SUMMARY REPORT OF SURVEY PROJECT DWDM

Site Name = …………………Ampelgading……………………………………………………………………………………….....

Address = ……………………………………………………………………………………………………………..

Area = ……………………………………………………………………………………………………………..

Long / Lat = ………………………………………………………………………………………………………........

EQUIPMENT ROOM

Floor Type Cement/ Antistatic = ………Cement…………………………………………………….......................

Floor Height (mm) = ………………………………………………………………….....................................

Room Height (mm) = …………4800………………………………………………………………….........................

Height of Cabinet to Roof (mm) = …………00……………………………………………...........................

Space for Equipment (AV / N/A) = …………AV……………………………………………..........................

Cabling Mode (UP / DOWN) = …………UP……………………………………………………………………….....

New Cable Tray Requirement, Length ............................. / width .......................... (mm)

BOQ Proposed Equipment OSN

Cabinet (pcs) = …………………0………

Subrack (pcs) = …………1……………..

Proposed Cabinet Tersedia / Tidak .................tersedia.......................

Posisi Proposed berada di ruangan apa ...........sentral.........................

Patchcord to OTB OSP (............20............ m/type ........LC-SC/LC-FC.................)

Patchcord to OTB Client (...........20.......... m/type .....LC-SC/LC-FC....................)

Patchcord to Other OSN DWDM (..................... m/type .........................)

Patchcord to T-Line (........10............. m/type .........LC-LC................)

Patchcord to T-Line (..................... m/type .........................)

Patchcord to T-Line (..................... m/type .........................)


RECTIFIER 1

Model of Rectifier

Brand = ………emerson……………………………, Type = ……………ps48300………………………………..

Qty of Module Slots = …………11……. Slot

Installed Module =………4……….. Pcs

Module Capacity = …………30……. A

Current Load = ………30………. A

BATTERY RECTIFIER 2

Model of Battery

Brand = ………zenetta……………………………, Type = ……………………………………………..

Capacity per Bank = ………200………………. (Ah)

Qty of Banks Installed = ……………1…………. (Banks)

RECTIFIER 2

Model of Rectifier

Brand = ………emerson……………………………, Type = …………ps48300…………………………………..

Qty of Module Slots = ……11…………. Slot

Installed Module =……………4….. Pcs

Module Capacity = ……30…………. A

Current Load = ………27………. A

BATTERY RECTIFIER 1

Model of Battery

Brand = ………Yuasa……………………………, Type = ………………CS500……………………………..

Capacity per Bank = ……500……………. (Ah)

Qty of Banks Installed = ……………1…………. (Banks)


NEW DCPDB JIKA DIPERLUKAN

Butuh Prop DCPDB ( Ya / Tidak )

Use Existing / New = …………existing……………......

Input MCB / FUSE = ……………………………..

Load Current DCPDB = …………………………

MCB / FUSE

Use Existing / New = …………new………………….

Type .................. / Capacity ……………......

Qty =………………………...............................

CABLING

Koneksi Power ( Rect-OSN / Rect-DCPDB-OSN / DCPDB-OSN )

Rectifier-OSN Panjang Cable (25mm) =………………………...……. m

Rectifier-DCPDB Panjang Cable (50mm/70mm) = ……………….......…… m

DCPDB-OSN Panjang Cable (25mm) = ……………15………………….. m

PGND Yellow/Green Panjang (16mm/25mm/35mm) = ………………………....... m

Source 1 dari Rectifier ...........................................


Source 2 dari Rectifier ...........................................

Butuh Cable Duct ( Ya / Tidak ) panjang .................. m


Butuh Cable Tray ( Ya / Tidak )
Type Tray Galvanized, Ladder, Wiremesh, Panjang ...................... m

Butuh Pleksibel Konduit ( Ya / Tidak ) ..................... m


Butuh Black Konduit untuk Outdoor ( Ya / Tidak ) ................ m

OTB Direction & Ports

Prop Uplink ke Site A Prop Uplink ke Site B Prop Uplink ke Site C

OTB OSP to ............................. OTB OSP to ............................. OTB OSP to .............................


Port ........................................ Port ........................................ Port ........................................

Prop Uplink ke Site D Prop Uplink ke Site E Prop Uplink ke Site F

OTB OSP to ............................. OTB OSP to ............................. OTB OSP to .............................


Port ........................................ Port ........................................ Port ........................................
Remarks

…………………………………………………………………………………………………………………………………………………....……

…………………………………………………………………………………………………………………………………………………….......

……………………………………………………………………………………………………………………………………………………...….

…………………………………………………………………………………………………………………………………………………..……..

………………………………………………………………………………………………………………………………………………...……….

…………………………………………………………………………………………………………………………………………………….……

…………………………………………………………………………………………………………………………………………………..……..

………………………………………………………………………………………………………………………………………………………….

……………………………………………………………………………………………………………………………………………………….…

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………………………….

You might also like