LAMPIRAN-1

LOAD LIST - 120 VAC


DED PERBAIKAN ASPEK KESELAMATAN PENGOPERASIAN KO DRUM FASILITAS
CDGF
CONTRACT NO. DOC NO:
SPHR00130A IPMN-CDGFDURI000-ELE-LST-PHR-2005-00
DATE : 31 October 2023 SHEET : 3 OF 3
LOAD LIST - 120 VAC REV A2

CONSUMED LOAD
Absorb P.F VOLTAGE
DUTY QTY. EQUIPMENT RATING LF EFF. In
Load Lag. INPUT
NO TAG.NO EQUIPMENT DESCRIPTION REMARKS
CONTINUOUS ( C) INTERMITTENT (I) STAND BY (S)

(C/I/S) (EA) KVA HP KW KW (%) (%) P.U (A) (V) kW kVAR kVA kW kVAR kVA kW kVAR kVA

EXISTING LOAD CENTER 5 kVA AT CDGF


INFORMATION BASED
1 EXS-LOAD EXISTING LOAD CDGF C 1 1.250 1.00 0.80 80 100.00 0.8 10.42 120 0.80 0.60 1.00 ON SURVEY WITH
OPERATION
Total 0.80 0.60 1.00 0.00 0.00 0.00 0.00 0.00 0.00

CONSUMED LOAD
Absorb P.F VOLTAGE
DUTY QTY. EQUIPMENT RATING LF EFF. In
Load Lag. INPUT
NO TAG.NO EQUIPMENT DESCRIPTION REMARKS
CONTINUOUS ( C) INTERMITTENT (I) STAND BY (S)

(C/I/S) (EA) KVA HP KW KW (%) (%) P.U (A) (V) kW kVAR kVA kW kVAR kVA kW kVAR kVA

NEW LOAD AT EXISTING LOAD CENTER 5 kVA AT CDGF


2 P-0305A-H SPACE HEATER P-0305A S 1 0.095 0.076 0.06 80 100.00 0.80 0.79 120 0.06 0.05 0.08 NOTE 3
3 P-0305B-H SPACE HEATER P-0305B S 1 0.095 0.076 0.06 80 100.00 0.80 0.79 120 0.06 0.05 0.08 NOTE 3
4 HCT-P-306 SUMP PUMP C 1 0.5329 0.5 0.37 0.24 65.6 40.00 0.70 11.10 120 0.61 0.62 0.87 NOTE 3
Total 0.61 0.62 0.87 0.00 0.00 0.00 0.12 0.09 0.15
Total Load 1.41 1.22 1.87 0.00 0.00 0.00 0.12 0.09 0.15
Volt: 120
SUMMARY KW kVAR kVA PF Amp. %
Hertz: 60

Running Load Demand RD = ∑C + (IF x ∑I) IF= 50% 1.41 1.22 1.87 0.75 15.62
Peak Load Demand PD = ∑C + (IF x ∑I) + (SF x ∑Standby) SF= 10% 1.42 1.23 1.89 0.75 15.74
Existing Transformer kVA 5.0
Total Loading Transformer LT = PD / Selected Transformer 38%

SUMMARY Note :
> Continous Current (Peak Load) 15.74 A 1 TBA = To Be Affirmed
> Min. Transformator Rating 1.89 kVA 2 Existing Loads
> Existing Transformer 5.0 kVA 3 New Loads
> Total Loading Transformer 32 (%) 4 C = Continuous ; I = Intermittent ; S = Standby.