ILK Maintenance Committee Inspection Report

Date: 01.07.2023
Inspector(s): ILK Maintenance committee Representatives
Company: ILK Company
Summary:
The following inspection report outlines the periodic preventive maintenance (PM) performed on various
equipment and earthmoving vehicles at ILK Company. The inspection was conducted by the members of
the Maintenance Committee who diligently checked the equipment and filled out the provided checklist.
Additionally, all relevant documents and records of periodic maintenance were carefully reviewed and
verified.

Equipment/Earthmoving Vehicles Inspected:


1. Compressor Inspection: The inspection confirmed that periodic PM was performed on the new
compressor provided on the place of damaged compressor at harbor sandblasting workshop. All checklist
items were completed and signed off by the Maintenance Committee members. The checklist indicated
that appropriate maintenance tasks were conducted, and no significant issues were found. Furthermore,
the record of periodic maintenance for the equipment was checked, and it was up to date, indicating
proper maintenance compliance.

2. Crane Inspection: During the inspection, [Equipment/Vehicle 2] was thoroughly examined, and the
checklist was completed accordingly. The Maintenance Committee members ensured that all required
maintenance tasks were performed, and the checklist was appropriately endorsed. No major concerns or
anomalies were noted. The record of periodic maintenance for [Equipment/Vehicle 2] was also inspected
and found to be diligently maintained and up to date.

Additional Observations:
Apart from the equipment specifically mentioned above, the Maintenance Committee also reviewed the
records of other equipment and earthmoving vehicles. It was found that the periodic PM inspections were
being consistently performed for the majority of the equipment and vehicles. The documentation and
records were maintained with attention to detail, reflecting a proactive approach to maintenance and
compliance.

Conclusion:
Based on the inspection and the thorough review of the checklist and maintenance records, it can be
concluded that ILK Company has implemented periodic PM procedures for the equipment and
earthmoving vehicles. However, the Maintenance Committee members dedication and commitment to
their responsibilities need to improve.

Recommendations:
While the overall maintenance practices are commendable, it is recommended to continue adhering to the
established PM procedures consistently. Encourage ongoing training and awareness among the
Maintenance Committee members to ensure their knowledge remains up to date regarding best practices
and safety guidelines.