
DRAWINGS FOR ID CONSULTANTS
REVIEW AND APPROVAL.
3. ID CONTRACTOR TO SUBMIT SAMPLE
FINISHES FOR ID CONSULTANTS
REVIEW AND APPROVAL.
4. ALL M&E/LIGHTING INTERFACE TO BE
Scale 1:10
Scale 1:10
1300
FOYER
B
-
ELEVATION
PLAN
A
B
PT. PURI ZUQNI
TIMBER JAMB
DOOR HINGES
WD 01
IR
1:10 MAR' 13
WD 01
TIMBER JAMB
DETAIL
A Scale 1:2
1:2 MAR' 13
TIMBER LINING
DOOR HANDLE
DOOR HANDLE
SAMPLE, PLEASE REFER TO
TIMBER JAMB
IR 01A
WD 01
WD 01
01
01
WD 01
WD 01
2. ID CONTRACTOR TO SUBMIT
SETTING OUT AND DETAIL SHOP
WD
WD
IR
Scale 1:10
5. COLUMN & BEAM SIZES TO BE
CONFIRMED BY STRUCTURAL
ENGINEER.
6. REFER TO ARCHITECTURAL
20
20
sld
DRAWINGS.
WARDROBE
BATHROOM
50 50
900
940
DO2.02-02
A
470
sld
sld
ELEVATION
PLAN
50 50 95
20
B
A
1:10 MAR' 13
50
NOTES:
1. ALL DRAWING TO BE READ
IN CONJUNCTION WITH GENERAL
FINISHES SCHEDULE, FOR ,
20 SAMPLE, PLEASE REFER TO
KING MOCK-UP UNIT ON SITE.
2. ID CONTRACTOR TO SUBMIT
SETTING OUT AND DETAIL SHOP
40
50
50
DRAWINGS FOR ID CONSULTANTS
REVIEW AND APPROVAL.
3. ID CONTRACTOR TO SUBMIT SAMPLE
FINISHES FOR ID CONSULTANTS
REVIEW AND APPROVAL.
5 4. ALL M&E/LIGHTING INTERFACE TO BE
CONFIRMED BY RELATED CONSULTANS.
5. COLUMN & BEAM SIZES TO BE
CONFIRMED BY STRUCTURAL
ENGINEER.
6. REFER TO ARCHITECTURAL
GLAZING DETAILS/SECTION FOR
95
DETAIL
7. ALL ARCH MIRRORS AT BATHROOM
WITH HEATED PAD/DEMISTER BEHIND.
8. ALL ACOUSTICAL REQUEREMENTS
REFER TO ACOUSTIC CONSULTANTS
RECOMMENDATIONS. THIS NEEDS TO
BE THIS REFLECTED IN ALL SHOP
B
DRAWINGS.
DOOR HANDLE
TIMBER JAMB
01A
06
01
01
06
B
-
WD
WD
IR
IR
IR
Scale 1:10
900
40 55
SECTION
PADMA RESORT PUHU
100
20 575 595 5 595 5 595 5
A
2400
A/S MAR' 13
SECTION
NOTES:
1. ALL DRAWING TO BE READ
C
5 IN CONJUNCTION WITH GENERAL
FINISHES SCHEDULE, FOR ,
SAMPLE, PLEASE REFER TO
KING MOCK-UP UNIT ON SITE.
2. ID CONTRACTOR TO SUBMIT
HINGES WHERE APPLICABLE
DOOR HANDLE
BY OPERATOR
TIMBER JAMB
TIMBER JAMB
FIXED PANEL
REVIEW AND APPROVAL.
INDICATED
01B
02
WD 01
WD 01
WD 01
WD 01
03
01
WD 01
WD 01
3. ID CONTRACTOR TO SUBMIT SAMPLE
FINISHES FOR ID CONSULTANTS
WD
IR
IR
IR
REVIEW AND APPROVAL.
4. ALL M&E/LIGHTING INTERFACE TO BE
CONFIRMED BY RELATED CONSULTANS.
Scale 1:10
5. COLUMN & BEAM SIZES TO BE
CONFIRMED BY STRUCTURAL
ENGINEER.
Scale 1:10
6. REFER TO ARCHITECTURAL
GLAZING DETAILS/SECTION FOR
WINDOW TREATMENT INTERFACE.
7. ALL ARCH MIRRORS AT BATHROOM
WITH HEATED PAD/DEMISTER BEHIND.
8. ALL ACOUSTICAL REQUEREMENTS
REFER TO ACOUSTIC CONSULTANTS
RECOMMENDATIONS. THIS NEEDS TO
BE THIS REFLECTED IN ALL SHOP
DRAWINGS.
B
-
860
C
-
ELEVATION
PLAN
20
PT. PURI ZUQNI
A
B
PADMA RESORT PUHU
TIMBER JAMB
TO BE CONFIRMED BY OPERATOR
01B
WD
DO2.03-02
A
01
IR
1:10 MAR' 13
WD 01 NOTES:
TIMBER VENEER FINISH
1. ALL DRAWING TO BE READ
IN CONJUNCTION WITH GENERAL
FINISHES SCHEDULE, FOR ,
SAMPLE, PLEASE REFER TO
KING MOCK-UP UNIT ON SITE.
2. ID CONTRACTOR TO SUBMIT
SETTING OUT AND DETAIL SHOP
DRAWINGS FOR ID CONSULTANTS
REVIEW AND APPROVAL.
3. ID CONTRACTOR TO SUBMIT SAMPLE
FINISHES FOR ID CONSULTANTS
ACCOUSTICAL SEAL AS REQUIRED REVIEW AND APPROVAL.
BY LOCAL AUTHORITIES 4. ALL M&E/LIGHTING INTERFACE TO BE
CONFIRMED BY RELATED CONSULTANS.
5. COLUMN & BEAM SIZES TO BE
CONFIRMED BY STRUCTURAL
ENGINEER.
6. REFER TO ARCHITECTURAL
GLAZING DETAILS/SECTION FOR
WINDOW TREATMENT INTERFACE.
7. ALL ARCH MIRRORS AT BATHROOM
WITH HEATED PAD/DEMISTER BEHIND.
185
WD 01
TIMBER JAMB
WD 01
TIMBER VENEER FINISH
IR 02
DOOR HINGES
TO ALLOW 180°
OPENING OF THE DOOR
1:2 MAR' 13
225
WD 01
sld
40
TIMBER VENEER FINISH
sld
sld
WD 01
810 TIMBER JAMB
B
- IR 01A
NOTES:
DOOR HANDLE
TO BE CONFIRMED BY OPERATOR 1. ALL DRAWING TO BE READ
PLAN IN CONJUNCTION WITH GENERAL
A Scale 1:20
FINISHES SCHEDULE, FOR ,
SAMPLE, PLEASE REFER TO
KING MOCK-UP UNIT ON SITE.
2. ID CONTRACTOR TO SUBMIT
SETTING OUT AND DETAIL SHOP
DRAWINGS FOR ID CONSULTANTS
REVIEW AND APPROVAL.
B 3. ID CONTRACTOR TO SUBMIT SAMPLE
FINISHES FOR ID CONSULTANTS
DO2.04-02
REVIEW AND APPROVAL.
4. ALL M&E/LIGHTING INTERFACE TO BE
CONFIRMED BY RELATED CONSULTANS.
5. COLUMN & BEAM SIZES TO BE
IR 06A
20
CONFIRMED BY STRUCTURAL
10
SLIDING TRACK
ENGINEER.
20
6. REFER TO ARCHITECTURAL
WD 01 GLAZING DETAILS/SECTION FOR
TIMBER JAMB WINDOW TREATMENT INTERFACE.
565
665
fixed sld sld sld 7. ALL ARCH MIRRORS AT BATHROOM
WITH HEATED PAD/DEMISTER BEHIND.
WD 01
8. ALL ACOUSTICAL REQUEREMENTS
TIMBER VENEER FINISH
REFER TO ACOUSTIC CONSULTANTS
RECOMMENDATIONS. THIS NEEDS TO
5
5
DRAWINGS.
GROOVE LINE 5 MM
595
595
60
2400
2400
2380
5
IR 01A
DOOR HANDLE
595
TO BE CONFIRMED BY OPERATOR
595
5
5
900
900
585
595
810 PT. PURI ZUQNI
IR 06A
10
FLOOR GUIDE
5
PADMA RESORT PUHU
40
20 3140 20
3180 225
1:20 MAR' 13
WD 01
SOLID TIMBER EDGE
10
NOTES:
1. ALL DRAWING TO BE READ
IN CONJUNCTION WITH GENERAL
FINISHES SCHEDULE, FOR ,
SAMPLE, PLEASE REFER TO
KING MOCK-UP UNIT ON SITE.
2. ID CONTRACTOR TO SUBMIT
SETTING OUT AND DETAIL SHOP
DRAWINGS FOR ID CONSULTANTS
REVIEW AND APPROVAL.
3. ID CONTRACTOR TO SUBMIT SAMPLE
FINISHES FOR ID CONSULTANTS
REVIEW AND APPROVAL.
20
4. ALL M&E/LIGHTING INTERFACE TO BE
CONFIRMED BY RELATED CONSULTANS.
5. COLUMN & BEAM SIZES TO BE
CONFIRMED BY STRUCTURAL
IR 01A
ENGINEER.
DOOR HANDLE 6. REFER TO ARCHITECTURAL
TO BE CONFIRMED BY OPERATOR
20 5 5 40 5 40 5 35 5 25
GLAZING DETAILS/SECTION FOR
5 WINDOW TREATMENT INTERFACE.
WD 01
7. ALL ARCH MIRRORS AT BATHROOM
SOLID TIMBER JAMB
WITH HEATED PAD/DEMISTER BEHIND.
8. ALL ACOUSTICAL REQUEREMENTS
225 REFER TO ACOUSTIC CONSULTANTS
RECOMMENDATIONS. THIS NEEDS TO
BE THIS REFLECTED IN ALL SHOP
DRAWINGS.
2440
ACCOUSTIC SEAL 6 22 6
2465
60
5
GROOVE LINE 5 MM
40
WD 01
SOLID TIMBER EDGE
WD 01
TIMBER VENEER FINISH
10 790 10
810 20
IR 01A
DOOR HANDLE
TO BE CONFIRMED BY OPERATOR
IR 06A
SLIDING TRACK 25 40 5 40 5 40 5 40 25
GUESTROOM DOOR DETAIL
225
DO2.04 BEDROOM SLIDING DOOR
DETAIL
DETAIL
B Scale 1:2
1:2 MAR' 13
10
Scale 1:10
+2400
NOTES:
1. ALL DRAWING TO BE READ
IN CONJUNCTION WITH GENERAL
SECTION
1000 FINISHES SCHEDULE, FOR ,
SAMPLE, PLEASE REFER TO
2400 KING MOCK-UP UNIT ON SITE.
2. ID CONTRACTOR TO SUBMIT
SETTING OUT AND DETAIL SHOP
DRAWINGS FOR ID CONSULTANTS
REVIEW AND APPROVAL.
SLIDING GLASS DOOR
RUNNING TRACK
RUNNING TRACK
RUNNING TRACK
C
RUNNING TRACK
WITH SQUARE
WITH SQUARE
GLASS DIVIDER
GLASS PATCH
GLASS PATCH
TIMBER LINING
COVER CAPS
COVER CAPS
DOOR HANDLE
DOOR HANDLE
FINISHES FOR ID CONSULTANTS
RETAINER
RETAINER
01C
06B
06B
06B
06B
06B
WD
01
04
04
04
04
REVIEW AND APPROVAL.
4. ALL M&E/LIGHTING INTERFACE TO BE
01
GL
GL
GL
GL
GL
IR
IR
IR
IR
IR
IR
CONFIRMED BY RELATED CONSULTANS.
5. COLUMN & BEAM SIZES TO BE
CONFIRMED BY STRUCTURAL
ENGINEER.
6. REFER TO ARCHITECTURAL
GLAZING DETAILS/SECTION FOR
Scale 1:10
Scale 1:10
WINDOW TREATMENT INTERFACE.
7. ALL ARCH MIRRORS AT BATHROOM
WITH HEATED PAD/DEMISTER BEHIND.
8. ALL ACOUSTICAL REQUEREMENTS
REFER TO ACOUSTIC CONSULTANTS
RECOMMENDATIONS. THIS NEEDS TO
60
60
BE THIS REFLECTED IN ALL SHOP
DRAWINGS.
1000
B
-
1885
905
sld
1100
1100
sld
C
-
ELEVATION
60
PLAN
B