GIVEN

Q1 : It is decided to use the sand soil of Al Najaf small hill (mount of Al Howaish) in
construction of the embankment for the road around the old city. The soil properties
of the hill are, total unit weight of 18 kN/m3, water content of 30%, specific gravity
of 2.65, and the maximum dry unit weight of 15.07 kN/m3 and optimum moisture
content of 32%. The characteristics of the embankment are: degree of compaction
of >95%, the embankment was in a trapezoidal shape with dimensions of 16m in
the width of the top level, 1m in the height, and the side slope of 2:1. What is the
volume in (m3) of the soil from the hill needed to construct the embankment? Find
the dry unit weight, saturation, void ratio, porosity for the hill and embankment.
What are the effective considerations in the construction of the embankment?
Estate the formula used to classify the sand soil according to density. Give the
range of the classification. What is the suitable method to examine the coefficient
of permeability of the origin soil? Why, derive it.
Length=1000m

Q2 : The in-situ moisture content of a soil is 18% and its moist unit weight is 105pcf.
The gravity of the soil is 2.75. This soil is to be excavated and transported to a
construction site, and then compacted to a minimum dry weight of 103.5pcf at a
moisture content of 20%:
a. How many cubic yards of excavated soil are needed to produce 10000 yd3 of
compacted fill?
b. How many trucks are needed to transport the excavated soil, if each truck can
carry 20 ton?

Q3 a contractor has compacted the base course for a new and found that the average
values of test samples show the water content of 14.6%, specific gravity of 2.81,
and the unit weight of 18.2 kN/m3. Knowing that the specifications require that
the void ratio ≤ 0.80, has the contractor complied with the specifications?
SOLUTION

Q1. Diketahui : γ = 18 Kn/m³


w = 30%
Gs = 2,65
γdmax = 15,07 kN/m³
𝑤𝑜𝑝𝑡𝑖𝑚𝑢𝑚 = 32%
Dimensi tanggul = side slope : 2:1,
width top level : 16 m,
height :1m
length : 1000 m.
Ditanyakan :
a. Volume tanah dari bukit yang dibutuhkan untuk membuat tanggul?
b. Hitung Dry unit weight, saturation, void ratio, porosity dari tanah di bukit
dan tanggul!
c. Apa saja pertimbangan efektif dalam pembangunan tanggul?
d. Estate rumus yang digunakan untuk mengelompokkan tanah pasir menurut
massa jenisnya (density)? Berikan kisaran klasifikasinya?
e. Metode apa yang cocok untuk menguji koefisien permeabilitas tanah asal?

Penyelesaian :

16 m
A B

1m

C D

0.5 16 m 0.5
m m
✓ Persentase kemiringan
2
s = 1 𝑥 100% = 2%
2
tan α = 1

α’ = 𝑡𝑎𝑛−1 𝑥 2⁄1
= 63,43
✓ Luas Trapesium
1
L = 2 x t x (AB + CD)
1
= 2 x 1 x (16 + 17)

= 16.5 m²
✓ Volume Trapesium
V = Luas x Length
= 16.5 m² x 1000 m
= 16.500 m³
✓ Dry unit weight tanah di Bukit
γ 18 kN/m³
γd = = = 13,846 kN/m³
1+w 1+0,3

a. Volume tanah dari bukit yang dibutuhkan untuk membuat tanggul

𝑊𝑏𝑢𝑘𝑖𝑡 = 𝑊𝑡𝑎𝑛𝑔𝑔𝑢𝑙
𝑉𝑏𝑢𝑘𝑖𝑡 𝛾𝑏𝑢𝑘𝑖𝑡 = 𝑉𝑡𝑎𝑛𝑔𝑔𝑢𝑙 𝛾𝑡𝑎𝑛𝑔𝑔𝑢𝑙
16.500 𝑚³ 𝑥 15,07 𝑘𝑁/𝑚³
𝑉𝑏𝑢𝑘𝑖𝑡 =
13,846 𝑘𝑁/𝑚³

= 17.958,61 𝑚³
b. Dry unit weight, saturation, void ratio, porosity dari tanah di bukit dan
tanggul
✓ Pada Bukit
Dry unit weight
γ 18 kN/m³
γd = = = 13,846 kN/m³
1+w 1+0,3

Void ratio
𝐺𝑠 𝑥 𝛾𝑤 2,65 𝑥 9,81
e= −1= − 1 = 0,877
𝛾𝑑 13,846

Saturation
𝑤 𝑥 𝐺𝑠 0,3 𝑥 2,65
S= 𝑥 100% = 𝑥 100% = 90,65%
𝑒 0,877

Porosity
𝑒 0,87
n = 1+𝑒 = = 0,46
1+0,87
✓ Pada Tanggul
Dry unit weight
𝛾𝑑 = 𝛾𝑑 𝑚𝑎𝑥 = 15,07 𝑘𝑁/𝑚³
Void ratio
𝐺𝑠 𝑥 𝛾𝑤 2,65 𝑥 9,81
e= −1= − 1 = 0,725
𝛾𝑑 15,07

Saturation
𝑤 𝑥 𝐺𝑠 0,32 𝑥 2,65
S= 𝑥 100% = 𝑥 100% = 117%
𝑒 0,725

Porosity
𝑒 0,725
n = 1+𝑒 = = 0,420
1+0,725

c. Pertimbangan efektif dalam pembangunan tanggul

1. Parameter desain, meliputi parameter desain topografi, hidrologi, dan


geoteknik yang merupakan hasil dari analisis data.
2. Informasi material tanah yang dijadikan bahan pembuatan tanggul
berupa sifat berat jenis, void raio, saturation, dsb.
3. Informasi atau data bangunan dan timbunan tanggul yang tersedia,
sarana dan prasarana serta tenaga kerja yang tersedia.

d. Rumus untuk mengklasifikasikan sand soil berdasarkan density


𝐺𝑠 𝑥 γw
𝑒 min = γd(max) -1
2.65 𝑥 9.81
= -1
15.07)

= 0.725
Asumsi clean sand dengan fine content (Fc) = 0%-5%
emax = 1.62 emin
= 1.62 x 0.725
= 1.1745
𝑒 max − 𝑒
𝐷𝑟 = e max − 𝑒 𝑚𝑖𝑛
1.1745−0.877
= 1.1745−0.725

= 0.6618
e. Metode yang cocok untuk menguji soil permeability adalah
1. Uji laboratorium
- Falling Head Test

- Uji Oedometer

2. Uji langsung
Pumping Test Unconfined Flow Dan Confined Flow
Q2. Diketahui :
γ = 105 pcf
w = 18% = 0,18
𝛾𝐾𝑜𝑛𝑡𝑟𝑢𝑘𝑠𝑖 = 103,5 pcf
Vkontruksi = 10.000 yd3
Gs = 2,75
𝛾𝑑= 𝛾
1+𝑤
105 𝑝𝑐𝑓
= 1+0,18

= 89 pcf = 89 𝑙𝑏⁄𝑓𝑒𝑒𝑡 3

Ditanya :
a. Volume tanah galian yang dibutuhkan untuk menghasilkan 10000
yd3 timbunan yang dipadatkan?
b. Jumlah truk yang dibutuhkan untuk mengangkut tanah galian, jika
setiap truk dapat mengangkut 20 ton?
Penyelesaian :
a. W=Vxγ
Wtanah galian yang dibutuhkan = Wtanah yang telah dipadatkan
Vgalian x γgalian = Vdipadatkan x γdipadatkan
𝑉𝑔𝑎𝑙𝑖𝑎𝑛 x γdipadatkan
Vgalian = γgalian

10.000 𝑦𝑑3 𝑥 105 𝑙𝑏⁄


𝑓𝑒𝑒𝑡 3
= 𝑙𝑏
89 ⁄
𝑓𝑒𝑒𝑡 3

= 11629,2 𝑦𝑑3
𝑓𝑒𝑒𝑡 3⁄
11629,2 𝑦𝑑3 𝑥 27 𝑥 105 𝑙𝑏⁄
𝑦𝑑3 𝑓𝑒𝑒𝑡 3
b. Jumlah Truk =
20 𝑡𝑜𝑛⁄𝑡𝑟𝑢𝑐𝑘 𝑥 2000 𝑙𝑏⁄𝑡𝑜𝑛

= 824,2
= 824 truck
Q3 Diketahui :
Kontraktor telah melakukan pemadatan dengan data sebagai berikut:
Gs = 2,81
𝛾𝑤 = 9,81 𝑘𝑁⁄𝑚3

γ = 18,2 𝑘𝑁⁄𝑚3

w = 14,6 % = 0,146
Ditanya : Apakah kontraktor telah memenuhi spesifikasinya dengan e = ≤ 0,8 ?
Penyelesaian :
𝐺𝑠 𝑥 𝛾𝑤 𝑥 (1+𝑤)
γ=
1+𝑒
𝐺𝑠 𝑥 𝛾𝑤 𝑥 (1+𝑤)
1+e = 𝛾

2,81 𝑥 9,81 𝑘𝑁⁄ 3


𝑚 𝑥 (1+0,146)
1+e =
18,2 𝑘𝑁⁄ 3
𝑚

1+e = 1,74
e = 1,74 – 1
= 0,74 ≤ 0,8 (Kontraktor telah memenuhi syarat sesuai
spesifikasinya)