You are on page 1of 8

HELP ASSISTANCE SYSTEM LEGEND

NO. SYMBOL DESCRIPTION HEIGHT


1 25mm PVC CONDUIT FOR HAS SLAB
N O R T H
CH
2 CHIME FOR HELP ASSISTANCE TOP OF DOOR/CEILING

3 CHIME RESET BUTTON 1300mm FFL

4 HELP ASSISTANCE CALL BUTTON

5 13A UNSWITCHED POWER SOCKET ABOVE FALSE CEILING


FOR SF (Power From Essential DB)

6 HELP ASSISTANCE SYSTEM CONTROL PANEL 1300mm FFL

REV BY APP DESCRIPTION DATE

Revisions

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DEVELOPER:

OWNER:
PLOT LIMIT
PLOT LIMIT
A1 65.77

A IDF RACK
A
SHAFT
42U AT H/L
SHAFT AT HIGH LEVEL SHAFT AT H/L

D
10

D
20
11 9 1 19

D
12 8 2 18

D
13 7 3 17
A2 14 6 4 16
15 5 5 15
16 4 6 14
17 3 7 13
18 2 8 12
19
20
1
RAISED FLOOR
9
10
11
OPERATOR:

A3
7

NOT
18.6

17.21
ACCESSIBLE
OPENING AT H/L FOR GUEST
B B
ARCHITECT:
C C

A4
TANK PIT (TYP)
D 400x400x200mm DRAIN TRENCH D
(SECTION DETAIL-A) 3000x200x350mm 800X800 ACCESS
SUMP PIT LINE
3000x2000x1800mm
(SECTION DETAILS-B)
E OPENING AT H/L WITH ACCESS 600x600 E
CONSULTANT:
GULLY TRAP
600x600X900
A5 FCO FCO
DRAIN TRENCH DRAIN TRENCH
F 1500x200x200mm 1500x200x200mm F

TANK PIT (TYP)


TANK PIT (TYP)
PLOT LIMIT
LOCAL CONSULTANT:
400x400x200mm
PLOT LIMIT 400x400x200mm
(SECTION DETAIL-A)
(SECTION DETAIL-A)

07
5.7

7.
2

G G

PLOT LIMIT
63.95
PLOT LIMIT KITCHEN CONSULTANT:

LONDON DUBAI
BASEMENT 05 ST JAMES'S HOUSE
27-43 EASTERN ROAD
BUILDING 6, OFFICE SUITE 2-206
GOLD & DIAMOND PARK
SC: 1/ 150 ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
UK UAE
Tel - +44 (0)20 8591 5593 Tel - +971 (0)4 323 7525

PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R

PLOT NO.: BLOCK:


4059 MADINA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Sheet Information
Project Nbr. 550
BASEMENT RCC DOMESTIC AND FIRE WATER RESERVE
Project Phase CONSTRUCTION
DOMESTIC RESERVE = DAILY DEMAND X 2 DAYS = 260 m3 X 2 = 520 m3 Discipline ELECTRICAL

REQUIRED FIRE TANK RESERVE = 750 GPM X 60 MIN = 45,000 GAL = 170 m3 Sector -
Building -
TOTAL REQUIRED CAPACITY = 520 + 170 = 690 m3
Designed AKAK
PROPOSED CAPACITY = 680 m3 ( 2 COMPARTMENTS - 340 m3 EACH ) Drawn SSU
PROPOSED 170 M3 : FOR FIRE TANK Checked AKAK
510 M3 : FOR DOMESTIC USE Approved JOS
Date JANUARY 2022
Scale AS SHOWN

Sheet Title
BASEMENT 05
HELP ASSISTANCE SYSTEM
LAYOUT

Sheet nbr.

GOOD FOR CONSTRUCTION


C HAS -101 00
HELP ASSISTANCE SYSTEM LEGEND
NO. SYMBOL DESCRIPTION HEIGHT
1 25mm PVC CONDUIT FOR HAS SLAB
N O R T H
CH
2 CHIME FOR HELP ASSISTANCE TOP OF DOOR/CEILING

3 CHIME RESET BUTTON 1300mm FFL

4 HELP ASSISTANCE CALL BUTTON

5 13A UNSWITCHED POWER SOCKET ABOVE FALSE CEILING


FOR SF (Power From Essential DB)

6 HELP ASSISTANCE SYSTEM CONTROL PANEL 1300mm FFL

REV BY APP DESCRIPTION DATE

Revisions

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DEVELOPER:

OWNER:
PLOT LIMIT
PLOT LIMIT
A1 65.77

A IDF RACK
A
B4.04.04 B4.03.03 B4.03.03
42U
B4.02.02 B4.02.02

B4.03.03 B4.03.03 B4.07.03


B4.04.04

B4.02.02
10 B4.07.04 20
B4.03.03 B4.03.03 11 9 1 19
B4.04.04
B4.04.02
12 8 2 18
B4.02.02
13 7 3 17
A2 B4.04.04
B4.03.03 B4.03.03

14 6
Floor Mount Scale
4 16
15 5 5 15
B4.03.03 B4.03.03
B4.02.02 B4.04.02
16 4 6 14
B4.07.01
B4.04.04
B4.02.02 17 3 B4.07.05 7 13
B4.07.06
B4.03.03 B4.03.03 B1.XX.01 B1.XX.01
18 2 8 12
B4.02.02
B4.02.02 B4.04.04
B4.03.03 B4.03.03
19
20
1 9
10
11
OPERATOR:
B4.04.02

B4.07.07 B4.07.07 B4.07.07 B4.07.07


B4.04.04
B4.03.03 B4.03.03
B4.02.02 B4.07.01
B4.04.02 B1.XX.01

B4.03.03 B4.03.03 B4.07.07 B4.07.07 B4.07.07 B4.07.07


B4.04.03
B4.02.02
B4.04.03
B4.07.08 B4.07.02
B4.03.03 B4.03.03

A3 B4.02.02
B4.02.02 B4.04.03

B4.03.03 B4.03.03

B4.02.02
7

NOT 0.80m clear below car lift pit


18.6

B4.02.02 B4.03.03 B4.03.03

17.21
ACCESSIBLE Bottom of slab
B4.02.02 FOR GUEST
B B4.02.02 B4.02.03
B4.03.03 B4.03.03 B
ARCHITECT:
B4.02.01 B4.03.01
B4.04.01

opening for cleaning


B4.03.02

C C
B4.01.01

A4 B4.12.01

B4.06.01

D B4.12.02
B4.12.03 D
B4.12.02 B4.05.01 B4.06.01
B4.12.04 B4.05.05
B4.06.34 B4.06.22
0.80m clear below car lift pit
B4.01.08 B4.05.07
B4.06.27 B4.06.06
Bottom of slab
B4.01.09
B4.06.03 B4.08.07 B4.08.07
B4.06.24 B4.06.04
B4.06.07

E B4.01.02
B4.05.02
B4.05.06
B4.05.04

B4.08.01
E
B4.06.32
B4.06.11

CONSULTANT:
B4.05.03 B4.06.23 B4.06.32 B4.06.11

B4.06.24 B4.08.06
B4.08.10 B4.08.10 B4.08.10
B4.01.04 B4.01.04
B4.06.25
B4.09.01 B4.09.05
B4.06.31

A5
B4.09.02 B4.06.20
B4.13.01 B4.06.21 B4.06.21 B4.06.20 B4.06.02
B4.09.03
B4.09.04 B4.06.03
B4.08.10 B4.08.04
B4.08.10
B4.13.03 B4.06.05
B4.13.02

F B4.13.04
B4.01.07 B4.09.05 B4.09.05 B4.06.33
B4.06.29
B4.08.03
B4.08.10
F
B4.13.02 B4.08.05
B4.08.10 B4.08.11
CH
B4.10.01 B4.06.33
B4.01.07 B4.10.01
B4.08.05 B4.08.03
B4.08.03 B4.08.02
B4.06.08 B4.08.10
B4.08.10
B4.10.01 B4.06.14 B4.08.02
B4.06.16
B1.14.03
B4.08.12

B4.10.01 B4.06.12

B4.10.01 B4.06.26 B4.06.26


B4.06.13 B4.06.13

PLOT LIMIT
B4.01.03
B4.06.12

LOCAL CONSULTANT:
B4.08.09

PLOT LIMIT
B4.08.09
B4.06.07

B4.01.04 B4.08.08
B1.14.03 B4.06.09
B4.06.15 B4.06.19 B4.06.10
B4.11.01 B4.11.01 B4.06.15

B4.01.05

B1.14.03 B4.11.01

07
B4.01.04

7.
5.7

B4.06.31
B4.01.03 B4.06.18
B4.01.07
B4.06.30
B4.01.06
B4.11.01
2

B4.11.01
B4.01.05

G G

PLOT LIMIT
63.95
PLOT LIMIT KITCHEN CONSULTANT:

LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
UK UAE
Tel - +44 (0)20 8591 5593 Tel - +971 (0)4 323 7525

PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R

PLOT NO.: BLOCK:


4059 MADINA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Sheet Information
Project Nbr. 550
Project Phase CONSTRUCTION
Discipline ELECTRICAL
Sector -
Building -
Designed AKAK
Drawn SSU
Checked AKAK
Approved JOS
Date JANUARY 2022
Scale AS SHOWN

Sheet Title
BASEMENT 04
HELP ASSISTANCE
SYSTEM LAYOUT

Sheet nbr.

GOOD FOR CONSTRUCTION


C HAS -102 00
HELP ASSISTANCE SYSTEM LEGEND
NO. SYMBOL DESCRIPTION HEIGHT
1 25mm PVC CONDUIT FOR HAS SLAB

CH
2 CHIME FOR HELP ASSISTANCE TOP OF DOOR/CEILING
N O R T H
3 CHIME RESET BUTTON 1300mm FFL

4 HELP ASSISTANCE CALL BUTTON

5 13A UNSWITCHED POWER SOCKET ABOVE FALSE CEILING


FOR SF (Power From Essential DB)

6 HELP ASSISTANCE SYSTEM CONTROL PANEL 1300mm FFL

4107
REV BY APP DESCRIPTION DATE

Revisions

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DEVELOPER:

1.5% SLOPE

WALKWAY WIDTH 8.00 M


OWNER:
PLOT LIMIT
PLOT LIMIT
A1 65.77

A A
4.55 M CLEAR HEIGHT BELOW
TOILET BOT. OF SLAB
LINE OF SUNKEN
SLAB ABOVE
25
29 1 24
H

1 28 2 23
2 27 3 22
IDT

A2 3 26 4 21
4 25 5 20
W

5 24 6 19
17 23 10 18

GAFAR BIN ABE TALIB STREET WIDTH 20.00 M


22 11 17
ANT

18
19
20
21 12
13
16
OPERATOR:
EFR

14 15
AD

A3
ISH

18.6LOPE

CH
7
YA

17.21
Hydraulic CAR CAR
S

SHAFT AT H/L
B CARLIFT
B
0.6%

EXIT EXIT
4000kg - 0.50m/s
LAD

D.O.=260cm(w)x320cm(h)
C.I.D.= 260cm(w)x650cm(D)x3300(h)
ARCHITECT:
C C

A4 CH

D D
Hydraulic
CARLIFT CAR CAR
4000kg - 0.50m/s ENT. ENT.
E D.O.=260cm(w)x320cm(h)
C.I.D.= 260cm(w)x650cm(D)x3300(h) E
CONSULTANT:
A5
F F
VESTIBULE

RAMP ( 10% slope)

PLOT LIMIT
LOCAL CONSULTANT:
4.30% SLOPE
PLOT LIMIT

07
7.
5.7
2

A help request button is


G recommended at the
Erga Reply :
G
bellman stand to request
help from the concierge contractor to provide
desk. 63.95 help request as indiacted PLOT LIMIT
PLOT LIMIT KITCHEN CONSULTANT:

1.40% SLOPE
LONDON DUBAI
GROUND FLOOR ST JAMES'S HOUSE
27-43 EASTERN ROAD
BUILDING 6, OFFICE SUITE 2-206
GOLD & DIAMOND PARK
SC: 1/ 150 ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410

GABER BIN ABD ALLAH STREET WIDTH 20.00 M UK


Tel - +44 (0)20 8591 5593
UAE
Tel - +971 (0)4 323 7525

PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R

PLOT NO.: BLOCK:


4059 MADINA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Sheet Information
Project Nbr. 550
Project Phase CONSTRUCTION
Discipline ELECTRICAL
Sector -
Building -
Designed AKAK
Drawn SSU
Checked AKAK
Approved JOS
Date JANUARY 2022
Scale AS SHOWN

Sheet Title
GROUND FLOOR PLAN
HELP ASSISTANCE LAYOUT

Sheet nbr.

GOOD FOR CONSTRUCTION


C HAS -106 00
HELP ASSISTANCE SYSTEM LEGEND
NO. SYMBOL DESCRIPTION HEIGHT
1 25mm PVC CONDUIT FOR HAS SLAB
N O R T H
CH
2 CHIME FOR HELP ASSISTANCE TOP OF DOOR/CEILING

3 CHIME RESET BUTTON 1300mm FFL

4 HELP ASSISTANCE CALL BUTTON

5 13A UNSWITCHED POWER SOCKET ABOVE FALSE CEILING


FOR SF (Power From Essential DB)

6 HELP ASSISTANCE SYSTEM CONTROL PANEL 1300mm FFL

REV BY APP DESCRIPTION DATE

Revisions

DEVELOPER:

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

OWNER:

WALKWAY WIDTH 8.00 M


PLOT LIMIT
PLOT LIMIT
A1 65.77

OPERATOR:
A A

20
21 19
18 A
22 18
19 17
TH

23 17
20 16
A2 21 8 A
24 8
WID

25 7
22 7
23 6 26 6
27 5
24 5

GAFAR BIN ABE TALIB STREET WIDTH 20.00 M


28 4
25 4
sunken
ANT

29 3
26 3
27
28
2
1
30 2
1
slab line
for
ARCHITECT:
EFR

MRMU
room
below
AD

A3
ISH

NOT
YA

18.6

17.21
FD

ACCESSIBLE
FOR GUEST
B B
LAD

SHAFT AT H/L SHAFT AT H/L


CONSULTANT:
C C

A4
D D

E E

LOCAL CONSULTANT:
A5
F F

PLOT LIMIT
PLOT LIMIT
KITCHEN CONSULTANT:
07
7.
5.7
2

G G LONDON
ST JAMES'S HOUSE
DUBAI
BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
63.95 PLOT LIMIT UK UAE
Tel - +44 (0)20 8591 5593 Tel - +971 (0)4 323 7525
PLOT LIMIT
PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R

PLOT NO.: BLOCK:

GABER BIN ABD ALLAH STREET WIDTH 20.00 M


4059 MADINA
Sheet Information
Project Nbr. 550
Project Phase CONSTRUCTION
Discipline ELECTRICAL
Sector -
Building -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Designed AKAK
Drawn SSU
Checked AKAK
Approved JOS
Date JANUARY 2022
Scale AS SHOWN

Sheet Title
MEZZANINE FLOOR PLAN
HELP ASSISTANCE SYSTEM
LAYOUT

Sheet nbr.

GOOD FOR CONSTRUCTION


C HAS -107 00
HELP ASSISTANCE SYSTEM LEGEND
NO. SYMBOL DESCRIPTION HEIGHT
1 25mm PVC CONDUIT FOR HAS SLAB
N O R T H
CH
2 CHIME FOR HELP ASSISTANCE TOP OF DOOR/CEILING

3 CHIME RESET BUTTON 1300mm FFL

4 HELP ASSISTANCE CALL BUTTON

5 13A UNSWITCHED POWER SOCKET ABOVE FALSE CEILING


FOR SF (Power From Essential DB)

6 HELP ASSISTANCE SYSTEM CONTROL PANEL 1300mm FFL

REV BY APP DESCRIPTION DATE

Revisions

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DEVELOPER:

WALKWAY WIDTH 8.00 M


OWNER:
PLOT LIMIT
PLOT LIMIT
A1 65.77

A A
14 13
14 13

12
12
15 11
15 11
16 10
TH

16 10
17 9
17 9
A2 18 8
18 8
WID

19 7
19 7
20 6
20 6
21 5
21 5

GAFAR BIN ABE TALIB STREET WIDTH 20.00 M


22 4
22 4
ANT

23
24
3
2
23
24
3
2 OPERATOR:
25 1
25 1
EFR

26
26
AD

OTUNAC
A3
ISH

CANUTO
7

NOT
YA

18.6

17.21
ACCESSIBLE
FOR GUEST
B H/L B
LAD

H/L
H/L H/L
H/L
ARCHITECT:
C C

A4
D D
H/L H/L H/L H/L H/L
H/L
H/L

E E

CANUTO

OTUNAC

CANUTO

OTUNAC
OTUNAC
CONSULTANT:
A5

OTUNAC
CANUTO

CANUTO
CANUTO
F F

OTUNAC
CANUTO

CANUTO

CANUTO
CANUTO

CANUTO
OTUNAC
PLOT LIMIT
PLOT LIMIT LOCAL CONSULTANT:

07
5.7

OTUNAC
CANUTO

7.
2

AC
N
TU
O
CANUTO

CANUTO

CANUTO
CANUTO
CANUTO

CANUTO
CANUTO CANUTO CANUTO

CANUTO

CANUTO

CANUTO
CANUTO
CANUTO

CANUTO

CANUTO
CANUTO CANUTO

G G

AC
N
TU
O

OTUNAC
CANUTO

63.95 PLOT LIMIT


PLOT LIMIT KITCHEN CONSULTANT:

LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410

GABER BIN ABD ALLAH STREET WIDTH 20.00 M UK


Tel - +44 (0)20 8591 5593
UAE
Tel - +971 (0)4 323 7525

PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R

PLOT NO.: BLOCK:


4059 MADINA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Sheet Information
Project Nbr. 550
Project Phase CONSTRUCTION
Discipline ELECTRICAL
Sector -
Building -
Designed AKAK
Drawn SSU
Checked AKAK
Approved JOS
Date JANUARY 2022
Scale AS SHOWN

Sheet Title
1ST FLOOR PLAN
HELP ASSISTANCE SYSTEM
LAYOUT

Sheet nbr.

GOOD FOR CONSTRUCTION


C HAS -108 01
HELP ASSISTANCE SYSTEM LEGEND
NO. SYMBOL DESCRIPTION HEIGHT
1 25mm PVC CONDUIT FOR HAS SLAB
N O R T H
CH
2 CHIME FOR HELP ASSISTANCE TOP OF DOOR/CEILING

3 CHIME RESET BUTTON 1300mm FFL

4 HELP ASSISTANCE CALL BUTTON

5 13A UNSWITCHED POWER SOCKET ABOVE FALSE CEILING


FOR SF (Power From Essential DB)

6 HELP ASSISTANCE SYSTEM CONTROL PANEL 1300mm FFL

REV BY APP DESCRIPTION DATE

Revisions

11 22 33 44 55 66 77 88 99 10
10 11
11 12
12 13
13 14
14 15
15

DEVELOPER:

WALKWAY WIDTH 8.00 M


OWNER:
PLOT LIMIT
PLOT LIMIT
A1 65.77

A HK.01.11
A
HK.01.14
HK.01.10

12 12
HK.01.13
13 HK.01.07 13 11
11
14
HK.01.15 14 10
H

10
HK.01.05
15 15 9
9
IDT

A2 16 6 HK.01.13 16
17
6
5
17 5 HK.01.06

18 18 4
W

4 HK.01.08
19 3 HK.01.09 19 3

GAFAR BIN ABE TALIB STREET WIDTH 20.00 M


20 2
HK.01.12 20 2
ANT

21
22
1 HK.01.01
HK.01.04
21
22
1
OPERATOR:
23 23
HK.01.02
EFR

24 24

HK.01.03
AD

A3
ISH

openings @ 2nd,
4th, 6th,8th,10th
&12th floor only
7
YA

18.6

17.21
B B
LAD

HK.01.16
ARCHITECT:
C HELP ASSISTANCE SYSTEM C
CALL BUTTON LOCATED AT
A4 2ND,3RD,12TH AT ONLY
THIS APARTMENT
D D

E E
CONSULTANT:
A5
F F

PLOT LIMIT
PLOT LIMIT LOCAL CONSULTANT:
07
7.
5.7
2

G G

63.95 PLOT LIMIT


PLOT LIMIT KITCHEN CONSULTANT:

LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410

GABER BIN ABD ALLAH STREET WIDTH 20.00 M UK


Tel - +44 (0)20 8591 5593
UAE
Tel - +971 (0)4 323 7525

PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R

PLOT NO.: BLOCK:


4059 MADINA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Sheet Information
Project Nbr. 550
Project Phase CONSTRUCTION
Discipline ELECTRICAL
Sector -
Building -
Designed AKAK
Drawn SSU
Checked AKAK
Approved JOS
Date JANUARY 2022
Scale AS SHOWN

Sheet Title
TYPICAL 2ND & 3RD FLOOR PLAN
HELP ASSISTANCE SYSTEM LAYOUT

Sheet nbr.

GOOD FOR CONSTRUCTION


C HAS -109 01
HELP ASSISTANCE SYSTEM LEGEND
NO. SYMBOL DESCRIPTION HEIGHT
1 25mm PVC CONDUIT FOR HAS SLAB
N O R T H
CH
2 CHIME FOR HELP ASSISTANCE TOP OF DOOR/CEILING

3 CHIME RESET BUTTON 1300mm FFL

4 HELP ASSISTANCE CALL BUTTON

5 13A UNSWITCHED POWER SOCKET ABOVE FALSE CEILING


FOR SF (Power From Essential DB)

6 HELP ASSISTANCE SYSTEM CONTROL PANEL 1300mm FFL

REV BY APP DESCRIPTION DATE

Revisions

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DEVELOPER:

WALKWAY WIDTH 8.00 M


OWNER:
PLOT LIMIT
PLOT LIMIT
A1 65.77

A HK.01.11
A
HK.01.14
HK.01.10

10 10
HK.01.13
HK.01.07 11 9
11 9
HK.01.15 12 8
TH

12 8
HK.01.05
13 7
13 7
A2 14 6 HK.01.13 14 6
WID

15 5 15 5
HK.01.06
16 4
16 4 HK.01.08
HK.01.09 17 3
17 3

GAFAR BIN ABE TALIB STREET WIDTH 20.00 M


HK.01.12 18 2
18 2
ANT

19
20
1 HK.01.01
HK.01.04
19
20
1
OPERATOR:
HK.01.02
EFR

HK.01.03
AD

A3
ISH

openings @ 2nd,
4th, 6th,8th,10th
&12th floor only
7
YA

18.6

17.21
B B
LAD

HK.01.16
ARCHITECT:
C HELP ASSISTANCE SYSTEM C
CALL BUTTON LOCATED AT
A4 2ND,3RD,12TH AT ONLY
THIS APARTMENT
D D

AC
N

CANUTO
TU
O

OTUNAC

CANUTO
E E
OTUNAC

OTUNAC

CANUTO

CANUTO
CONSULTANT:

CANUTO

CANUTO
CANUTO CANUTO

A5
F F

PLOT LIMIT
PLOT LIMIT LOCAL CONSULTANT:

07
5.7

7.
2

OTUNAC

CANUTO

OTUNAC

CANUTO

CANUTO

OTUNAC
CANUTO CANUTO

G G

63.95 PLOT LIMIT


PLOT LIMIT KITCHEN CONSULTANT:

LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
27-43 EASTERN ROAD GOLD & DIAMOND PARK
ROMFORD, ESSEX SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410

GABER BIN ABD ALLAH STREET WIDTH 20.00 M UK


Tel - +44 (0)20 8591 5593
UAE
Tel - +971 (0)4 323 7525

PROJECT:
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R

PLOT NO.: BLOCK:


4059 MADINA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Sheet Information
Project Nbr. 550
Project Phase CONSTRUCTION
Discipline ELECTRICAL
Sector -
Building -
Designed AKAK
Drawn SSU
Checked AKAK
Approved JOS
Date JANUARY 2022
Scale AS SHOWN

Sheet Title
12TH FLOOR PLAN
HELP ASSISTANCE SYSTEM
LAYOUT

Sheet nbr.

GOOD FOR CONSTRUCTION


C HAS -111 01
HELP ASSISTANCE SYSTEM LEGEND
NO. SYMBOL DESCRIPTION HEIGHT
1 25mm PVC CONDUIT FOR HAS SLAB
N O R T H
CH
2 CHIME FOR HELP ASSISTANCE TOP OF DOOR/CEILING

3 CHIME RESET BUTTON 1300mm FFL

4 HELP ASSISTANCE CALL BUTTON

5 13A UNSWITCHED POWER SOCKET ABOVE FALSE CEILING


FOR SF (Power From Essential DB)

6 HASCP HELP ASSISTANCE SYSTEM CONTROL PANEL 1300mm FFL

ROOF FLOOR

REV BY APP DESCRIPTION DATE


13TH FLOOR
Revisions

12TH FLOOR

DEVELOPER:
11TH FLOOR

10TH FLOOR

9TH FLOOR
OWNER:

8TH FLOOR

7TH FLOOR

6TH FLOOR

OPERATOR:
5TH FLOOR

4TH FLOOR

ARCHITECT:

3RD FLOOR
REGULAR HELP REQUEST EMERGENCY HELP REQUEST

CONSULTANT:
2ND FLOOR

LOCAL CONSULTANT:
1ST FLOOR
CH CH

MEZZ. FLOOR KITCHEN CONSULTANT:

LONDON DUBAI
ST JAMES'S HOUSE BUILDING 6, OFFICE SUITE 2-206
CH CH 27-43 EASTERN ROAD
ROMFORD, ESSEX
GOLD & DIAMOND PARK
SHEIKH ZAYED ROAD
RM1 3NH PO BOX 120410
UK UAE
Tel - +44 (0)20 8591 5593 Tel - +971 (0)4 323 7525

PROJECT:
GROUND FLOOR
FIVE STARS HOTEL IN MADINA
5B + G + M + 13 + R
BASE-1 FLOOR
PLOT NO.: BLOCK:
4059 MADINA
BASE-2 FLOOR
CH CH Sheet Information
Project Nbr. 550
BASE-3 FLOOR
Project Phase CONSTRUCTION
Discipline ELECTRICAL
Sector -
HASCP CH Building -
Designed AKAK
Drawn SSU
BASE-4 FLOOR
Checked AKAK
Approved JOS
Date JANUARY 2022
Scale AS SHOWN

Sheet Title
BASE-5 FLOOR
HELP ASSISTANCE SYSTEM
HELP ASSISTANCE SYSTEM RISER DIAGRAM LOGIC DIAGRAM SCHEMATIC DIAGRAM

Sheet nbr.

GOOD FOR CONSTRUCTION


C HAS -201 01

You might also like