SORPranod CENTRAL RAILWAY HEADQUARTERS OFFICE, ENGINEERING BRANCH, MUMBAI C.S.T. No. W.187.R.USSOR/BCI Date : 29.06.2022 sr.DEN(Co)BB,BSLNSP/SUR,PA Sub:- Adoption of CPWD Delhi Standard Schedule of Rate (DSR-Vol-I, DSR,Vol.II and Landscaping) , DSR-2018 (AOR-Vol.I & II) & CPWD-Specifications(Vol.1 & TI) and IRUSSOR-2019 & IRUSS. Ref:- (i) Railway Board’s letter No. 2018/CE-1/USSOR/1/W&M, dated- 06.12.2019 (ii) This office letter No. W.187.R.USSOR/BCI, dated- 19.10.2021. (Copy enclosed for ready reference) Railway Board vide letter under ref(i), has instructed to finalize Building Cost Index from time to time and adopt CPWD DSR 2018 & CPWD Specification for execution of all civil engineering works . ‘Accordingly vide this office letter under ref(ii), it has been decided that the Cost Index for entire Central Railway shall be 111 and the detailed instructions for using CPWD DSR 2018 with effect from 01.11.2021 for all works related to Building works, Road works, Horticulture works and other miscellaneous works have been issued. It is once again reiterated that the Instructions for adoption of CPWD DSR 2018 issued vide letter under ref(ii) may be followed strictly. IF divisions are finding any difficulties for using of CPWD DSR 2018, the same should be reported to this office. og ais = ‘2 ae ian * (S.H.Malbhage) Dy.Chief Engineer(W) DA: As above Scanned with CamScanner 120 ash File No.CR-HQ0ENGG(UsoR)/3/2021-0/o DY.CE(W)/HQ/CR CENTRAL RAILWAY Engineer's Principal Chief Office, CST Mumbai — 400 001 NoW.187.R.USSOR/BCI Date:19.10.2021 CAO(C), PFA DRM / BB, BSL, NGP, PA, SUR CWM Manmad mY Sub: Adoption of CPWD Delhi Schedules of Rates (DSR-Volume-I,DSR-Volume II, & landscaping), DSR-2018(AOR-Volume-I, Volume-II) & CPWD- Specifications, (Volume-I, Volume-II) and IRUSSOR-2019 & IRUSS — 2019 on Indian Railways. Ref: Railway Board's Letter No. 2018 CE-1/USSOR/1/W&M dated 06.12.2019 eee Vide letter under reference Railway Board has instructed to adoption-of 1 (2) CPWD Delhi Schedules of Rates DSR 2018 DSR-Vol.1, DSR-Vol:2:DSR'Horticulture & Landscaping) Analysis of Rates (AOR-Vol.1 & AOR — Vol.2) & CPWD. Specification (Vol. 1& Vol. 2) for execution of all Civil Engineering Works Related to Building Work, Road Works and horticulture Works etc. (except Formation works, Bridge Works and P-Way works) on Indian Railways. (b) Indian Railways Unified Standard Schedule of Rates (IRUSSOR -2019) for Bridge * works, Formation works and P.Way works with Indian Railways Unified’Standard Specification (IRUSS- 2019) for Earth work in cutting and Embankment, Bridge works and P. Way Works. 2. The proposal for adoption of CPWD DSR-2018 has been concurred by associate HQ finance and it has been approved by PCE. 3. Chapter no. 6,7,8,9,10,13,14,15,16 17,18,20 & 21 related to P. Way works of Central Railway USSOR has been prepared based on IRUSSOR software programme issued by Railway Board and came into force Vide this office letter no. W.187:R.A.Poliucy. /IV dated 20.04.2020 and also uploaded on IREPS portal by HQ. Preparation of Central Railway USSOR for Bridge works and Formations in under process. 4. In case any Estimate and Tender involves both building work, Road work and horticulture work and Formation, Bridge and P-Way works, it shall not be clubbed in one schedule and shall be kept in separate schedules one for CPWD DSR 2018 items and other for C.R.’s USSSOR Bridge/Formation/P-way works so that the tenderers can quote separately for the respective schedule amounts, ill Scanned with CamScanner 7354/2021 5. w i) icR File No.CR-HQOENGG(USOR)/3/2021-0/0 DY.cE(W)/HO! “The following guidelines are issued for using CPWD DSR 2018: CPWD DSR-2018 (Delhi Schedule of Rates) and CPWD pecifications-2019 (or [a shall be used forall works related to Guiding Works, Road WVOLSICr Stary ture Works and other Miscellaneous works with effect from 01.11.2024 with latest Correction Slips issued from time to time webpage of Ministry of Railways. The CPWD documents DSR-2018 (DSR Vol, 1 & Vol. 2), DSR-Horticulture and Landscaping), CPWD Specfications 2019 (Vol. 1 & Vol. 2) are uploaded by Railway Board jon Civil Engineering Directorate webpage of Ministry of Railways at the following link: http://indianrailways.gov.in/railwayboard/view_section.Jsp? Jang=0&id=0,1,304,366,526,2240 However any change or new guideline related to CPWD DSRs, AORs & Specifications shall be effective on Indian Railways only when uploaded by Ministry of Railways on Civil Engineering Directorate webpage of Ministry of Railways. (Wi) (@) CPWD DSR-2018 shall be used for preparation of all estimates with effect from 6. Copy to: CPD, 01.11.2021. The Cost Index for entire Central Railway shall be 111. (b)Only the rates of CPWD DSR-2018 corrected with Cost index shall be used for preparation of estimates and tender schedules. However, ‘this rate cannot be considered for justifying the offered rates of tenders. For evaluation of tenders, Tender Committee may consider the last accepted rates of adjacent CPWD units for similar works or other LARS with DSR-2018 for railway works available with Railway. These guidelines are issued with the concurrence of HQ finance and approval of the competent authority. For contract management, IRGCC-July 2020 shall be applicable with all correction slips issued by competent authority from time to time. (©.K.Mishra) Signed py DOnar Kumar Mishra Oe Eases teD) coh OB Bi ce cee eh gPim RRO Copy to: FA & CAO (F&B) for kind information Copy to : DY. CE (C) Works. for kind information and he is requested to Circulate it in the Construction Org, Copy to: Sr. DEN (CO) BB, NGP, PA, BSL, SUR for kind information. Copy to: Sr.DFM / BB, BSL, NGP, PA, SUR: for kind information. by Civil Engineering Directorate \o Scanned with CamScanner

You might also like