Professional Documents
Culture Documents
Revisions
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
DEVELOPER:
OWNER:
PLOT LIMIT
PLOT LIMIT
A1 65.77
A IDF RACK
A
SHAFT
42U AT H/L
SHAFT AT HIGH LEVEL SHAFT AT H/L
D
10
D
20
11 9 1 19
D
12 8 2 18
D
13 7 3 17
A2 14 6 4 16
15 5 5 15
16 4 6 14
17 3 7 13
18 2 8 12
19
20
1
RAISED FLOOR
9
10
11
OPERATOR:
A3
7
NOT
18.6
17.21
ACCESSIBLE
OPENING AT H/L FOR GUEST
B B
ARCHITECT:
C C
A4
TANK PIT (TYP)
D 400x400x200mm DRAIN TRENCH D
(SECTION DETAIL-A) 3000x200x350mm 800X800 ACCESS
SUMP PIT LINE
3000x2000x1800mm
(SECTION DETAILS-B)
E OPENING AT H/L WITH ACCESS 600x600 E
CONSULTANT:
GULLY TRAP
600x600X900
A5 FCO FCO
DRAIN TRENCH DRAIN TRENCH
F 1500x200x200mm 1500x200x200mm F
07
5.7
7.
2
G G
PLOT LIMIT
63.95
PLOT LIMIT KITCHEN CONSULTANT:
LONDON DUBAI
BASEMENT 05 ST JAMES'S HOUSE
27-43 EASTERN ROAD
BUILDING 6, OFFICE SUITE 2-206
GOLD & DIAMOND PARK
SC: 1/ 150 ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
UK UAE
Tel - +44 (0)20 8591 5593 Tel - +971 (0)4 323 7525
PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R
REQUIRED FIRE TANK RESERVE = 750 GPM X 60 MIN = 45,000 GAL = 170 m3 Sector -
Building -
TOTAL REQUIRED CAPACITY = 520 + 170 = 690 m3
Designed AKAK
PROPOSED CAPACITY = 680 m3 ( 2 COMPARTMENTS - 340 m3 EACH ) Drawn SSU
PROPOSED 170 M3 : FOR FIRE TANK Checked AKAK
510 M3 : FOR DOMESTIC USE Approved JOS
Date JANUARY 2022
Scale AS SHOWN
Sheet Title
BASEMENT 05
HELP ASSISTANCE SYSTEM
LAYOUT
Sheet nbr.
Revisions
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
DEVELOPER:
OWNER:
PLOT LIMIT
PLOT LIMIT
A1 65.77
A IDF RACK
A
B4.04.04 B4.03.03 B4.03.03
42U
B4.02.02 B4.02.02
B4.02.02
10 B4.07.04 20
B4.03.03 B4.03.03 11 9 1 19
B4.04.04
B4.04.02
12 8 2 18
B4.02.02
13 7 3 17
A2 B4.04.04
B4.03.03 B4.03.03
14 6
Floor Mount Scale
4 16
15 5 5 15
B4.03.03 B4.03.03
B4.02.02 B4.04.02
16 4 6 14
B4.07.01
B4.04.04
B4.02.02 17 3 B4.07.05 7 13
B4.07.06
B4.03.03 B4.03.03 B1.XX.01 B1.XX.01
18 2 8 12
B4.02.02
B4.02.02 B4.04.04
B4.03.03 B4.03.03
19
20
1 9
10
11
OPERATOR:
B4.04.02
A3 B4.02.02
B4.02.02 B4.04.03
B4.03.03 B4.03.03
B4.02.02
7
17.21
ACCESSIBLE Bottom of slab
B4.02.02 FOR GUEST
B B4.02.02 B4.02.03
B4.03.03 B4.03.03 B
ARCHITECT:
B4.02.01 B4.03.01
B4.04.01
C C
B4.01.01
A4 B4.12.01
B4.06.01
D B4.12.02
B4.12.03 D
B4.12.02 B4.05.01 B4.06.01
B4.12.04 B4.05.05
B4.06.34 B4.06.22
0.80m clear below car lift pit
B4.01.08 B4.05.07
B4.06.27 B4.06.06
Bottom of slab
B4.01.09
B4.06.03 B4.08.07 B4.08.07
B4.06.24 B4.06.04
B4.06.07
E B4.01.02
B4.05.02
B4.05.06
B4.05.04
B4.08.01
E
B4.06.32
B4.06.11
CONSULTANT:
B4.05.03 B4.06.23 B4.06.32 B4.06.11
B4.06.24 B4.08.06
B4.08.10 B4.08.10 B4.08.10
B4.01.04 B4.01.04
B4.06.25
B4.09.01 B4.09.05
B4.06.31
A5
B4.09.02 B4.06.20
B4.13.01 B4.06.21 B4.06.21 B4.06.20 B4.06.02
B4.09.03
B4.09.04 B4.06.03
B4.08.10 B4.08.04
B4.08.10
B4.13.03 B4.06.05
B4.13.02
F B4.13.04
B4.01.07 B4.09.05 B4.09.05 B4.06.33
B4.06.29
B4.08.03
B4.08.10
F
B4.13.02 B4.08.05
B4.08.10 B4.08.11
CH
B4.10.01 B4.06.33
B4.01.07 B4.10.01
B4.08.05 B4.08.03
B4.08.03 B4.08.02
B4.06.08 B4.08.10
B4.08.10
B4.10.01 B4.06.14 B4.08.02
B4.06.16
B1.14.03
B4.08.12
B4.10.01 B4.06.12
PLOT LIMIT
B4.01.03
B4.06.12
LOCAL CONSULTANT:
B4.08.09
PLOT LIMIT
B4.08.09
B4.06.07
B4.01.04 B4.08.08
B1.14.03 B4.06.09
B4.06.15 B4.06.19 B4.06.10
B4.11.01 B4.11.01 B4.06.15
B4.01.05
B1.14.03 B4.11.01
07
B4.01.04
7.
5.7
B4.06.31
B4.01.03 B4.06.18
B4.01.07
B4.06.30
B4.01.06
B4.11.01
2
B4.11.01
B4.01.05
G G
PLOT LIMIT
63.95
PLOT LIMIT KITCHEN CONSULTANT:
LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
UK UAE
Tel - +44 (0)20 8591 5593 Tel - +971 (0)4 323 7525
PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R
Sheet Title
BASEMENT 04
HELP ASSISTANCE
SYSTEM LAYOUT
Sheet nbr.
CH
2 CHIME FOR HELP ASSISTANCE TOP OF DOOR/CEILING
N O R T H
3 CHIME RESET BUTTON 1300mm FFL
4107
REV BY APP DESCRIPTION DATE
Revisions
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
DEVELOPER:
1.5% SLOPE
A A
4.55 M CLEAR HEIGHT BELOW
TOILET BOT. OF SLAB
LINE OF SUNKEN
SLAB ABOVE
25
29 1 24
H
1 28 2 23
2 27 3 22
IDT
A2 3 26 4 21
4 25 5 20
W
5 24 6 19
17 23 10 18
18
19
20
21 12
13
16
OPERATOR:
EFR
14 15
AD
A3
ISH
18.6LOPE
CH
7
YA
17.21
Hydraulic CAR CAR
S
SHAFT AT H/L
B CARLIFT
B
0.6%
EXIT EXIT
4000kg - 0.50m/s
LAD
D.O.=260cm(w)x320cm(h)
C.I.D.= 260cm(w)x650cm(D)x3300(h)
ARCHITECT:
C C
A4 CH
D D
Hydraulic
CARLIFT CAR CAR
4000kg - 0.50m/s ENT. ENT.
E D.O.=260cm(w)x320cm(h)
C.I.D.= 260cm(w)x650cm(D)x3300(h) E
CONSULTANT:
A5
F F
VESTIBULE
PLOT LIMIT
LOCAL CONSULTANT:
4.30% SLOPE
PLOT LIMIT
07
7.
5.7
2
1.40% SLOPE
LONDON DUBAI
GROUND FLOOR ST JAMES'S HOUSE
27-43 EASTERN ROAD
BUILDING 6, OFFICE SUITE 2-206
GOLD & DIAMOND PARK
SC: 1/ 150 ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R
Sheet Title
GROUND FLOOR PLAN
HELP ASSISTANCE LAYOUT
Sheet nbr.
Revisions
DEVELOPER:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
OWNER:
OPERATOR:
A A
20
21 19
18 A
22 18
19 17
TH
23 17
20 16
A2 21 8 A
24 8
WID
25 7
22 7
23 6 26 6
27 5
24 5
29 3
26 3
27
28
2
1
30 2
1
slab line
for
ARCHITECT:
EFR
MRMU
room
below
AD
A3
ISH
NOT
YA
18.6
17.21
FD
ACCESSIBLE
FOR GUEST
B B
LAD
A4
D D
E E
LOCAL CONSULTANT:
A5
F F
PLOT LIMIT
PLOT LIMIT
KITCHEN CONSULTANT:
07
7.
5.7
2
G G LONDON
ST JAMES'S HOUSE
DUBAI
BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
63.95 PLOT LIMIT UK UAE
Tel - +44 (0)20 8591 5593 Tel - +971 (0)4 323 7525
PLOT LIMIT
PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R
Sheet Title
MEZZANINE FLOOR PLAN
HELP ASSISTANCE SYSTEM
LAYOUT
Sheet nbr.
Revisions
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
DEVELOPER:
A A
14 13
14 13
12
12
15 11
15 11
16 10
TH
16 10
17 9
17 9
A2 18 8
18 8
WID
19 7
19 7
20 6
20 6
21 5
21 5
23
24
3
2
23
24
3
2 OPERATOR:
25 1
25 1
EFR
26
26
AD
OTUNAC
A3
ISH
CANUTO
7
NOT
YA
18.6
17.21
ACCESSIBLE
FOR GUEST
B H/L B
LAD
H/L
H/L H/L
H/L
ARCHITECT:
C C
A4
D D
H/L H/L H/L H/L H/L
H/L
H/L
E E
CANUTO
OTUNAC
CANUTO
OTUNAC
OTUNAC
CONSULTANT:
A5
OTUNAC
CANUTO
CANUTO
CANUTO
F F
OTUNAC
CANUTO
CANUTO
CANUTO
CANUTO
CANUTO
OTUNAC
PLOT LIMIT
PLOT LIMIT LOCAL CONSULTANT:
07
5.7
OTUNAC
CANUTO
7.
2
AC
N
TU
O
CANUTO
CANUTO
CANUTO
CANUTO
CANUTO
CANUTO
CANUTO CANUTO CANUTO
CANUTO
CANUTO
CANUTO
CANUTO
CANUTO
CANUTO
CANUTO
CANUTO CANUTO
G G
AC
N
TU
O
OTUNAC
CANUTO
LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R
Sheet Title
1ST FLOOR PLAN
HELP ASSISTANCE SYSTEM
LAYOUT
Sheet nbr.
Revisions
11 22 33 44 55 66 77 88 99 10
10 11
11 12
12 13
13 14
14 15
15
DEVELOPER:
A HK.01.11
A
HK.01.14
HK.01.10
12 12
HK.01.13
13 HK.01.07 13 11
11
14
HK.01.15 14 10
H
10
HK.01.05
15 15 9
9
IDT
A2 16 6 HK.01.13 16
17
6
5
17 5 HK.01.06
18 18 4
W
4 HK.01.08
19 3 HK.01.09 19 3
21
22
1 HK.01.01
HK.01.04
21
22
1
OPERATOR:
23 23
HK.01.02
EFR
24 24
HK.01.03
AD
A3
ISH
openings @ 2nd,
4th, 6th,8th,10th
&12th floor only
7
YA
18.6
17.21
B B
LAD
HK.01.16
ARCHITECT:
C HELP ASSISTANCE SYSTEM C
CALL BUTTON LOCATED AT
A4 2ND,3RD,12TH AT ONLY
THIS APARTMENT
D D
E E
CONSULTANT:
A5
F F
PLOT LIMIT
PLOT LIMIT LOCAL CONSULTANT:
07
7.
5.7
2
G G
LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R
Sheet Title
TYPICAL 2ND & 3RD FLOOR PLAN
HELP ASSISTANCE SYSTEM LAYOUT
Sheet nbr.
Revisions
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
DEVELOPER:
A HK.01.11
A
HK.01.14
HK.01.10
10 10
HK.01.13
HK.01.07 11 9
11 9
HK.01.15 12 8
TH
12 8
HK.01.05
13 7
13 7
A2 14 6 HK.01.13 14 6
WID
15 5 15 5
HK.01.06
16 4
16 4 HK.01.08
HK.01.09 17 3
17 3
19
20
1 HK.01.01
HK.01.04
19
20
1
OPERATOR:
HK.01.02
EFR
HK.01.03
AD
A3
ISH
openings @ 2nd,
4th, 6th,8th,10th
&12th floor only
7
YA
18.6
17.21
B B
LAD
HK.01.16
ARCHITECT:
C HELP ASSISTANCE SYSTEM C
CALL BUTTON LOCATED AT
A4 2ND,3RD,12TH AT ONLY
THIS APARTMENT
D D
AC
N
CANUTO
TU
O
OTUNAC
CANUTO
E E
OTUNAC
OTUNAC
CANUTO
CANUTO
CONSULTANT:
CANUTO
CANUTO
CANUTO CANUTO
A5
F F
PLOT LIMIT
PLOT LIMIT LOCAL CONSULTANT:
07
5.7
7.
2
OTUNAC
CANUTO
OTUNAC
CANUTO
CANUTO
OTUNAC
CANUTO CANUTO
G G
LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R
Sheet Title
12TH FLOOR PLAN
HELP ASSISTANCE SYSTEM
LAYOUT
Sheet nbr.
ROOF FLOOR
12TH FLOOR
DEVELOPER:
11TH FLOOR
10TH FLOOR
9TH FLOOR
OWNER:
8TH FLOOR
7TH FLOOR
6TH FLOOR
OPERATOR:
5TH FLOOR
4TH FLOOR
ARCHITECT:
3RD FLOOR
REGULAR HELP REQUEST EMERGENCY HELP REQUEST
CONSULTANT:
2ND FLOOR
LOCAL CONSULTANT:
1ST FLOOR
CH CH
LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
CH CH 27-43 EASTERN ROAD
ROMFORD, ESSEX
GOLD & DIAMOND PARK
SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
UK UAE
Tel - +44 (0)20 8591 5593 Tel - +971 (0)4 323 7525
PROJECT:
GROUND FLOOR
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R
BASE-1 FLOOR
PLOT NO.: BLOCK:
4059 MADINA
BASE-2 FLOOR
CH CH Sheet Information
Project Nbr. 550
BASE-3 FLOOR
Project Phase CONSTRUCTION
Discipline ELECTRICAL
Sector -
HASCP CH Building -
Designed AKAK
Drawn SSU
BASE-4 FLOOR
Checked AKAK
Approved JOS
Date JANUARY 2022
Scale AS SHOWN
Sheet Title
BASE-5 FLOOR
HELP ASSISTANCE SYSTEM
HELP ASSISTANCE SYSTEM RISER DIAGRAM LOGIC DIAGRAM SCHEMATIC DIAGRAM
Sheet nbr.