SAP PS MOCK TEST

http://www.tutorialspoint.com Copyright © tutorialspoint.com

Advertisements

This section presents you various set of Mock Tests related to SAP PS. You can download these sample
mock tests at your local machine and solve offline at your convenience. Every mock test is supplied with a
mock test key to let you verify the final score and grade yourself.

SAP PS MOCK TEST III

Q 1 - Which of the following defines perquisite for distributing work to HR resources?

A - Assigned labor capacity to work center.

B - Assigned work center to internally processed activities.

C - Assigned work center to Company code.

D - All of the above

Q 2 - Up to 9999 can be created with reference to material requirement in Project System?

A - True

B - False

Q 3 - In SAP Project System, if you require more than 9999 components in one network then you
may use subnetworks?

A - True

B - False

Q 4 - Which of the following is correct about Network profiles in SAP system?


A - To maintain Network and WBS structure and to define rules for linking networks.

B - To determine whether settlement is required, allowed or blocked.

C - To maintain default values and control parameters like planning methods for costs.

D - All of the above

Q 5 - You should change the keys related to costing sheet or the results analysis key as these
can’t change existing system?

A - True

B - False

Q 6 - The information entered in project profile is copied to project in project definition or also in
the project elements and can be changed at later stage?

A - True

B - False

Q 7 - Which of the following is used to control that the project does not run over allocated
budget?

A - Using Availability Control by defining tolerance limits

B - Using Work Breakdown Structure

C - Using Cost element

D - All of the above

Q 8 - While defining a project profile in SAP system, which of the following is represented by
Proj.prof?

A - Category to which project belongs

B - How the project will be identified in project builder

C - Enter the unique ID that identifies project profile in SAP system

D - To summarize the master data in project

Q 9 - Where do you control the budget for the project in SAP PS system?

A - Project Profile

B - Settlement Profile

C - Cost Profile

D - Budget Profile
Q 10 - In PS system, you can use the settlement profile to define the following for actual costs?

A - Full Settlement

B - Can be settled

C - Not to be settled

D - All of the above

Q 11 - Which of the following Transaction Code is used to create Budget profile?

A - OPS9

B - OPSK

C - OPS3

D - OK02

Q 12 - Time period in which you want to control your project, and it will be displayed in your
planning board is known as?

A - Scheduling

B - Planning Period

C - Activation Period

D - All of these

Q 13 - In SAP system, performing self-defined checks for master data fields of the same elements
is called?

A - Substitution

B - Validation

C - Quality check

D - Monitor

ANSWER SHEET

Question Number Answer Key

1 B

2 A
3 A

4 A

5 B

6 A

7 A

8 C

9 D

10 D

11 A

12 B

13 B