You are on page 1of 1

DEPARTMENT OF COMPUTER ENGINEERING

BAHRIA UNIVERSITY KARACHI CAMPUS

JUSTIFICATION: The equipment and Items mentioned in the Minute are necessary for the lab operations.

S. NO. ITEMS REASON & JUSTIFICATION

Mother Board Intel® Core™ The Computer Networks Lab system was thoroughly diagnosed by the IT Department
1
i3-4130 CPU @ 3.4GH which concluded the motherboard failure issue in a system.

The Computer Networks Lab has some of the experiments on hardware in which
patch cord is created and different testing has to be performed on cable testers. As
2 Network Cable Tester the Computer Network Lab has an insufficient number of workstations, we required
the number mentioned quantity of Network Cable Testers to fulfill the requirement of
the Lab smoothly.

The LCDs of the Lab were thoroughly diagnosed by the IT Department which
3 LCD Lenovo 18.5 Inch
concluded the LCD Screen failure issue.

You might also like