You are on page 1of 2

Assessing the effectiveness of acidizing treatments near a wellbore hole in petroleum

engineering typically involves a combination of methods and tests to evaluate the


success of the treatment. Here are some common methods and tests used to determine
if acidizing has been effective:

1. Production Data Analysis: Monitoring the well's production data before and
after acidizing can provide critical information. You can assess changes in
production rates, pressure, and fluid composition to determine if there has been
an improvement in oil or gas production.
2. Pressure Transient Analysis: Conduct pressure transient tests, such as pressure
buildup and drawdown tests, to assess the reservoir's response to the acid
treatment. These tests can help identify changes in reservoir characteristics and
pressure behavior, which can be indicative of the treatment's effectiveness.
3. Wellbore Imaging: Use wellbore imaging tools like borehole cameras or caliper
logs to inspect the condition of the wellbore and identify any changes in the
formation near the well. This can reveal the presence of wormholes, fractures, or
etched areas created by the acid.
4. Core Analysis: Core samples taken from the reservoir before and after acidizing
can be analyzed to assess changes in porosity, permeability, and mineral
dissolution. This can provide direct evidence of the treatment's impact on the
reservoir rock.
5. Fluid Sampling and Analysis: Collect fluid samples from the wellbore before and
after acidizing to determine changes in the fluid composition, such as changes in
oil, water, and gas ratios. This can indicate whether acidizing has improved the
flow of hydrocarbons.
6. Acidizing Additives: Analyze the chemical additives used in the acid treatment
to ensure that the correct type and concentration of acid were employed. This is
critical for evaluating the treatment's success.
7. Wellbore Temperature Measurements: Monitor temperature changes in the
wellbore before and after acidizing. Temperature increases may indicate the
dissolution of mineral deposits in the reservoir rock.
8. Production Logging Tools: Use production logging tools, such as flowmeters
and temperature and pressure sensors, to assess fluid flow profiles along the
wellbore. This helps identify any variations in fluid inflow that may indicate the
treatment's effect.
9. Fluid Injection Rate and Pressure Monitoring: Continuously monitor the
injection rate and pressure during the acidizing treatment. Changes in injection
pressure can provide insights into the treatment's progress.
10. Post-Treatment Well Testing: Conduct well testing (e.g., well testing for
deliverability) after the acidizing treatment to evaluate the well's performance
and determine the impact on production rates.
11. Geophysical Surveys: Perform geophysical surveys, such as seismic or
microseismic surveys, to assess any changes in the reservoir's subsurface
structure and integrity.
12. Microscope and Laboratory Analysis: Examine samples from the wellbore and
reservoir rock under a microscope to look for changes in the rock's surface, pore
structures, and mineral dissolution.

By combining these methods and tests, petroleum engineers can thoroughly evaluate
the success of acidizing treatments near wellbore holes and make informed decisions
about the need for further treatments or adjustments in the oil and gas production
strategy.

You might also like