An activity or gang process chart is useful in plotting each individual’s activities on a time scale similar to that of a worker – machine chart. An activity chart is less restrictive and may be used to follow the interaction of any group of operators, with or without equipment being involved. ACTIVITY CHART OF EMERGENCY TRACHEOTOMY WORK MEASUREMENT
The primary purpose is to set time standards for a job.
Why? To schedule work and allocate capacity To provide an objective basis for motivating the workforce and measuring worker’s performance. To bid for new contracts and to evaluate performance on existing ones. To provide benchmarks for improvement. WORK MEASUREMENT TECHNIQUES
Direct observational methods
Time Study It is generally made with a stopwatch, either on the spot or by analyzing a video footage of the job. The job to be studied is broken down into measurable parts or elements, and each element is studied individually. WORK MEASUREMENT TECHNIQUES
Some general rules for breaking down a job:
Define each work element to be short in duration but long enough so that it can be timed with a stopwatch and the time can be written down. If the operator works with equipment that runs separately, then separate the actions of the operator and of the equipment into different elements. Define any delays by the operator or equipment into separate elements. WORK MEASUREMENT TECHNIQUES
Normal Time = Observed performance time per unit X
Performance rating Q – what will be the NT if an operator performs a task in 2 minutes and the time-study analyst estimates her to be performing about 20% faster than normal? Number of units to be manufactured