Position : Consultant - Technical Advisor for Blue Ecosystem
Type of Contract : Consultant based
Contract : Every 3 months with possible extension Salary : IDR 10.000.000/ Month Office hour : Output based with flexible working hours. Work from Office 2 days per week required for meeting and coordination and offline meeting with external/client if required Scope work :
N Task Detail Activities Output Duration and
o Expected Completed Time
1 Submission of 1. High-quality submission of 1. The method submitted is 2 months in total
mangrove the method submission approved for verification carbon procedure/process for the and validation of the - 1 week for each quantification mangrove project carbon mangrove project for detail activities method (afforestation project) SRN (activities #2 and 2. Draft carbon quantification 2. Documents to submit #3) method for another type of the method October/November mangrove project (e.g 3. Comprehensive flow of Reforestation, submission process - 2 months Revegetation and (slide format) (submission Protection) 4. Socialisation and method to SRN) 3. Identify and create the transfer of knowledge submission flow as a with CE members on the lesson learned from the methodology submitted first submission
2 Screening 1. Identify, review and 1. Report of identification 2 weeks in total
standards or compare available and comparison methodologies standards or between standards or for Blue Carbon methodologies for Blue methodologies (slide Project Carbon projects format) (Microsoft, Verra, 2. Report of upcoming PlanVivo, etc.). trends and technologies 2. Identify and analyse the in blue carbon (slide upcoming trends and format) technologies in blue 3. The results are carbon. disseminated in CE with 3. Write a presentation and clear working plans disseminate the results via market insights.
3 Deep 1. Identify the best method to 1. Review of existing 2 weeks in total
understanding of quantify carbon in the seagrass carbon project the seagrass seagrass (slide format) Due date in carbon project ecosystem/project 2. Recommendation October/November 2. Identify the project method for carbon scope/type/boundaries quantification in 3. Identify project seagrass project (slide management and format) monitoring methods (to 3. Recommendation increase/maintain the method to manage and carbon stock) monitor the project (slide format)
4 Deep 1. Develop a comprehensive 1. Recommendations for 2 weeks in total
understanding of monitoring or maintenance the implementation and the seagrass method to improve the evaluation of the Due date in October transplantation survival rate of proposed method (slide project transplanted seagrass format)
5 Growth and 1. Develop a formula or 1. Calculation template for 2 weeks in total
carbon modeling adopt a formula to project growth and carbon tree growth projection from CE sites Due date in October 2. Train science and ops 2. Monitoring record team to understand the adjustment factors needed in projections
Conceptual Project of The Classic FireSat Mission For The Monitoring of Forest Fires in The Northeast of Brazil Using The Space Mission Analysis and Design (SMAD) Process