Reason of vector group selection of transformer YNd11 & YNyn0 for unit
aux transformer & Station transformer.
The phase shift in the Transformers needs to be grouped at New TPP, for that a
combination of YNd11 (GT) & Dyn1 (UAT) ensures Phase Reference: GRID at 6.6kV
Service Bus at TPP
Also note that YNyn0 Trafo introduces ZERO phase Shift, Hence Phase Reference shall
remains the same.
132 kV Bus
60/80 MVA
YNd11
( New Trafo )
GT
10/12.5
MVA YNyn0
Dyn1 ( New Trafo )
( New ST
Trafo )
UAT
Phase Ref: GRID
60 MW 6.6 kV Service Bus at TPP
Synchronizing Breaker
Shailesh Kumar
For any comments: Kindly comment on forum
Reason for Ynd11 & Dyn1 combination for Generator & UAT ->
Phase reference at EHV Bus (say 132kV as indicated) & at UAT bus (say 6.6kV
as indicated) are same
ST & UAT & GT can be paralleled
For Plant black start system earthing at UAT Bus is achieved (say 6.6kV as
indicated)
Ground fault Isolation, thus generator Stator Core is effectively protected by an
High Impedance Grounding, which inherently its specific ZONE
When you have all above answers, VECTOR GROUP CRITERIA CAN BE
ESTABLISHED