Report On
Micro Project

PROGRAM CODE: CE5I


COURSE NAME: EAC
COURSE CODE: (22502)

Submitted by
Group No: 11
Submitted to
Mr. Mayur Suryavanshi

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

MAHARASHTRA STATE BOARD OF TECHNICAL


EDUCATION

VIVEKANAND EDUCATION SOCIETY


POLYTECHNIC
MICRO PROJECT
Academic year 2022-23
TITLE OF PROJECT
Prepare a detailed estimate of 1BHK (Center Line Method )Manual and by
using software
Program: Civil Engineering Program Code: CE5I
Course: EAC Course code: 22503
Seat No. :

Roll
Names Enrollment No.
No.
41 Pranay Dekhale 21000400
42 Sayyed Maaz 21000400
43 Vaibhav Sawant 21000400
44 Vignesh Varak 21000400

INDEX
Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)
lOMoARcPSD|33380507

Sr.
Contents Page
No.

1 Part A. Micro Project 4


2 PART B. Final Micro project 6
3 Rationale. 5
4 Aim of Micro project. 5
5 Course Outcome Integrated. 6
6 Actual procedure Followed 7
7 Actual Resources used. 8
8 Output of the Micro project. 9

Skill developed\learning out of the Micro


9 6
project.

10 Reference

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

MAHARASHTRA STATE BOARD OF


TECHNICAL EDUCATION
Certificate

This is to certify that Group No.:11 Roll No’s.: 41,42,43,44, of 5th Semester Diploma
in Civil Engineering of Vivekanand Education Society’s Polytechnic (Code No 0004)
has completed the Micro-Project work satisfactory in Estimating And Costing
(22503) for the academic year 2022-2023 as prescribed in the MSBTE curriculum.

Place: Chembur Date:

Enrollment No:21000400 Seat no.

Subject Teacher Head of the Department Principal


Mr.Mayusr Suryavanshi Ms.: Sanskruti Dharmale Mr.:Vikrant Joshi

Seal of
Institution

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

Annexure-I

PART-MICRO PROJECT PROPOSAL


MICRO PROJECT TITLE:
Prepare a detailed estimate (Center line Method )
manual and by software
➢ Aims/Benefits of the micro project.
➢ Use of relevant software to prepare detailed estimate of any of the rooms .

➢ Course outcome addressed.

➢ Prepare detailed estimate of a civil engineering works.


➢ Use relevant software for estimating the quantities and cost of items of work.

➢ ACTION PLAN.

Planned Planned Finish Name of


Sr .No Details of the activity
Start date Members

Formation of group &


1 All members
Topic Selection

Submission of
2 All members
proposed Plan

3 Preparation of Report All members

Final valuation of a
4
working Report
All members

5 Presentation: Report All members

6 Submission of Final Report All members

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

➢ Resources Required

Name of
Sr.No. Resource/material Quantity
Specifications
Specifications
To refer Microsoft
1 Books 1
software designerXP

Microsoft word
2 Computer / internet document with 1
internet facility

➢ Name of team Members

Sr
Roll No. Name
No.
1
41 Pranay Dhekale

2 42 Sayyed Maaz

3 43 Vaibhav Sawant

4 44 Vignesh Varak

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

Annexure - ||

PART B: Final Micro-Project Report


MICRO PROJECT TITLE:
Prepare a detailed estimate of a 1BHK (Center line Method ) Manual
And by using software .
❖ Practical significance.
• Software design is a process to conceptualize the software requirements into software
implementation. Software design takes the user requirements as challenges and tries to find optimum
solution. While the software is being conceptualized, a plan is chalked out to find the best possible
design for implementing the intended solution.

❖ Aim Micro Project


❖ Use of relevant software to prepare detailed estimate of any of the rooms .

❖ Course outcome integrated.


❖ Prepare detailed estimate of a civil engineering works.
❖ Use relevant software for estimating the quantities and cost of items of work.

❖ Actual Methodology Followed:


• Make a list of information required for report.
• Preparation of report as directed.
• Collecting information about various Software use for the design of steel structure and
give details any one software
• Making a report and checking it.

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

❖ Actual Resources Used.

Sr.
Name of Resource/material Specifications Quantity
No.
Specifications
To refer Microsoft
1 Books software 1
designerXP
Microsoft word
document with
2 Computer / internet 1
internet facility

❖ Outputs of the MICRO-PROJECT


❖ Center Line Method

Item
Sr.No. No. Length(m) Breadth (m) Hieght(m) Quantity
Description
Earthwork in
Excavation in
Foundation:
1 1 44.40 0.90 1.10 43.96
48.9-
0.90/2*10
44.4
P.C.C.for
Foundation
2 48.9- 1 44.40 0.90 0.20 7.99
0.90/2*10
44.4
Brickwork in
Cement
3
Mortar in
Foundation

Center Line Method of Building Estimation | Building Estimation By Centre Line Method | Center Line Plan and
Estimation | Center Line Method of Estimation Excel Sheet
By Bhushan Mahajan
Building Estimation By Center Line Method
• How to Calculate Center Line In Plan
• Center Line Method of Building Estimation Example
• Download Building Estimation Excel Sheet
Building Estimation By Center Line Method

In this method, sum total length of center lines of walls, long and short has to be found out. Find the
total length of center lines of walls of the same type. Long and short have the same type of foundation and footing
and they find the quantities by multi-plying the total center length by the respective breadth and height.

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

In this method, the length will remain the same for excavation in the foundation for concrete in
the foundation. For all footings and for the superstructure. (With slight difference when there are cross walls or
the number of junctions). This method is quick but requires special attention and consideration at the
junction, meeting points of cross walls, etc.

• How to Calculate Center Line In Plan

Center line length of one wall = inner dimension of room + Wall thickness

= Inner dimension of room + ½ x Wall thickness of one side + ½ x wall thickness of other.

• Centre line length of horizontal wall


= 4 + 0.45 + 0.45

= 4.90 m

• Centre line length of vertical wall


= 3 + 0.45 + 0.45

= 3.90 m

Total Length of excavation for foundation

= 2(4.90 + 3.90)

= 17.6 m

Quantity of excavation for foundation

= Total length of centre line of walls x breath of trench x Depth of trench

= 17.6 x 0.9 x 1.2

= 19.01 m3

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

For rectangular, circular or polygonal buildings having no inter or cross walls, this method is quite simple but for
buildings having a cross or partition walls, for every junction of partition or cross walls with main walls, a half
breath of the respective item or footing is to be deducted from the total center length.

Net Centre line length – (½ x breath of wall x number of the junction)

Following Points in relation to the center line method should be noted.

• The term junction is used to indicate the meeting points of cross walls or partition walls with main walls.
• For instance, if there is one cross wall there will be two junctions. At the corner of a building, no junction is
formed.
• For rectangular building with no cross wall there will not be any junction and hence no deduction from
the centre line length will be required. It is fact that is certain portion taken twice is counter balanced by same
amount portion left out at the corner.
• The breath indicates the width of item whose centre line is being worked, for instance it will be the width of
trench of excavation and foundation concrete. But for brick masonry up to plinth or for superstructure will be
equal to the corresponding thickness of wall.

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

For a two-room building with the inner cross wall, two junctions will be formed shown in fig.

Total Centre Line length

= (2 x AB + 2 X BC + EF)

= (2 X 9.50 + 2 X 5.5 + 5.5)

If this center line length is multiplied by the width and depth, the quantity at junction P and Q will come twice,
the quantity of each being equal to ( ½ x width x Depth ).

Hence the quantity of these two junctions must be deducted to get the net center line length.

Net Center Line Length

= (Total Centre line length – (width/ 2) x No. of junction)

= 35. 50 – (½ x 0.90) x 2

= 34. 60 m

Center Line Method of Building Estimation Example

Let’s take on the example of a building plan and calculate its quantity by using the center line method of
estimation.

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

Building Section for Estimation

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

Building Estimation by Center Line Method Excel Sheet

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

❖ Actual Resources Used

Sr Name of Resource/material Quantity


Specifications
.No. Specifications

1 Books To refer (M.N. GANGRADE) 1 1

Microsoft word document with


2 Computer / internet 1
internet facility

❖ Outputs of the MICRO-PROJECT


• In the past, if you wanted to design or construct a steel structure, you first needed to manually construct
a construction plan and had to come up with hundreds of sketches on paper. This was a tedious process
and was quite time-consuming.
• Today anyone with design capabilities can use software that allows you to easily create complex steel
structures with ease. In this article, we will try covering some of the best software options available for
you to start designing your steel structure.

❖ Applications of this micro-project:


• Intelligent structural objects
• Steel shop drawings
• NC data- can generate data for CNC workshop machines
• BOM’s based on design data
• AutoCAD Plant 3D interoperatibility
• Robot structural – optimize structures using bidirectional links
• Open and flexible API
• Ability for several users to work on the same project at the same time
• You can color-code objects based on approval status

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

Micro-Project Evaluation Sheet

Name of Students: Pranay,Maaz ,Vaibhav,Vignesh.

Program: CE

Semester: 5th

Course Title: EAC

Code: 22503

Title of the Micro-Project: Enlist various software use for the design of steel structure and give details
any one software.
Course Outcomes Achieved:-. Today anyone with design capabilities can use software that allows
you to easily create complex steel structures with ease. In this article, we will try covering some of the
best software options available for you to start designing your steel structure.

• Select the relevant materials

Poor Average Good Excellent


Sr Characteristic to be Sub
Marks Marks Marks Marks
No. assessed Total
1-3 4-5 6-8 910
(A)Process and product assessment Out Of 6
Relevance to the course
1
Literature Survey
2 Information Collection

Completion of the Target


as
3
per project proposal

Analysis of Data and


4 Representation

Quality of
5 Prototype/Model/Content

Report Preparation
6

(B)Individual Presentation/Viva Out of 4


Presentation
7
Viva
8

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)


lOMoARcPSD|33380507

Micro-Project Evaluation Sheet (for group file)


Major learning outcomes achieved by students by doing the project:

a) Practical outcomes: Prepare reports of the


given type of events/episodes/incidents.

b) Unit outcomes in Cognitive domain: Communicate effectively in a


professional setting using skills of Maintenance and Repairs of

Structures.

c) Outcomes in Affective Domain:

Function as team member

Comments/suggestions about team work /leadership/inter-personal


communication (if any)

Team work-

Leadership

Inter-personal communication-
individual
ROLL
Process and product assessment Out Of Total
(6) Presentation/Viva (4 (10)
NO-
marks)

41

42

43

44

Lecturer: Mr. Mayur Suryavanshi Signature

Downloaded by Jyoti Kambale (jyotikambale26@gmail.com)

You might also like