Professional Documents
Culture Documents
RF Optimization Engineer
QUALIFICATION
EXPERIENCE
EMPLOYMENT HISTORY
PT. Nexwave, Jan 2023 - Present
PT. China Comservice Indonesia, Jan 2022 – Jan 2023
PT. Nexwave, May – Dec 2021
PT. GCI Indonesia, Oct 2020 – Apr 2021
PT. China Comservice Indonesia, Oct 2019 – Oct 2020
PT. GCI Indonesia, Mar 2018 – Sep 2019
PT. China Comservice Indonesia, Apr 2017 – Feb 2018
PT. Lintas Media Telekomunikasi, Dec 2015 – Mar 2017
PT. GCI Indonesia, Mar 2011 – Dec 2015
PT. Mobile-8 Telecom, Dec 2006 – Mar 2011
PT. Aplikanusa Lintasarta, Mar 2004 – Dec 2006
6 Months
XL Axiata - NPI East Jul 2023
As RF Optimization (L2)
Led a team of RF Optimization, RF Engineer, and Rigger.
Achieved KPI Rank 5 (RSRP_Pop, LTC, DL_SE, E2E Delay, E2ED Gaming) in 7 cities and 125 districts
within a 6-month period.
Conducted WPC and Badspot optimization and hygiene clearance.
Implemented strategic and feature trials.
6 Months
Telkomsel - Roll Out Bali Nusra Jan 2023
As PLO Leader
Oversaw the delivery of new sites for Telkomsel in the Bali Nusra Area.
Managed Huawei partners to ensure successful SSV, QC, and acceptance requirements.
Scheduled resources and managed project workload to meet targets.
Facilitated customer reviews and provided support for event and complaint handling.
1.5 Years
Telkomsel - VoLTE Roll Out Bali Nusra Jun 2022
As Team Leader
Served as team leader for the VoLTE roll out in Bali Nusra, responsible for RF optimization, strategic
optimization, and feature implementation.
Ensured optimization efforts met targets and SLAs.
Acted as a presenter for progress updates, issues, and acceptance to customers and other departments.
Handled VoLTE complaints and events, conducting analysis and optimization to improve call drops,
accessibility, mobility, and voice quality.
Analyzed VoLTE call flows, failures, and call quality using tools such as Genex assistant, OMStar,
SmartCare, and PCHR.
Conducted trace analysis and post-processing of drive test data using SIP/RTP analysis
As RF Optimization
New site and cluster optimization for achieving K1, K2, K3 requirement
Antenna physical tuning
Initial neighbor creation
Basic parameter implementation
Frequency retunes
Site hygiene check and escalation
KPI monitoring
Cross feeder analysis and troubleshooting
Ensure SSV, Cluster and KPI report and progress meet target
Manage DT engineer and rigger progress
As PLO
New site and mini cluster optimization
Antenna physical tuning
Initial neighbor creation and basic parameter implementation
Frequency retunes
Site hygiene check and escalation
KPI monitoring
Cross feeder analysis and troubleshooting
Ensure SSV, SSO and QC report and progress meet target
Manage DT engineer and rigger progres
As RF Engineer
SSV report creation
L0 KPI report creation
initial neighbor creation
Basic parameter implementation
Frequency retunes
Site hygiene check and escalation
KPI monitoring
SSV and L0 progress tracker
DT engineer and rigger progress tracker
1 Year ‘
Bakrie Telecom - SMS E2E NPI Mar 2012
As OMC Engineer / OSS Engineer
SMS End to End NPI daily reporter
SMSC weekly reporter
Collected and analyzed various data (RAN, CN, VAS and IN/Billing and DT logfile)
Tools maker for processing RAW data using VBA and Bash
Process RAW data into become End to End report
DT logfile analysis
KPI Monitoring and escalation
Failure and contributor analysis
Performed BSC signaling trace
EDUCATION