Project Location:
705731150.doc
1 Saudi Aramco Work Permit For Compressor
2 High Temperature Shutoff Device Or
3 Air Compressor Properly Positioned To Avoid Entry Of Contaminated Air Into Air Intake System
4 High Temperature Alarm
5 Carbon Monoxide (CO) Monitor & Alarm
6 Carbon Monoxide Monitor Located Downstream From Air Filter
7 Carbon Monoxide Monitor Located On Bleed Stream From Compressor With Minimum Flow Of Air
8 Carbon Monoxide Alarm Calibrated To 10 ppm
9 In-Line Air Filter In Place (Required For Oil-Lubricated Air Compressors Providing Respirable Breathing
Air)
10 Air Filter Changed At Least Annually & Documented
Part 3 - Abrasive Blast Cleaning Air Compressor( Continued)
11 Water Drain Petcock Valve (Located On Bottom Of Filter Housing) Working Properly
12 Other PPE As Needed For Work Being Performed
13 Grade “D” Quality Breathing Air Tested At Least Every 6 Months By Certified 3 rd Party
14 Copy Of Breathing Air Certificate On Site
15 Up-To-Date Air Compressor Maintenance Logs
16 Spark Arrestor Working Properly
17 Air Manifold Pressure Gauge In Good Working Condition
18 Air Compressor Emergency Kill Switch Properly Identified
19 Documented Training On Location & Function Of Air Compressor Emergency Shut-off Switch
20 Air Receiver Tank Pressure Tested And Certified Within Five (5) Years.
705731150.doc
Part 5 - Other
# Item YES NO NA
1 Saudi Aramco Work Permit For Abrasive Blasting Work
2 Proper Barricades Around Work Area
3 Proper Warning Signs Or Lookouts Posted
4 Abrasive Blasting Dust Properly Contained
5 Approved Temporary Lighting
6 Periodic Gas Testing
7 Periodic Oxygen Testing
8 Other Surfaces &/Or Equipment Properly Protected From Damage
9 Only Wire Rope Used Near Blasting Operations
10 All Safety Relief Valves On Pressure Equipment Tested And Documented Daily
11 All Pressure Gauges Working Properly
12 Other
705731150.doc