Professional Documents
Culture Documents
14. All roads, storm water drainage and foul sewerage to Civil
Engineer's drawings
300
300
300
NAKAWA DIVISION, KAMPALA
395
395
90
90
90
90
D3N9 CONSTRCTION LIMITED
300
CLIENT C/o ADU ENOCH, +256 778 807 093 THIRD FLOOR, BLOCK B,
NAKAWA BUSINESS PARK
300
PROJECT Plot 67/A, Spring Road, Bugolobi P. O Box 6889, Kampala
MANAGER Tel: +256 775 915 115 Email: canowira@gmail.com
60
MWEMAT LIMITED
300
STRUCTURAL Development and Engineering Consultants
ENGINEER
2,100
2,100
P. o Box 70864, Kampala,
Tel: +256 772 387 590 Email: info@mwemat.com
60
2,410
INSOL LIMITED
300
QUANTITY
SURVEYORS P. o Box 26055, Kampala,
Tel: +256 777 429 989
60
4,000
M&E
ENGINEERS
300
60
CONTRACTOR
60
60
C/o ADU ENOCH, +256 778 807 093 THIRD FLOOR, BLOCK B,
NAKAWA BUSINESS PARK
60
LETS STOP
250
250
250
1,200
1,200
1,200
60° PROJECT:
CLIENT:
SIGNBOARD BACK ELEVATION SIGNBOARD SIDE ELEVATION
SIGNBOARD FRONT ELEVATION MS D3N9 CONSTRUCTION LIMITED
Scale 1:20 Scale 1:20 C/o ADU ENOCH, +256 778 807 093
Scale 1:20 THIRD FLOOR, BLOCK B, NAKAWA BUSINESS PARK
Drawing Title:
Drawing Number:
Drawn: Checked:
Bosco Asiimire Canowira Daniel
Date: Scale:
January 2020 As Stated
PROJECT ARCHITECT:
Job Number:
GSPublisherVersion 0.2.100.100