You are on page 1of 10

SHAIKH CONSTRUCTION

Page No. 1 Date

aritrsTE U

HEHE ZIAGTgA ta (Contractor)

SHAIKH GROUP& COMPANY


SHAIKH CONSTRUCTION

Date :
Page No. 2

9) YraT: 4eet
2) Eor t/Plinth Level:

3) 3TR. ft. t./R.C.C. Work Drawing & Design urÝ et.

-(1 xtx9)

9 frere (Plaster) :- arç = Apdgter er


-Coure DesgreM =
) yA GATGT :

SHAIKH GROUP & COMPANY


COMPANY GROUP& SHAIKH
(Loft) : uust )
(Window):-
mm 12 fasqu 5)
sheet Afbre Alini
No.3Page
Date:
RUCTION SHAIKH
SHAIKH CONSTRUCTION
Date :
Page No. 4

f:

) reft (Flooring) :
tYr (Hall) :- gs00/gks
fera (Kitchen) :- 9soe/Bcss
tse (Bedroom) :- 95co/Bsess à
RATE
SL. NO SIZE

1) 12x18 Wall Tile

2) 12x18 Dholl puri

3) 12x18 Bath o

4) 4)

90) fast fRrer (Window Seal) :

10Xs eet

SHAIKH GROUP & COMPANY


SHAIKH CONSTRUCTION

Date:
PageNo. 5

93) rr zt (Staircase Steps) :


Riser: Mecbomk Trade: &ed gg gr
94) fRri~e (Cement) ;- ULoael A:e.c.
96) ara (Sand) :
pfaT aTa (Crash Sand) :-\ emaunn
0) fër (Plumbing) :- aaSupreimeloc
9c) arafT (Wiring) :
Wire :pycub
Total :
4 Point

ats (Board) :- Gm.

SHAIKH GROUP& COMPANY


SHAIKH CONSTRUCTION

Page No. 6 Date :

98) beR (Colour):

Romak| va.ke
29) 24 (Tarrace) :

22) s (Tank) :- ) ff s :

2) RraH:

SHAIKH GROUP & COMPANY


SHAIKH CONSTRUCTION

Page No. 7 Date:

24) sretet BHTA sizrd H:- 1g0 X1350 16,06, 50o/

12 HfeTHt quf urft sTE.

SHAIKH GROUP& COMPANY


COMPANY GROUP& SHAIKH
|UR frgT
No8. Page
Date
NSTRUCTION SHAIKH
SHAIKH CONSTRUCTION

PageNo. 9 Date:

o-Tet Ttr.

tu Saft/ 3ifart/ final qsse/ yfT tre TSr.


Design Tst ee HH Slab Extention Sgft Htà trre TST.

33) E

?. oYsegr = \001 Rs.


. ufg HI = Y0% RIRER0ER (Plinth quf) 5,00,
o,oaol
5,o0,oeo)
",o6, soo/
SHAIKH GROUP&COMPANY
SHAIKH CONSTRUCTION

Page No. 10 Date

farg torR- HTE-t)

SHAIKH GROUP & COMPANY

You might also like