You are on page 1of 7

Greenstar CDi Compact Combi ErP

Programmable Room Thermostat only 1H-R-P


The following labels and those like them are used to denote
generic connections (such as the live supply to components)
in order to simplify the diagram: Pipe Thermostat Frost Thermostat
L LIVE N NEUTRAL E EARTH

Legend:
L = Live Supply
N = Neutral Supply
LR = Live Return
E = Earth
C = Common
S = Satisfied Optional 240VAC Frost Thermostat for
D = Demand Pipework in unheated air space on
M = Motor External Boilers
CH D = Central Heating Demand
HW D = Hot Water Demand

Programmable Thermostat
The Link between the live (L) and common (C)
may already be fitted as part of the programmable
thermostat, if not then a link must be wired in.

N L C NC NO

N L

E
N
L Wiring
1 2 3 4 5 6 7 8 9 10
Centre

FR FS LR LR 230V
OUT
230V
IN L N E
N L N L N L N L N L

Wiring Terminals Inside Boiler

230V Mains
Voltage
Double Pole
Fused Spur

All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations.
Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions.
Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may
not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the
company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and
quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.

WG CO-C-1H-R-P a (2016/12)
Greenstar CDi Compact Combi ErP
Room thermostat only 1H-R-R
The following labels and those like them are used to denote
generic connections (such as the live supply to components)
in order to simplify the diagram: Pipe Thermostat Frost Thermostat
L LIVE N NEUTRAL E EARTH

Legend:
L = Live Supply
N = Neutral Supply
LR = Live Return
E = Earth
C = Common
Optional 240VAC Frost Thermostat For
S = Satisfied
Pipework in unheated air space on
D = Demand External Boilers
M = Motor
CH D = Central Heating Demand
HW D = Hot Water Demand

Room
Ns
Thermostat

C D

FR FS LR LR 230V
OUT
230V
IN E
N L N L N L N L N L

Wiring Terminals Inside Boiler

230V Mains
Voltage
Double Pole
Fused Spur

All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations.
Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions.
Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may
not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the
company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and
quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.

WG CO-C-1H-R-R a (2016/12)
Greenstar CDi Compact Combi ErP
2 Heating Zones 2H-R-E
The following labels and those like them are used to denote
generic connections (such as the live supply to components)
in order to simplify the diagram:

L LIVE N NEUTRAL E EARTH

Legend:
L = Live Supply
N = Neutral Supply
LR = Live Return Room Room
E = Earth Thermostat 1 Thermostat 2
C = Common
S = Satisfied
D = Demand N N
M = Motor C D C D
CH D = Central Heating Demand
HW D = Hot Water Demand

N ~ N ~
E L E L

Heating Heating
Zone 1 Valve Zone 2 Valve

E
N
L Wiring
1 2 3 4 5 6 7 8 9 10
Centre

FR FS LR LR 230V 230V
L N E
OUT IN

N L N L N L N L N L

Wiring Terminals Inside Boiler CH1 D CH2 D

230V Mains N
Voltage
Double Pole L
Fused Spur
Programmer

All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations.
Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions.
Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may
not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the
company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and
quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.

WG CO-C-2H-R-E a (2016/12)
Greenstar CDi Compact Combi ErP
2 Heating Zones with Integral Timer 2H-R-I
The following labels and those like them are used to denote
generic connections (such as the live supply to components)
in order to simplify the diagram:

L LIVE N NEUTRAL E EARTH

Legend:
L = Live Supply
N = Neutral Supply
LR = Live Return
E = Earth
Room Room
C = Common Thermostat 1 Thermostat 2
S = Satisfied
D = Demand N N
M = Motor C D C D
CH D = Central Heating Demand
HW D = Hot Water Demand

N ~ N ~
E L E L

Heating Heating
Zone Valve 1 Zone Valve 2

E
N
L Wiring
1 2 3 4 5 6 7 8 9 10
Centre

FR FS LR LR 230V
OUT
230V
IN
L N E
N L N L N L N L N L

Wiring Terminals Inside Boiler

230V Mains
Voltage
Double Pole
Fused Spur

All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations.
Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions.
Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may
not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the
company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and
quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.

WG CO-C-2H-R-I a (2016/12)
Greenstar CDi Compact Combi ErP
3 Heating Zones (Underfloor heating) 3H-U-E
The following labels and those like them are used to denote
generic connections (such as the live supply to components)
in order to simplify the diagram:

L LIVE N NEUTRAL EE EARTH

Legend:
L = Live Supply
N = Neutral Supply
LR = Live Return Room Room
E = Earth Thermostat 1 Thermostat 2
C = Common
S = Satisfied
D = Demand N N
M = Motor C D C D
CH D = Central Heating Demand
HW D = Hot Water Demand

N ~ N ~
E L E L

Heating Heating
Zone 1 Valve Zone 2 Valve

E
N
L Wiring
1 2 3 4 5 6 7 8 9 10
Centre

L N E
~
FR FS LR LR 230V 230V
OUT IN

N L N L N L N L N L N
Wiring Terminals Inside Boiler
CH1 D CH2 D E L

N
230V Mains UFH
Voltage L Zone Valve
Double Pole
Fused Spur Programmer L N E

L N E Timer
Demand

Underfloor Wiring Centre

All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations.
Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions.
Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may
not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the
company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and
quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.

WG CO-C-3H-U-E a (2016/12)
Greenstar CDi Compact Combi ErP
Frost Protection (to System Bypass) ------FB
The following labels and those like them are used to denote
generic connections (such as the live supply to components)
in order to simplify the diagram:

L LIVE N NEUTRAL E EARTH

Legend:
L = Live Supply
N = Neutral Supply
LR = Live Return
FR = Frost Return
FS = Frost Supply External Return
E = Earth Frost Thermostat Pipe Thermostat
C = Common
S = Satisfied
D = Demand C D C D
M = Motor
CH D = Central Heating Demand
HW D = Hot Water Demand We recommend that the Frost Thermostat is
installed at the coldest location. Frost
Thermostat to be set on at 5°C and the Pipe
Thermostat to be off at 15°C.

FR FS LR LR 230V 230V
OUT IN

N L N L N L N L N L

Wiring Terminals Inside Boiler

230V Mains
Voltage
Double Pole
Fused Spur

All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations.
Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions.
Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may
not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the
company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and
quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.

WG CO-C-------FB a (2016/12)
Greenstar CDi Compact Combi ErP
Cascade boilers using Low Loss Header ------LLH
The following labels and those like them are used to denote
generic connections (such as the live supply to components)
in order to simplify the diagram:
IMPORTANT NOTE:
L LIVE N NEUTRAL E EARTH The Relay should be mounted
within a suitable electrically safe
Legend: housing.
L = Live Supply NO NC NO
NC
N = Neutral Supply
LR = Live Return Wiring From Zone/s Controls
FR = Frost Return
FS = Frost Supply Junction Box / Wiring Centre Coil
C C
Coil
E = Earth L N E D Live Neutral
C = Common
S = Satisfied Example relay shown is a double
D = Demand
Pole Mains Voltage Relay. This
M = Motor L N E
CH D = Central Heating Demand
disables the boilers electrically in
HW D = Hot Water Demand case of a fault condition.
Header Limit
Thermostat

NC 230V AC
Double Pole Relay

C C N

E E
N N
L L

FR FS LR LR 230V 230V FR FS LR LR 230V 230V


OUT IN OUT IN

N L N L N L N L N L N L N L N L N L N L

Wiring Terminals Inside Boiler Wiring Terminals Inside Boiler

230V Mains
L Voltage
N Double Pole
E
Fused Spur

All electrical work should be carried out by a registered engineer. Wiring must comply with the latest IET wiring regulations.
Isolate the mains electricity supply before starting any work and observe all relevant safety precautions. Refer to all relevant product installation manuals for safety and installation instructions.
Whilst it is always our intention to fully assist, it is essential to recognise that all information given by the company is provided in good faith and based upon the information available. Connection labels may
not match those of the products installed on site. We recommend that advice should always be checked with your installer, electrician or the manufacturer of the product in question. Consequently, the
company cannot be held responsible for any liability relating to the use or repetition of such information or part thereof. In addition, whilst making every reasonable effort to monitor the performance and
quality of our supply, installation and service network, we do not accept responsibility for the workmanship or operation of any third party company.

WG CO-C-------LHH a (2016/12)

You might also like