200 KN
1 38KN
162 KN
200 KN
38KN
2
162 KN
123KN
72 KN
142 KN
GAS TRAIN AREA NEW INPUT
224 KN
36KN
183KN
224 KN
36KN
183KN
123KN
72 KN
160KN
OBSERVATIONS
Numbers of Platform
increased, earlier platform
was between GL. C10 TO C12,
Now it is between C8 TO C11,
C17,C18,C19,C21,C22,C23
**conclusion: Redesign
required to ensure strength
& serviceability of
foundation and super
structure. anchor bolts and
base plate needs to check
again WRT updated section.
future space location changed
and splitted , hance loading
pattern has changed.
**conclusion: Redesign
required to ensure strength
& serviceability of
foundation and super
structure. anchor bolts and
base plate needs to check
again WRT updated section.
**conclusion: Redesign
required to ensure strength
& serviceability of
foundation and super
structure. anchor bolts and
base plate needs to check
again WRT updated section.