Professional Documents
Culture Documents
LEGEND : -
PROPOSED CENTRE LINE :
PROPOSED CARRIAGEWAY LINE :
PROPOSED MEDIAN :
PROPOSED PAVED SHOULDER LINE :
PROPOSED EARTHEN SHOULDER LINE :
PROPOSED ROW LINE : PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROPOSED DRAIN :
PROPOSED RETAINING WALL :
PROPOSED RE WALL :
DESIGN CHAINAGE : 0+000
G=
0.9
4/3
Structure No.:-
Type:- Culvert
m (single cell)
Span:- 3.0X3.0
sign Ch :- 3+ 763
De
w construction
Imp. Prop:- Ne
TS: 3+679.49
Structure No.:- 4/1 Structure No.:- 4/2
Structure No.:- 3/3 Type:- Culvert Type:- Integral Slab (LVOP)
Type:- Culvert Span:- 3.0X2.0 m (single cell) Span:- 2X16.0 m
3+750
3+700
cell)
Span:- 3.0X3.0 m (single Design Ch:-3+060 Design Ch:- 3+337
3+650
3+600
Design Ch:- 2+840 Imp. Prop:- New construct
ion Imp. Prop:- New construction
3+550
3+500
TB
3+450
ion
Imp. Prop:- New construct
PROW
PROW
3+400
M9
PROW
PROW
PROW
PROW
3+350
PROW
PROW
PROW
PROW PROW
PROW
3+300
PROW PROW
PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW
3+250
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW
TB
PROW PROW PROW
PROW PROW
3+200
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
3+150
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW
M8
PROW PROW PROW
PROW PROW
3+100
PROW PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
3+050
PROW PROW PROW
PROW PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW PROW
3+000
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
2+950
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
2+900
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
2+850 PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
2+800
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
2+750
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
2+700
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW
G=
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW
1.1
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW
G=
PROW PROW
PROW PROW
PROW PROW
PROW
G=
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
0. 8
PROW PROW
PROW
G=
PROW PROW
PROW PROW
0.9
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW
0.9
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
PROW PROW
D
C
Type:- LVOP
100.00M
BVCE: 89.94
BVCS: 3+499.56
EVCS: 3+689.56
EVCE: 92.79
Span(m):- 3.0x2.0 (single cell)
98.00M
Span(m):- 3.0x3.0 (single cell)
96.00M
Type:- Box Culvert
Level
Level
94.00M
92.00M
BVCS: 3+038.76
BVCE: 88.80
EVCS: 3+188.76
EVCE: 88.38
90.00M
0.50%
84.00M
Datum = 82.00M
91.941
91.731
91.521
89.101
88.891
88.521
88.391
88.441
88.491
88.541
88.591
88.641
88.691
88.741
88.791
88.841
88.891
88.941
88.991
89.041
89.091
89.141
89.191
89.241
89.291
89.341
89.391
89.441
89.491
89.541
89.591
89.641
89.691
89.741
89.791
89.841
89.891
89.941
92.362
92.152
89.732
89.522
89.312
88.312
90.552
90.682
90.822
90.972
91.882
92.467
92.257
92.046
91.836
91.626
91.415
91.310
91.205
91.100
90.995
90.889
90.784
90.679
90.574
90.469
90.364
90.258
90.153
90.048
89.943
89.838
89.627
89.417
89.207
88.996
88.786
88.687
88.599
88.453
88.396
88.349
88.286
88.270
88.264
88.269
88.284
88.309
88.345
89.997
90.063
90.140
90.227
90.325
90.433
91.133
91.305
91.487
91.679
92.096
92.320
92.555
92.800
93.050
Proposed Levels
90.191
88.151
87.691
87.571
87.681
93.171
95.141
95.701
96.401
95.341
95.441
96.231
89.879
89.885
90.038
90.344
89.898
89.214
88.812
88.539
88.144
88.084
88.113
88.162
88.204
87.592
87.495
87.380
87.380
87.380
87.380
87.380
87.380
87.380
87.380
87.380
87.738
88.137
87.422
87.356
87.339
87.265
87.355
87.289
87.775
88.750
89.297
89.027
89.073
89.287
89.308
89.046
89.332
89.573
89.755
89.938
90.123
90.307
90.645
91.009
91.373
91.734
94.394
94.818
96.054
95.153
97.069
95.690
95.637
96.186
96.574
96.925
96.636
96.340
96.320
96.329
96.357
96.312
96.270
96.349
96.537
96.585
96.670
95.995
95.310
95.290
95.454
95.440
95.313
95.763
95.767
95.508
95.705
96.380
96.476
96.275
96.017
96.280
96.307
94.415
94.557
94.210
Existing Levels
R =9666.053 R =9500.000
G =0.500%
Vertical Geometry K =96.661
L =310.795
K =95.000
L =150.000 L =190.000
-2.500%
-2.500%
-2.500%
0.000%
Superelevation
2+690
2+700
2+710
2+720
2+730
2+740
2+750
2+760
2+770
2+780
2+790
2+800
2+810
2+820
2+830
2+840
2+850
2+860
2+870
2+880
2+890
2+900
2+910
2+920
2+930
2+940
2+950
2+960
2+970
2+980
2+990
3+000
3+010
3+020
3+030
3+040
3+050
3+060
3+070
3+080
3+090
3+100
3+110
3+120
3+130
3+140
3+150
3+160
3+170
3+180
3+190
3+200
3+210
3+220
3+230
3+240
3+250
3+260
3+270
3+280
3+290
3+300
3+310
3+320
3+330
3+340
3+350
3+360
3+370
3+380
3+390
3+400
3+410
3+420
3+430
3+440
3+450
3+460
3+470
3+480
3+490
3+500
3+510
3+520
3+530
3+540
3+550
3+560
3+570
3+580
3+590
3+600
3+610
3+620
3+630
3+640
3+650
3+660
3+670
3+680
3+690
3+700
Chainage
TITLE :
PLAN & PROFILE DWG. NO. CET/2016/3903/NH- 60 /FDPR/PP
GOVERNMENT OF WEST BENGAL OFFICE OF THE SUPERINTENDING ENGINEER NH PLANNING &
HOR- 2000 DESIGN CIRCLE PUBLIC WORKS (ROADS) DIRECTORATE KHADYA BHAWAN ,BLOCK-A, 1ST FLOOR, CH. 2+700 KM TO CH. 3+700 KM CE TESTING COMPANY PVT. LTD. REVISION MKD. - R0 SHEET NO. - 04
VER- 2000 11A MIRZA GHALIB STREET, KOL - 700087
124-A, N.S.C. BOSE ROAD DRAWN BY. DESIGN BY. CHECKED BY. APPROVED BY.
SUBMISSION TYPE:
MKD. DATE DESCRIPTION CHKD. APPRD. PROJECT REPORT FOR RANIGANJ BYPASS ON NH-60 KOLKATA - 700092.
IN THE DISTRICT OF BURDWAN , WEST BENGAL FINAL DETAILED PROJECT REPORT
REVISIONS JAN, 2023 S.K.BISWAS D. PRAMANIK B.DAS A.NAYAK