You are on page 1of 4

Nama : Muhammad Reza Yudha Pratama

NRP : 5018221054

Diketahui
Pelayaran = Manado - Hongkong Crw = 1 300 − 120
,
Konstruksi = Melintang nf = 1 C0 = 10,75 −
100
L= 120 m 120000 mm
B= 16.54 m 16540 mm
T= 12 m 12000 mm C0 = 8.335047
H= 14.54 m 14540 mm
Vs 12 knot
HDB 2m 2000 mm
R.Bilga 1.5 m 1500 mm
a 0.7 m 700 mm
Cb = 0.8
CL = 1
REH 230 N/ 𝑚𝑚
y= 8.27 8270 mm
f= 1
Cd 1
Cf 1

Perhitungan Bottom Plating dan Deck

k = 235/ReH= 1.021739 N/ 𝑚𝑚
= 225.106 − 3 . 117.3368
𝜎 ℓ = 120.5787 N/ 𝑚𝑚
𝜎 230/k = 225.1064 N/ 𝑚𝑚
230/1.021739

𝜎 120/k= 117.4468 N/𝑚𝑚 pB = 146.2554 kN/ 𝑚 0.146255 N/ 𝑚𝑚


120/1.021739
𝜏 = 0

pB1 = 152.5067 kN/ 𝑚 0.152507 N/ 𝑚𝑚

p0 = 26.255 kN/ 𝑚 0.026255 N/ 𝑚𝑚

p01 = 32.5067 kN/ 𝑚 0.032507 N/m𝑚


tK = 1.925241
t' = 14.4064914

tB1 = 16.3317321 mm diambil 17 mm

t' = 10.5729909 mm tK = 1.545991 mm

tB2 = 12.1189817 mm diambil 13 mm

tB = 17 mm

Ketebalan plat Flat Keel dan Bilga

𝑡 = 𝑡 tfk = 17 mm

Ketebalan Pelat Geladak

tmin= 4,5 + 0,05 . 𝑙 . 𝐾

= 10.61352 mm diambil 11 mm

Perhitungan Side Platting

Z (mm) Z(m)
A 956.46 0.95646
B 2628.55 2.62855 𝜎 = 89.25957 N/𝑚𝑚
C 4428.55 4.42855
D 6228.55 6.22855 = 53.82979 N/𝑚𝑚
E 8028.55 8.02855
F 9828.55 9.82855
G 11628.55 11.62855
H 12840 12.84

p0 = 26.255 kN/ 𝑚 0.026255 N/ 𝑚𝑚

p01 = 32.507 kN/ 𝑚 0.032507 N/m𝑚


𝑚 m𝑚

Perhitungan yang berada di atas water line (pelat sheer strake)

ps = 48.4416914 kN/ 𝑚 𝜎 = 152.0056 N/m𝑚

ps1 = 55.6621262 kN/ 𝑚 𝜎 = 152.0056 N/m𝑚

t'1 = 7.23151 mm tk1 = 1.5 mm

ts1 = 8.73151 mm

t'2 = 6.387535 tk2 = 1.5 mm

ts2 = 7.887535 mm

t'3 = 7.751741 tk3 = 1.5 mm

ts3 = 9.251741 mm

Perhitungan untuk pelat dibawah water line

ps = 55.41258 kN/ 𝑚

ps1 = 68.69672 kN/ 𝑚

𝜎 = 152.0056 N/m𝑚

𝜎 = 152.0056 N/m𝑚
t'1 = 7.734345 mm tk1 = 1.5 mm

ts1 = 9.234345 mm

t'2 = 7.096128 tk2 = 1.5 mm

ts2 = 8.596128 mm

t'3 = 8.611669 tk3 = 1.5 mm

ts3 = 10.11167 mm

Maka tebal pelat di atas water line = 10mm

Maka tebal pelat di bawah water line = 11mm

You might also like