Calculating Fault Current From Power Generation From Power Distribution T/C
Fault Level at Incoming Site 360 MVA
Base MVA (For H.T beaker and Transformer Primary side) 4 MVA Base KV (For H.T beaker and Transformer Primary side) 33 KV Base KV (For Transformer Secondary,LT Panel,D.B) 0.415 KV
Fault Level at HT Sub Station Side
P.U Reactance at Incoming of H.T Breaker [Z p.u(A) ] 0.011 Ω
Fault Level at Transformer Side Transformer Rating 4 MVA Transformer Impedance 6.25 % Length of Cable from H.T Breaker To Transformer 50 Meter Outdoor 33KV Cable 3cx400Sq.mm R (T/C) 0.014 PU X (T/C) 0.014 PU Z(T/C) 0.020 PU Z p.u (C) 0.000 Ω Total Z p.u (D) (Up to Transformer Primary) 0.031 Ω Fault Level at Transformer Primary Side 129.41 MVA % Reactance at Base KVA 6.250 % Z P.U (T/C) 0.063 Ω Total P.U Impedance up to T/C Secondary 0.093 Ω Total%Z=9.3 Fault Level at Transformer Secondary Side 42.82 MVA Fault Current at Transformer Secondary 59.58 Kamp Fault Level at LT Sub Station Side