Professional Documents
Culture Documents
Project Title Enhancing Readiness for the Transition to Electric Donor GEF Trust Fund (through UNDP Indonesia)
Vehicles in Indonesia (ENTREV) – Full NIM
Govt Implementing Partner Directorate General of Electricity (DGE), Ministry
Duration 4 years (Feb 2023 – Early 2027) of Energy and Mineral Resources of Indonesia
(MEMR)
PROJECT ENTREV
PROJECT ENTREV
BEV’s Price & Total Cost of Ownership The Cost of Converting from ICE
(TCO) more Expensive than ICEV Motorcycles to BEV
THE CURRENT CONDITION OF CONVERTED E-MOTORCYLES
INCENTIVE PROGRAM
1%
Total Applicants:5,758
- Con.process: 74
- Waitinglist: 1,970
34%
- cancel : 3,714
65%
1. The essential spare parts are imported 1. Lack of awareness people about ICE
(Battery is the most expensive) motorcycles Conversion to BEV
2. Cost to register as converted workshop 2. Lack of certified workshop conversion
Grade A is expensive. to E-motorcycles
3. Total conversion cost after the
incentive program still considered high
(around IDR 7-8 mln) – lack of interest
and affordability
4. Long steps of bureaucrat for the
incentive program
5. Unavailability Public charging stations
or SPBKLU for Converted Motorcycles
ENTREV SUPPORT TO STRENGHTHEN E-MOTORCYCLES
ECOSYSTEM
1. Boost workshop certification at Vocational School (SMKN)/BLUD (District Public Service Agency)
• Provided Kit Conversions (including the ICE Motorcycles) to 6 SMKN in West Java
• Building Partnership with potential SMK in DKI Jakarta, West Java and Bali
• Mapping small workshop to be affiliated with certified workshops.
• Conduct lesson learn from a verified workshop (Percik) in Bali on minimalizing registration fee to get Grade A
workshop
2. Encourage a group of people to do the conversion
• Partnership with CSO – Society for Renewable Energy (SRE) to achieve 1,000 E-Motor Conversion &
Strengthen Ecosystem + public campaign (targeted group youth)
• Partnership with Hyundai Kefico (Business Entity) to implement innovative Business model for E-motorcycles
Conversion in Bali Province
3. Encourage development of Public charging/swap battery for E-Motorcycles conversion
• Create roadmap for potential location for SBPKLU/public charging for E-Motorcycles Conversion for 3 Pilot
regions
• Create financial model business study on SPBKLU
• Develop pilot Project on SPBKLU Hybrid Solar PV & Private Installation Charging Hybrid Solar PV with BBSP
MEMR
THE IMPACTS ON ENERGY SYSTEMS & EMISSIONS
THANK YOU
Comp2.entrev@mitrakerjsaesdm.go.id