You are on page 1of 23

PROFESSIONAL PRACTICE 2 struggled for the passage of an

Engineers and Architects Law. In


Unwritten History of Filipino 1921, the Philippine National
Architects Assembly Act No. 2985 passed, the
Part One first enabling law for the practice of
the professions of engineering and
“Divided We Unite” architecture, defined the unique and
separate identities of the two
professions.
History of the United Architects of The profession of Architecture
the Philippines in the Philippines was given its first
separate statute on June 17, 1950
During the Spanish era there
with the enactment of Republic Act
were no schools of Architecture in the
545, “An Act to Regulate the
Philippines. The first Filipino recorded Practice of Architecture in the
architect was Felix Roxas y Arroyo, Philippines.”
born circa 1820 in Manila, studied in From the early 1930’s to late 1950’s,
Spain and stayed for many years in
associations of architects were
England and France. Previous to this,
founded, but only three survived until
a Filipino could aspire to erect an the early 1970’s–the Association of
architectural structure through the Philippine Government
help of a Maestro de Obras or
Architects (APGA), League of
master builder. The first formal
Philippine Architects (LPA), and
school for master builders was the Philippine Institute of
opened only during the last decade of Architects (PIA).
the 19th century. On 14 September In June 1973, President
1902, many of the graduates of this
Ferdinand E. Marcos issued
school joined the civil engineers and
Presidential Decree 223, creating the
surveyors in the country and founded Professional Regulation Commission
the first professional organization of (PRC) regulating all professions and
architects and allied professionals– accrediting only one organization to
the Academia de Arquitectura y
represent each profession.
Aguimensura de Filipinos (AAAF). It
The newly integrated
maintained direct consultation with organization of architects was called
the American Institute of Architects the United Architects of the
(AIA). A year after, its name was
Philippines (UAP). All 1300 members
changed to Academia de Inginieria,
of the three organizations
Arquitectura y Agrimensura de automatically became members of
Filipinas (AIAAF). In 1904 it founded the UAP and during its first year, 700
the first school of Architecture in the members officially registered for
Philippines, the Escuela de
active membership.
Ingenieria y Arquitectura, which
The United Architects of the
offered five-year courses in Philippines (UAP) was born on
Architecture and Civil Engineering.
December 12, 1974 out of the noble
In 1911, the AIAAF was dissolved vision of unifying the three (3) existing
when the civil engineers withdrew to
architectural associations at that
form their own professional
time – the Philippine Institute of
organization, but not before it has Architects (PIA), the League of
Philippine Architects (LPA) and Architects (IAPOA). The new law
the Association of Philippine granted Filipino architects more
Government definitive rights, benefits and
Architects (APGA). Through the distinction as against other
concerted efforts of the officers and professionals in the construction
members of the three organizations, industry.
the vision officially materialized on Since its registration, UAP has
March 26, 1975, where the UAP was received many awards, including the
registered with the Philippines’ highly-acclaimed PRC’s Most
Securities and Exchange Commission Outstanding Accredited Professional
(SEC). On May 12, 1975, the UAP was Organization. To date, it is still the
granted Certificate No. 001, the first first and only APO to win the award
professional organization to be four times in the Award’s eighteen-
accredited by the Professional year history. These were in years 2002,
Regulation Commission (PRC). The 2007 and 2008 and this year 2011.
PRC is the central agency of the The award is presented annually to
Philippine Government charged with recognize the achievements, services
the licensing and regulation of and commitments of the APO to the
professionals and the professions, as profession. UAP bested forty two (42)
well as the Accredited Professional other professional organizations,
Organizations (APOs). through 12 stringent criteria set for
On March 26, 1975, the UAP the award.
was registered with the Securities and For its volunteer works, UAP
Exchange Commission and on May 12, was chosen in addressing housing
1975, the PRC issued Certificate No. problems, urban degradation,
001 to the UAP as the duly accredited environmental conservation, and
professional organization of promotion of volunteerism for socio-
architects in the Philippines. The economic development; the UAP was
organization has been participating in a Regional Nominee to the “Search
the activities of local government for Outstanding Volunteers” by the
units, in civic and in related Philippine National Service
professional fields. The UAP received Coordinating Agency (PNVSCA) in its
many professional awards including celebration of National Volunteer
the highly acclaimed Excellence Month last December 2005. PNVSCA
Award given by the Government of the takes the lead in advocating and
Republic of the Philippines and the recognizing the contributions of
Most Outstanding Professional volunteers to nation-building and
Organization of the Year awarded by international cooperation.
the PRC in 2002. Last April 2009, in celebration
The UAP has been of the Earth Day, the UAP, through its
instrumental in the passing advocacy group “Green Architecture
of Republic Act 9266: The Movement”, was awarded the 2009
Architect’s Law of 2004, effective Father Neri Satur Award for
April 26, 2004. On June 22, 2004, the Environmental Heroism – the only
PRC, through its Board of accredited professional organization
Architecture, accredited the UAP as in the Philippines to receive such a
the Integrated and Accredited prestigious environmental award.
Professional Organization of
Last November 2010, UAP paraang may theory compared
received its First International Award sa others na parang inaadopt
– in Adelaide, Australia, the EAROPH lang yung sa nakikita.
50th Golden Jubilee Award in
recognition of the organization’s • 16th century - mas nandodoon
substantial contribution to the na yung consideration na hindi
advancement of Planning, lamang makapagpatayo ng
Development and Management of malalaking building,
Human Settlements in the Philippines.
• Britain - RIBA (Royal Institure
of British Architects) yung
1902 Academia de Architektura malalaking projects yung mga
land owners bale sila yung
May sinabi tungkol sa ating mayayaman sila yung
profession na ang architecture ay naghahanap ng mga architects.
self-governing profession na Dito sila nag umpisa yung
nangangailangan ng standard. Kaya Architect na term 1563 in
nagkaroon ng limitation gaya noong English Oxford Dictionary. First
Gothic walang nabanggit na archi english man na tinawag na
yung magagaling na Mason ay sila architect ay si John Shute mga
yung gumawa ng mga churches. Ano duke ang client nya.
ba yung hinahanap na specialization?
Ano ba ang standard sa profession? • Government bodies ng
Habang lumalaki yung project architecture pagdating sa pag
nagkakakroon ng need para yung mga establish ng group may
mason, painters paano ika qualify as advantage kasi kapag
architect? individual ay di papakinggan

• Phulidert - created guidelines The establishment of architects’


and workmanship sa kung ano governing bodies and institutes in
bang gagagwin ng isang other countries is outlined below:
arkiteko.
• Palladio - siya yung naging Ireland: 1893 - Royal Institute of
standard ng practice Architects of Ireland

• Si Andrea Palladio yung Holland: 1842 - Royal Institute of


nagpapractice ng sa architect Dutch Architects (BNA)
bale siya ang naging standard.
Because of his USA: 1857 - American Institute
experimentation and his used of Architects (AIA)
of materials based on the -American Institute of Architects
needs of his individual client. need magbayad ng membership in
Ginamit nya kung ano yung dollar nasa around 6000+ kapag naka
mas tama. Variety of design, full ang kanyang halaga ay 10K-11K it
variety of materials. Tried to is annual membership.
harmonize the design through
its culture and location of the Poland: 1877 - reformed in 1899 -
structures. Pinagisipan nya sa Union of Polish Architects (SARP)
Government of India under the
Denmark: 1879 - The Architects’ provisions of the Architects (1972)
Association of Denmark
Egypt: 1917 - Society of
Japan: 1887 - The Japan Institute of EgyptianArchitects (SEA)
Architects (Zouka Gakkai)
Malaysia: 1920 - Malaysian Institute
Romania: 1891 - Union of Architect of of Architects (PAM)
Romania (UAR)
Brazil: Institute of Architects of Brazil
South Africa: 1899 & later 1927 (IAB)
National institutes merged in 1996 -
The South African Institute of Australia: 1930 - The Australian
Architects (SAIA) Institute of Architects

Philippines: 1902 - United Architects Spain: 1931 - Superior Council of


of the Philippines (UAP) Colleges of Architects of Spain
-UAP - awarded ng PRC para sa ating (CASCAE)
professional org
Lebanon: 1934 - Order of Architects
Germany: 1903 - Association of and Engineers (OEA)
German Architects BDA
France: 1940 - Validated in 1945 - Ile-
de-France Association of Architects,
New Zealand: 1905 - The New currently regulated under 1948 -
Zealand Institute of architects. 1963 - International Union of Architects and
Reformed under the Architects Act regionally governed under 1977 -
1963 which split its previous Ordre Des Architectes
functions in two. The New Zealand
Institute of Architects became the China: 1953 - Architectural Society of
professional organization for China
Architects, and the regulatory
functions transferred to the Hong Kong: 1956 - The Hong Kong
Architects Education and Registration Institute of Architects
Board (AERB), now the New Zealand
Registered Architects Board

Canada: 1907 - The Royal


Architectural Institute of Canada

Uruguay - Formed 1914, legal status


granted in 1921 - The Society of
Architects of Uruguay (SAU) Sri Lanka: 1957 - Sri Lanka Institute of
Architects
India: 1817 - The Indian Institute of
Architects (the regulating body for Fiji: 1957 - Fiji Association of
architecture in India is the Council of Architects
Architecture, constituted by the
Nigeria: 1960 - The Nigeria Institute of nyo. Example: Projects ay housing
Architects (NIA) projects bale yun ang pinasok nya,
may interview. Specialization na
Singapore: 1961 - Singapore Institute kailangan icontribute sa organization.
of Architects May privileges like parang nasa
priority lane.
Republic of Korea: 1965 - Korea
Institute of Registered Architects Education:
(KIRA) Schools of Architecture

Argentina: 1969 - reformed in 1988 - The first major academic institutes for
Argentina Federation of Organizations architecture as a profession are listed
of Architects (FADEA) below:

Bangladesh: 1972 - Institute of France: Founded in 1671, made


Architects Bangladesh independent by Napoléon III 1863 -
The École des Beaux Arts
Pakistan: 1975 - The Institute of
Architects, Pakistan (IAP) Austria: 1772 - Academy fine arts,
Vienna - Institute for Art and
Belgium: 1977 - Conseil national de Architecture
l’ordre des architects
Germany: 1832 - Building Academy
Trinidad and Tobago: Established (Bauəkademie)
1988, given legal governance in 1992
- Institute of Architects of Trinidad USA: 1868 - MIT School of
and Tobago (TTIA) Architecture and Planning

Luxemburg: 1989 - Order of UK: 1889 - The Architectural


Architects and Engineers (OAI) Association (AA) offered the first full
time course in Architecture, however
Czech Republic: 1992 - Czech the first Degree in Architecture was
Chamber of Architects offered by The Cambridge School of
Architecture in 1912
Russia: 1992 - Union of Architects of
Russia (UAR) NOTES:

While current EU regulations and Formal education: Nagsimula sa


various international agreements, France
there are now also many other
“umbrella” organizations that The École des Beaux Arts - Standard
interlink architects’ bodies and curriculum
CHED ang nag set ng Standard and
NOTES: curriculum sa Pilipinas.
To improve the style of architecture
Kapag ASEAN maraming process and have a style identity and better
kailangang may specific na mga education sagustong magstudy
profect kung baga ay specialization magkaroon ng higher standard.
Inaalam kung ano ang dapat ituro iinterpret ng mga Ar (magiging
yung nagiging courses na nitetake ay realistic)
kasama sa board exam.
Our service is not just for the design
Sa mga accrediatation need na or regular service kung baga ang
makapasa sa standard ng curriculum ginagawa natin ay tinatarget natin
na meron sila. kung paano mabibigyan ng maayos
na structure si Client
Pagdating sa ating practice meron
tayo dito sa Pilipinas na ginagawa Process ng translating abstract falls
para mas maenhance yung practice under sa pre design services SPP Doc
natin. Di ibig sabihin na graduate ka 01, eto yung inoofer. Walang working
na ay archi ka na. Nagkaroon tayo ng drawing but this is very important
registration para mas macontrol yung para malaman na feasible, yung di
nagpapractice ng profession. Para ganung magagastusan si client lalo
maiwasan yung nagiging problema. na kung malakihan Example
government, nagpapagawa ng
Architect ay legit licensed ay feasibility study para
pwedeng iconfirm dito makapagpagawa ng structure o
makahingi ng pondo. Market study -
Yung PCR No ay naka reserve sa isang market ability ng mga project
tao lang at hindi na mauulit. Kahit example sa business proposal
may crime or deceased ay nandun pa mahalaga sa mga client
rin.

Anong nangyari sa House Bill: wala Complete and detailed docu -


pang balita, pahinga pa di pa siya ulit
gumagalaw. Huling presentation ay Regular design Services SPP Doc. 02,
nagkaroon na nang consultation with const and erection Project Docu,
UAP para sa batas natin na yun. Si Sche Phase, Design Dev Phase,
UAP ay willing magprovide ng inputs Contract, Bidding, Const Phase. Work
regarding the proposed bill. - up to des dev
:Gusto nang maging formal yung
pagfafile ng complain. Regarding sa Specification writing - going to write
code of ethics mga malpractice ng delivery ng mats, pinakamatagal or
ganern main job ng ar na nagooffer ng regular
architectural services
Virtues of an Architect
Post management services - mga ar
Spectrum of an Ar’s Services na nagooffer or nagiging employed,
nakatayo na bldg pero
Conceived- pumasok/nabuo sa isipan nangangailangan ng namamahala if
ng ating client maayos ang pagcoconstruct ng
structure, in house Ar. Para
Conceived, perfected, transformed - magkaroon ng post const evaluation
dito na magistart yung work ng Ar kasi if the initial plan for the bldg is in
yung iniimagine ng client ay keri nang conformity of the actual performance,
dun sa expectation sa kanya. SPP manager must report directly to the
Doc. 205 client, the const supervisor need to
report to the const manager? Wala pa
Ar is the one who translates or nag silang civil liab unless sila yung
iinterpret the idea, the concept, the magsasign na Ar in charge of const.
dreams of the client to make it into The responsibility ay kay client at Ar
reality kasi dapat in accordance sa design
yung const.

Pre design - site ana, space prog Post-Const Services


-compensated separately, minsan
Reg Des - part ng const drawing na ang compe ay percentage ng rental to
ginagawa sa BT make sure the bldg esp yung rental
spaces ay puno or masasabing full
Spe Ar Services - like Ar interior, yung function nya, but yung iba ay
ligthing, landscape, comprehensive salary or monthly basis kung maunti
planning services, compre dev plan, or dumami yung kanilang
site planning occupants/nagrerent sa bldg naka fix
-Ar can offer but with the help of an pa rin yung compe
allied prof
Comprehensive Ar Serv
Const Services -Team or ar/firm na pwedeng gumawa
Full-Time Const Supervision Services ng pre-design hanggang post-const
Const Management Ser Qs: pwede bang mag isa lang? Can I
offer that services ng walang kahelp?:
Offers if the owner needs help ng Ar, 8 Mahihirapan kasi ikaw gagawa ng
hr monitoring of the const. Since it is feasibilit, working drawing, inspection,
diff from our regular services (through inilaan mo sarili mo para sa client na
the degree of complexity of the proj) If yun. Nandun ka from the start
the owner required the Ar to do the hanggang dulo.
full time management of the -Ano bang tawag?: Project Manager -
proj/const the Ar must be paid kapag ganto ka ay ikaw naman ay
separately from its design services. If pinagkatiwalaan ng client at
s/he wants a detailed design sa magooversee ng lahat, ikaw bahalang
interior ay diff case bale dapat ay kumuha ng team para sa pre-design,
mapaid separately. If full time service ikaw mag gagawa ng time frame at
ay dapat whole day sa site si Ar. proj cost. Sche to Cons Management.
Project cost ay sa feasibility??
Const Management Services
-dito babad at maayos dapat Design-Build Services
materials, if the const manager ay -diff from contracting docu, ikaw
dapat magreport sa client at dapat designer at const manage const. If
kasundo ni Ar. If ever the Ar will be the you are going to be involved sa const
const manager ay mas matagal kasi ay hindi by contract, kapag naka
Ar needs to greate the chart, critical contract yung kikitaain ay yung
thought method or CPM, need estimate mo dun ang gastos, di na
imonitor yun. Sa isang const services magsasauli sa client if may sobra
halimbawa malaki ang proj, the const
-dapat magaling sa estimate kasi Design - Ar and Engr- design concept
kapag nagkamali ay gagastos ka pa may kinalaman ang space and
rin para lang matapos ang trabaho function, stability, environment, and
-85% yung estimate accuracy ng Ar aesthetic.
kasi di natin hawak ang supplier, -Aask natin ang basic needs nila
manufacturer, yung tao (labor cost), tapos propose ng possible spaces
and equipment that can be added in connection sa
kanyang purpose, the cost of budget
If design build on guarantee design -paano idedeliver and project Ar to
fall - similar sa method ng delivery contractor
difference if the contractor give Delivery - Contractor - may 3M, men,
theestimated or contract price. Yung materials, and machinery sila yung
total exp ng client ay yun na nagpoprovide nun

By admin - kung ano yung magiging If complex ang project need na ng


gastos sa mga labor ang bahala ay assistance
client, sasabihin ni Ar yung mga
monthly expenses tapos sila na Full time
bahala dun sa mats, si Ar ay depende -oobserve/titingnan if nadedeliver ng
sa arrangement dun sa expenses ng contractor ng design concept ng ar at
month na yun engr
Management fee - magkano yung
expenses ay yun ang compensation Const Manager
-nagpapatipid ng const cost
Ar Design Compe -nagrerequest kay client na
-advantage for the beginners at wala magkaroon ng full time supervisor
pang ganung pangalan, paano ba -perf eval/crtical path method (CPM)
magiging process sa design compe -pwedeng offeran ng incentives yung
like Zaha Hadid para mas makilala const manager ay mas magiging
sila inspired sa pagtatrabaho

Professional Architectural Consulting Proj Manager


Services -pwedeng yung involve na nung
-if nagprovide ng insight or possible pauna
sol’n unlike sa mga doctor/lawyer na -full time control sa project
willing to pay sila for PF. Pero kapag -gaano katagal at budget
Ar ay ayun tamang hingi lang ng
insight. The Value of the Architect
UAP: If hihingi ng advice ay may
compensation nasa SPP din Kasi nga kanina between abstract and
physical world stands Ar - what would
be the possible prob? - eto iniisip ni
Const Services client, di lang natin tinitingnan lang
ang prob but pati kung ano ang
3D Wheel of Architects maeencounter during the delivery
Decision - Owner siya proponent; mula simula hanggang const.
anong purpose?; size, budget, and Halimbawa: malayo sa site yung
location ganito kaya mas mapapamahal,
paano makakaattract ng customer PEO
like anong dapat maging approach sa -pare-parehas sa mga school
proj na yun kung baga ay aware tayo binabago lang terms
kung ano yung pros and cons. Wala
pa yung prob ay nag iisip na ng sol’n.
Don’t apply as junior architect kasi di
Kaya gumagawa ng mga scale model- pa ar if fresh grad; Dapat ay junior
saan pupwesto, saan yung tao. How designer, or apprentice
the ppl will socialize; paano
magwowork? How ppl will live in Allied Fields
consonance malaki ang sakop ng -yung sa RA 9266
ating kinoconsider. We dictate on
how ppl work, gather, etc. Inuustusan
ang user sa relationship ng spaces in
which we provide sa plans. Hospitals Curriculum is diff from other univ
di tayo nakakapasok sa mga limited UB Design 1: 2 units 1hr lecture, 3hrs
areas yung nakakapasok lang ay yung studio - 4hrs
mga involved. BSU: 2 hrs lec, 3hrs studio -5hrs
PWEDE MAGDAGDAG BAWAL
Objective - yung sa mga design dun MABAWASAN
nagiging mahalaga yung mga
Architects

Topic 2:
The Education of Architects

Basis of our curriculum


CMO No. 61 Series of 2017
Accordance of RA No. 7722, Higher
Education Act of 1994

Eto yung nagiging guideline Policies,


Standards, and Guidelines (PSG) Dean
-Dapat Ar at nag Ph.D., 10 yrs exp prof
UP prac with atleast 2 years ng teaching
-di nasunod sa curriculum
-ancient, western, asian, filipino
architecture sa actual
-intro, fil archi, general na tapos asian Qualified member ng PRC/ pasado ng
sa UP exam

Sec 5.
Sa degree
-degree program tayo OLD CMO

-Dito nikuha si CMO 61 s, 2017 kasi


nagka k-to-12
-May mga naalis na subjects dahil
nagka k-to-12 like analytic geom, p6 2 RA 9266 - Mentioned master degree
-nandito rin yung ginagamit nilang credited as 1 year na diversified
program per course kung anong topic experience, yung number counted sa
yung ididiscuss pati yung courses 2 years talaga yung sa 2840,

Website ni UAP because of CPD law


In terms of curriculum nakabase tayo though di siya requirement yung sa
sa CHED maachieve dapat ang min card basta required na siya kasi
requirement. Bilang students narepel.
makikita sa program ay may mga
other activities or co-curricular act, UAP - may commission na
sa mga student org para mas professional dev committee
maexpand yung area. Mas naghahandle ng mga webinars mga
napapalawak yung communication national conference and conventions.
skills, yung personality development.
Regarding the quality ang habol kasi Pagtagal ng time, pagtaas ng unit
ngayo n ay outcome based educ (OBE) 3 hours= 1 unit
50% lang manggagaling sa exam, mga 7hrs = 5 units
perf task ay mas natututo tayo. Mas
naeevaluate yung camaraderie, mas Di lahat ng seminars ay CPD points
nakakapagcoorporate at di nagsosolo.
Mayfifillupan tapos sasubmit sa PRC
With regards to masteral= pwedeng (mga attendance)
mag masteral kahit di pa Ar. May mga
professional certifications sa other CPD Providers - UAP, Inc and other
univs. Pwedeng magtake ng ladderize CPD Providers
program na kukunin lang ay diploma.
Academic units- academically Certificate pwedeng ibigay sa
completed, you can take the students pero di siya counted or di
comprehensive exam yung iba wala pwedeng i-carry over sa future kasi
nang exam like sa UP. If nag thesis ay may mga PRC No.
may master’s degree na if hindi
nagthesis ay may diploma basta 45 points ang dapat makuha or
academically complete. maearn sa CPD points kapag
international may +1 attendance pa
lang 1 point na

Yes pwedeng diff mentors kasi sa DT Matrix of Continuing Professional


form 2 pwedeng 2, 3-4 Development Act of 2016 -
TIP: kapag nagaapprentice ay bumili nakaindicate dito kung papapaano
na agad ng notebook mag apply
Dapat si mentor ay updated ang mga 1. Formal learning - refers to
PRC dapat di pa expired para di educational arrangements such as
magkaprob yung apprentice. curricular quali and teaching that
takes place in higher educational
institutions such as mga Master’s,
September 15, 2022 Doctoral, Post-Grad
Diploma/Cert/Diplomate/Fellowship
Prog

Halimbawa architect na tapos


masteral pwede nang magrenew kahit
di naattend ng webinar basta may
mga certs/diploma na

Example: 3hrs ka nagtalk * 1.5 yun


Bale: talk * 1.5

2. Non-formal learning

3. Informal learning

Kukuhanin na speaker ay CPD


provider need mag apply as applicant
nakalagay new/renew

Maganda if mga accredited ay mga


engineer din at hindi puro sa design
lang
environment natin and the life and
habitat
-Maraming development pero di natin
nakikita yung natural, marami na
tayong namimiss.
-If may project make sure na
CODE OF ETHICS (TOPIC 3) macoconsider ang future ng mundo
-Mababasa sa Publicatons sa site ng and not just sa present time.Be
UAP mindful sa effects mga natural
-Ipapabasa muna sa 08 huwag na impact sa susunod na generation.
yung Architects CREDO - recit ata,
situation tapos saan siya papasok like 3.2 - promote interest of his
mg relation to client, contractor, or professional org - community service
niviolate kung saan at bakit wala. pagioging part ng community
development; free service more on sa
No need to memorize dapat services para aware ang public sa
sinasabuhay. kung ano ba ang kayang gawin ng
architects. Sa Japan trusted ang
https://united- architects, sa community projects
architects.org/publications/code-of- mas nakikipag tie up sila para mas
ethics/ makilala, sa halip na donation in
terms of cash ang nidodonate ay
Di agad mawawalan ng license, it will talent and expertise kung paano
have a process. Magkakaroon ng magiging maayos yung community
investigation, need ng witness tapos project. Not to promote architecture
if proven ay tsaka lang dadalhin sa but to promote the organization. Di
board tapos iinvestigate ni PRC. madadsmot ang mga arkitekto, may
mga seminars na may idea or pinag
Article 1. GEN PROV aralan, public speaking ay pwede ka
Section 1. Traits of Architects- mag seminar kasi gusto mong turuan.
Highest integrity, responsiveness, Para sa ikakaunlad ng community.
business acumen, sensibility, artistic
and technical ability 3.3- buong process ng pag gawa ng
Section 2. Duties and Responsibilities structure ay dapat nasunod sa mga
- moral responsibilities to his/her rules and regulation ng government
professional associates. Lahat ng para hindi mag cause ng harm in the
nasasakupan ay dapat nirerespect future

ARTICLE 2: Relation to the People 3.4 - pwedeng tumanggap ng bayad


Section 3: Rs with the Public sa pagiging speaker, pagcoconduct
ng mga webinars, or pagsusulat ng
3.1- help conserve the systems of libro/arcticles
values and the natural, historic, and billboard - not to advertise but for
cultural heritage of the community. public information
Masdan mo ang kapaligiran - We have Paid advertisement is kukuha ng air
to preserve and conserve di lang time or papapublish sa dyaryo para
values, etc pati na rin ang natural ipasok ang iyong firm and pangalan
like politics. Sa pagsusulat ng books,
etc not just featuring yourself but also
sa sinulat mo. Unethical ay bumayad 3.7 - modest manner, sa labas ng
ka para ma feature ang sarili mo. office pagsasama ng exhibit. Sa mga
Nagbayad para makilala ganung exhibit ay mga gawa talaga ng
arki at hindi bara-bara lang. You want
3.5 - kadugtong ng 3.4 shall not solicit to inform the public what are the
sa mga ads. Halimbawa si Levi at possible project na itatayo sa site na
Felix nag endorse ng product na yun. Maanticipate na nila kung anong
inodoro, binayaran para iendorse ang mangyayari, example: traffic. Di dapat
isang wc, nandun yung picture nila mas malaki yung name at mukha mo.
HAHAHAHAHA di sila nagbayad pero
sila yung binayaran, comfy daw, si Article 3. Client
bathtub comfy din HAHAHAHAH Section 4- Rs with the client -
Binayadan. Purpose ang ipakita ang dependent upon good faith,
profession ng arkitekto.Pwede mag pagtitiwala lang sa isa’t-isa. May
recommend kung anong mga pang wc moral obligation tayo sa ating mga
ganern basta di paid ads. client and sa ating sarili. To protect
the client’s interest but never as the
3.6 - huwag magkeclaim na may alam expense ng public interest and public
sa ganun, like sa plumbing. Bagong welfare. RA 9266, tayo ay dapat may
pasa sa board exam, how to market service agreement. Kapag nangako
yourself? Calling card pwede bang ay oks na, which is ekis kasi wala
ilagay na may masters degree ka na? kang protection regarding that. Kasi
If nauna kang mag masters degree wala kang habol kapag di nagbayad
bago mag exam all goods but if bago sayo.
kang archi tapos may friend ka sa
restoration. If may proj ka sa 4.1. prospective Client - without the
restoration ay kuhanin natin tapos agreement/service agreement
nilagay mo sa calling card na ganun. mahihirapan archi sumingil. Do not
Kapag kasama sa team ay pwedeng believe in the agreement by mouths
ilagay sa calling card at di mo sila always with papers para di ka
nidedecieve, kasamahan/kapatid ang maagrabyado and for legitimate
kanilang service/field of work ay compensation. New archi, bagong
tungkol sa ganung project ay pwede pasa ng exam ay may limited to the
mo siyang iclaim kasi supported kayo presentation of examples ay sa
sa professional; resources available apprenticeship makukuha. Huwag
tom you. Kahit baguhan ay meron ka awayin si mentor. Huwag hayaan na
namang team/consultants ay di mo free sketches kasi masasanay ang
nidedeceive public. Di pwedeng people sa ganun. Example: Free taste
lokohin ang public regarding
competency if di naman talaga kaya 4.2. informing the client- magbibigay
unless may acads quali/ may ng proposal sa kanya tapos si
support/back up para matugunan proposal dalawang service pwedeng
nang maayos ang project na yun. If di ibigay, detailed architectural design
keri ay sabihin mo at hahanap ka ng services (DADS) or detailed
consultant, gusto ko ikaw ayern architectural and engineering design
sabihin mo hahanap ng team services (DAEDS). Kasi if dads puro
regarding sa may alam tungkol dun. architectural lang si client ang bahala
sa mga engineering. DAEDS yung equip rental, and manpower.
ginagawa sa BT mga structural, Pwedeng mas lumaki or lumiit. Bawal
electrical, plumbing, sanitary. Yung pf ibigay kay contractor yung estimate
ni engr kasama dito. DADS recom 6% baka itake advantage or mag adjust
pf kapag DAEDS 10% recommended ganern. May tinatawag tayong fixed
siya. Depende sa kakayahan ng price method of compensation or
architect. Hindi libre. Start with your lump sum. Saan yun nangyayari?
service agreement. Kapag mga government porject ang
handle natin ay napakaraming papels.
4.3. there are some projects na di Yung budget allocation ay maraming
practical,m kawawa lang si client, pinagdadaanan, dapat magaling ka
alam mo namang di dadayuhin dahil mag estimate. Yung PF mo ay
di maganda or walang market. In maiindicate mo kung magkano kasi
terms of that, it is good advice na yun yung sisingilin mo kay
sabihin na huwag na magparesort government. Kung bumaba ang
char rest house na lang. Target proj ni presyo edi goods, kapag lumaki yung
client ay spa sa kabilang barangay ay halaga ng project though lugi ka pero
yun ay malapit sa bayan at malapit sa ganun pa rin yung scope of works mo,
kalsada. Si client bet na rin ganun di mo na hahabulin. Yung
pero liblib na yung lugar, tapos agri papoerworks na isasubmit mo ganun
yung pinaka spource of income the pa rin naman. Kapag lang tumagal
who pupunta? If legal ba, yung sa ang project delivery kawawa si
return of investment din. Tapos Architect kasi naka fixed price. Sa
dpinipilit kahit kulang budget even government project lang naman yan.
though hindi achievable yung bet nya.
Kapag mapilit si client nagalit sayo 4.5. Client’s budget kung yun na ba
atleast honest ka as archi. Bagong hinihinggi ni client, balikan natin na
bukas na school tapos naisipan ni pagdating sa mga project na gusto ni
client magpatayo ng student hub client, anong mga bet nyang gawin.
comp shop, mga billiard halls, bar, Sa mga requirewments pa lang,
basta lahat na. Syempre kikita siya magbebenifit ba ang community?
but in terms ng legal importance ay ANONG Magiging impact sa
baka ipasara siya in the future. Di ka kanila?Torre de Manila, walang effect
pumayag because of that. Sa civil sa kanya directly ang prob lang ay
liability hindi lang sa tao but yung mga kapag nipipicturan mo? Andun yung
maapektuhan sa future. socio-cultural impact. Aesthetic,
nakaganda ba siya? Yung project
4.4. when we do our estimate, kaya natin ay magiging permanent part ng
nga estimate ay hindi 100% accurate, community. In terms of function,
nasa 85-89% lang yung accuracy nagagamit ba talaga? Mga feasibility
natin kasi napakadaming factor. study, would it be beneficial sa public?
Kapag babalikan ang 3-D yung At function nung bldg. Private yung
delivery kay contractor yung contract client, siya ba ay hindi lugi? Balik kay
price ay kay contractor di nya 4.3 kung yung FS ba ay hindi siya
papadagdagan, di rin pababawasan. malulugi dun at pasok budget ni
Kay contractor nakadepende kasi client? Value Management or value
nasa kanya 3M, man, mats, engineering - economical. Hindi ibig
machinery. Mga halaga ng mga mats, sabihin na mura at low qua na and di
rin ibig sabihin kapag mahal ay good pwedeng may mga pa percentage ka
qual na, Nakabase kung babagay sa dapat si Client yung magbabayad
project. sayo.

4.6. Shall bill his/her client for the 4.9. Walang ibang investment or
services and experience based on business relation outside the
(recommended professional fee) profession. If may ibang business
base sa SPP. Pinalitan na ang term. interest siya na makaka affect ay
Sa mga basic ay kawawa ang mga dapat inform client beforehand. Yung
bagong architect, kasi bakit ka halimbawa ay may pa product ka pala,
sisinggil ng malaking pf ay bago ka dapat alam nya na kaya ganern.
lang pasa? Nagbaba ka ng pf edi may Halimbawa nagkataon na si client ay
nilabag ka sa SPP. May mga Ar na magpapatayo ng resto tapos malapit
malaki sumingil and mababa di na yung resto mo dun edi inform mo
makakasuhan kasi recom na beforehand. Dapat malinaw kay client
nakalagay kay SPP. Ibibill si client, yun. Para di kayo mag-away ni client.
hindi libre. It takes creative thinking Honest advisor sa kanya and
para makapagrecom ng design, at prejudiced sa mga business interest
yung mga solution ganern. niya. It’s not about kapag nagtayo ka
Discounted is goods but not free kahit ng business na ganun ay yun lang
kaano-ano. Kaya naniningiil ay irerecom mo, the client have the
nagtatrabaho tayo. rights na magsabi kung saan nya bet
kasi di lang yug product mo ang
4.7 shall undertake dun sa option nya.
construction project, hindi
kinakailangan na maging contractor 4.10. Shall include in his/her
para mag undertake ng ating ginawa. agreement with the client a clause,
May right para mag manage at mag nasa civil code pa lang pinag usapan
handle ng project na ginbawa, as natin siya dati. Yung mga possible
service sa design build. Design and arbitration and solution ay hindi na
build service, ikawe na rin ang aabot sa court. Gaano katagal, anong
pwedeng maghandle, design sa isang dapat mangyari kapag late nagbayad,
ar tapos ikaw na bahalang mag kapag hindi nagawa si Ar.
deliver ganern. Lalong lalo na kapag
ikaw nag prep ng design mas alam mo 4.11. do not cram/ procrastinate.
yung proj na yun. Napakahalaga sa atin ng time
management. Ang dami nating
4.8. Sino ba yung interested source hawak/ involve sa buhay natin. If
na pwedeng mainvolve? Sila mapagsasabay sabay keri naman
contractor, suppliers. Makakakuha ng ihandle. Hindi ibibigay tapos lahat ay
commission, halimbawa si project na bukas. Learn how to manage your
yan, kay project meron kang mga time, ano yung magiging priority, alin
contractor and supplier. Yung kikitain yung urgent edi siya yung unang
ni Ar ay kay client lang dapat ang tapusin. Ano yung pinakamatagal,
kikitain lang ay base sa project. Kapag umpisahan na agad. 2. Kung ano ang
siya naging contractor nun may next isubmit? Nitetrain in terms of
marereceive na percentage si Ar. Ar time management kaya may mga
should not ask any in return. Hindi deadline. Kasi you agreed sa time
limit ng project na yun. Nagkasakit or
may events na di kontrolado di 5.2. Mali ni Architect, mali yung
naman pwedeng sabihin kay client na ginawa niya may error, tinawagan si
may deadline kay client 1, may contractor na papalitan, pero what if
meeting kay client 2, tapos may tapos na? Dapat iinfrom si cliemt at di
gagawin kay client 3. Learn how to rin siya saluhin ni contractor. If si
manage your time. Pag nag agree sa client ay nagtanong ng sa gastos
time, yung presentation ang magiging tapos sabi nya na ikaw na magbayad
usapan ay 1-2 weeks. Huwag mag edi ikaw dapat. Tapos nakalagay
commit sa hindi kaya. May right ka na dapat sa service agreement na if may
sabihin na give me atleast 5 days circumstances na ganun. Na liability
ganern. Kapag nag eestimate ng oras siya ni Archi.
dapat ay may palabis.
5.3. Kaya meron tayong job site or
4.12. Si client wala sa Pilipinas tapos periodic visit. If nagpunta sa site or
nagkaprob sa site, halimbawa kulang yung schedule na yun ay mahalaga,
sa ganito ganern di napadalhan ng bago yung buhos ay dapat macheck
progress of work si client edi ni Architect kasi what if sa inspection
magagalit si client kasi madedelay mo ay may mali edi macocorrect
ang construction. Need maging agad tapos marereject if may mali na
honest talaga para walang prob di materials. Sa progress ng work dapat
pwedeng pagtakpan. Gusto nila kung icheck if tama ba spacing, form works,
ano yung totoo yung transparency. Si mga lateral ties mga stirrups mga
engr di nagpapakita edi nadedelay spacer di ba magkakaprob? May tama
project need mo iinform si client na bang spacing ng mga tiles? Wala
ganun lalo sa construction kasi mas bang naka anggat masyado or
mahirap kasi may expected time ng nakalubog? If may prob, inform agad
delivery kaya need dapat laging si contractor. Nasa best quality kasi
updated, as much as possible ay dapat ginagawa. 3 days before buhos
weekly report ang ipadala kay client nag request si contractor tapos 1 day
para walang maging prob. Walang before ka nagpunta tapos may mali
prob if nasa site siya ganern. edi kasalanan mo yung delay ng
works ni contractor. Make yourself
available, or kinabukasan.
Article IV
Rs with contractor 5.4. tulad ng sa rs with client wala
kang ineexpect na other source na
Section 5. Best interest ng client ang pagkakakitaan from that project.
ating hinahabol si contractor di Hindi dapat na kapag kinuha mo siya
pwedeng iset aside kasi sa atin may percentage ka kasi siya yung
depende kung paano sila kinuha mo. It is very unethical.
makakasweldo. Filipino culture: Kapag binigyan tayo
ng favor (utang na loob) ay ayun.
5.1. Yung ginagawa sa BT ay practice Huwag ilalagay ang sarili sa alanganin.
iprepare ang contract docus: Archi, Natapos na project, oks na tapos
structural/ civil docus, electrical nagbigay si contractor ng regalo? Like
docus, plumbing and sanitary docus, cake, or damit binigyan kayo ni owner
if needed mech documents. both ay pwede yung ganito kasi way
of pagpapasalamat siya kasi naging materials na gagamitin? Example:
mabait ka. Basta kadamay si owner need mo ng buhangin, yung mga
ha, at dapat aware si owner regarding nagdedeliver ng bato, graba mga
sa pagbibigay. Kapag ikaw lang dealer ng panambak edi ikaw
binigyan, edi isauli mo. Gifts na di gumawa charot. Partner natin sila sa
pwede: sasakyan, at laging binibigyan industry kasi need din natin sila.
ng cash. Example: trabaho sa real- Manufacturer sila nagcoconduct ng
estate if may bagong unit owner edi experminet, gawa ng material ay mas
need may contractor yun, tapos si magiging advance na siya dahil sa
contractor mag aapply ng design, kanila. Itetest muna nila para kapag
tapos mag aasikaso ng permit. nipresent na nila sa mga Ar at
Minsan may nag iiwan ng 20K at kung professionals may masasabi sila.
anu-ano pa. Ay sinasauli ni Architect. Tapos papakinggan antin if babagay
ba sa ating design, sa ating project. If
5.5. Contractor nag bibill sila, magfifit ba siya. Dapat maging fair
nagbibigay sila ng bill ng client base tayo sa lahat.
sa progress, Progress Billing ang
tawag. From that, ichecheck ni Archi 6.1. May mga product/supplier na
kung tama ba yung binibill. Yung mga nagooffer ng free engineering.
nasa contact docus and quali of Malalaagay tayo sa alanganin kasi sila
works is oks ba. Magkakaroon ng na lang nang sila.Example: si
Certificates of Payment (galing kay metalyte, kasi siya yung nag ooffer ng
Arc) tapos if nabigay na nito kay client free professional engineering services.
ay mag iissue ng payment si owner. Ipopprovide lang nila ay structural
Additional expenses kay contractor ay design sila na bahaal sa computation
iwasan natin kasi kawawa workers kasi special construction siya. Steel
nya :((( Tapos huwag idelay si Cert of framing, from frames tapos nilagyan
Payment kasi what if maliit na firm ng fiber cement boards.
lang? With that, malaki yung
repsonsibilidad natin sa contractor at
mga umaasa sa kanya. Example: 6.2. Dito yung mga commissions
Nadelay payment ni client minsan discounts, and fees, etc. Basta dapat
may mga archi na naglalabas ng pera lahat ng discount ay kay client. Yung
kasi iisipin paano yung iba? Final market discount ay para sa expenses
Certificate of Completion, di tayo ni client. Kasama na yung market
basta basta dapat mag issue neto value nung material at hindi yung
kasi wala nang habol si client kay discounted value. Yung pf ni ar ay
contractor. Ibig sabihin ay completed hindi nakadepende sa market
na at well-delivered na. You need to discount, sa market value naman siya.
check everything. Kapag siya ang kinuha ay may 5%
mali yun. Mga supplier magaling
magbigay ng gifts. Ethical kapag sa
org. Kasi they want to present their
Article V products. Wilcon, in every 10K may 1
Manufacturers, dealers, and agents point ka, tapos converted sa cash. Sa
ganun mga point system cards ay bali
Section 6. Technical info. Without this wala, it is not as a gift naman kasi.
partners saan tayo kukuha ng
Article 7. Colleagues and barangay ay walang problema dun
Subordinates kasi nasusuportahan mo community.
Section 1. Mga ate kuya, utoy, ineng Halimabawa: Magkasama sa isang
yung rs ay nandun yung higher year at org si client, Ar. A, Ar. B, D, E, tapos si
nakababata ay need iassist, sa ating client ay may ipapagawang project
profession kapag professional na ay halimbawa papadesign ng hospital,
ganun ap rin. Need iassist tapos si A nagbigay agad ng sketches
maganda eto sa mga hospital ganyan
7.1. Mahirap umpisahan ang service ganyan ay nag open up lang naman.
agreement. Di tayo dapat nag ooffer As a responsibility sa colleagues mo
ng free, dapat pinapakita natin ay hindi dapat ganun kasi parang
yung mga experience natin. Hindi siya nakikipagcompete ka sa kanila. Si B
free taste. Proposal muna, anong naman ay nag uusap tungkol sa
nasa proposal? Sa services natin project tapos ikaw naman naisipan
pwede tayong mag offer ng DADS or mo magbigay ng sample edi nakipag
DAEDS, sa bawat isa na yan may compete ka na kay B. Hindi tayo sa
corresponding PF. Magbigay ka muna competition dapat, sa mga school
ng proposal tapos if oks na gawa kang may design competition, iniinvite
service agreement. Tapos ayun lahat. Open siya sa lahat ng arki.
pwede mo nang simulan preliminary Alam din ng lahat ay may isa lang
services. Di lahat ng client ay gustong mananalo, kahit mapaaga ka ng
mag service agreement, explain na submit ay sabay sabay siyang
protection siya ni client. Oks na yung titingnan. Unang nabuksan, susunod,
project pero yung SA ay hindi etc. Kasi naka envelope yun, di dahil
napabalik tapos di naman makulit sa pangalan yung pagtingin, bale may
nang makulit kasi nagbayad naman basis siya yung design mo.
siya.
7.3. Bakit papasok as competitior
7.2. Shall abide the RECOMMENDED kapag involve na sa pagfofofrmulate
PROFESSIONAL FEE hindi na naka sa competition na yun? Alam mo na
basic min fee, dpeende kasi sa SPP mga hinahanap tapos nagjoin ka pa
kasi magiging dependent na sa as competitor nagsubmit ka pa ng
experience and professional idea, etc. Ijajudge mo design at
capability ng architect para di drawing mo, bawal ka rin mag adviser
kawawa bago. Sa respo in relation to or juror kapag nag assist ka sa
people mas maganda na itap ang preparation. Yung member sa firm
community mga chapel ganern halimbawa ay bawal din yun
kausapin sila sa halip na magdonate unethical yun. So ikaw ay, may
ng pera ay idonate na lang design, nanalo na sa compe tapos ikaw ang
bale valid kasi may exemption naman Architect of Record ay unethical yun
dito. Halimbawa ay member ka ng dapat ay yung nanalo yung AoR,
Rotary Club bale may pera sila tapos consulting ar ka lang dapat.
may project sila tapos nag donate ka 7.4. Sa situation nan eto si client
ng professional service, tapos ginamit tapos may Ar, Ar A, B. Kausap na si Ar
mo as competitive advantage like B on the process na sila nasa
kaya ka sumali kasi may hidden negotiation na inaayos na tapos
agenda ka pero kapag mga chapel kaibigan ni Ar A si client naisip nya
naman, mga maliliit na proj sa why di sa kanya binigay, doon
pumapasok yung susulutin si client mga changes tapos nandun din si ar.
para magbigay siya ng proposal. On B tapos dun nya lang nalaman na si Ar.
the process of negotiation kay B B nagbago ng design tapos matagal
tapos kausap din pala si A na di na nyang ginagawa at kausap nya na
aware both arki, hindi sakop eto dito si client. Scenario 4: Client, A, B, may
kasi di naman aware si A. Mas bata si prject 1 at 2. Project 1 A, Project 2 B.
A si B kunyare di papasok sa Nagalit si A kasi employed naman
unethical kasi di naman alam at si daw si A tapos nanulot si B, hindi siya
client naman yung di naging honest. unethical kasi magkaiba namang
Kaya if may client ask muna if may project.
kausap silang iba at kailangan may
minutes of the meeting para may
proof din halimbawa kapag nag file ng 7.6. Sa situation na eto kay 7.5 same
petition or complain ay proven na client kay 7.6 magkaiba na client kasi
innocent siya. Two-way siya respo sa nagbenta na nang structure. Owner 1
collegues and respo sa self na hindi may Ar 1, tapos si Owner 2 may Ar 2.
mainvolve sa situation for the sake na Tapos before he proceed ay dapat
may makuhang client ay may iinform muna si Ar 1 lalo kapag
magagalit naman na iba. rehabilitation. Si Owner may tenant
tapos may agent si owner. Si Ar 1
7.5 May isang project na nahandle author ng bldg kausap ni Ar 1 si owner
tapos kapatid ni owner tapos may at agent. Si agent nakakuha ng tenant
ipapatuloy, tapos hinanap yung fp, si tenant kumuha ng Ar 2. Sa halip na
yung mga working drawings tapos magkaroon ng rehabilitation ginawa ni
nakita nila kung sinong Ar. Tapos Ar 2 pinadaan kay agent sa pagdating
kinausap yung previous architect. ng remodelling sa structure. Kinausap
Need pa ba mag gawa ng letter para si Ar 1 na may babaguhin sa structure
mainform na pumapayag na siya (fact sabi ni agent, gusto ni tenant
of writing) tapos pumayag na si Ar na magkabutas sa wall. Tapos sabi ni
hindi na edi oks na. Another example, agent kay Ar 1 ay kung pwedeng
may addition sa project. Pwede ba butasan yung partition wall tapos ang
magpaset ng sched? Meeting punta proposal ni tenant at ar1 ay
ng bahay, tapos iaask kung sino yung magkakabutas. Anong butas ang
Ar ayaw sabihin pero dapat iinform si maiisip? Bale complicated kasi may
client na need malaman ni dating Ar iba’t ibang kind ng hole like butas
kasi nga may irerevise lang sila painting, kitchen window, tapos open
ganern. Scenario 3: Pero hindi na sila plan. Bale nigrinder daw si buong
yung addition, si client may usapan pader ay impossible naman kasi
sila ni Ar. 1, maraming gustong within one week ay tapos na tapos
mangyari si client may mga prob na nagkaroon ng leak, si waterproofing
mga may tumutulo tapos ayaw nilang tinanggal yung warranty, yun yung
may mga insect sa bahay. Tapos si Ar. scenario kasi di nakipag coordinate si
B ay dating student at staff siya yung Ar 1 kay Ar 2. Si owner yung
naghandle ng project ni Ar. C. Then magkakaproblema. Example laptop
meron ngayong balance sa project di warranty 6 months tapos natanggal si
pa siya totally na warranted, as orig warranty edi wala ka nang habol dun.
architect (1). Nagpatawag ng meeting Sa SPP mas malaki ang pf sa mga
si client tapos nakita ni Ar 1 na may remodel and rehabilitation kaya
important na kahit magkaiba ang 7.8. Maraming enterprise na makasira
owner ay iinform pa rin si original sa ation example mining industry,
author ng design. Related sa 7.5 logging, group or supply na hindi
tapos magkaiba na owner. Always naman valid or trusted na pwedeng
coordinate what if di na kilala yung makasira sa pangalan mo. Sa
previous ar? Search na lang kay manufacturing ng isang product
google. For confirmation ng delegates tapos yung product ay makakacause
depende sa Area ng chapter sa non- ng damage sa environment. Sa
architect ay mahirap pero ayun supplier hindi naman nakakacommit
nisearch na kay google or fb. Kaya sa kanyang promise date pwede ka
impossible na hindi natin malalaman ring madamay dun. Kaya don’t let na
na hindi natin makita si Architect. gamitin ang name mo for
Kapag walang as built drawings ay advertisement.
mahirap yung ganun kaya minsan
nagdodoble gawain. Kapag patay na 7.9. There’s a possibility na kapag
ay inform the family tapos si fam nasa may lumapit (si tita) kasi papagawa
ibang bansa na out of reach na ayern ng structure or bahay tapos nalaman
proceed na ikaw. Kahit sabihin na na nagawa kayo ng ganun tapos
hindi pa archi heritage kapag naman babayaran ka na lang daw 1K per
nakikitaan mo na nang quality na sheet daw. Bale ang magiging
mayt potential ay try to propose na mentality ay magkakaroon ng extra or
post modern if irerenovate or what sideline tapos tinanggap mo. Archi
baka naman masesave at may docus lang binigay mo tapos naka
possibility na magustuhan yun cad naman, siya na bahala raw mag
bagong proposal. Example: Las paprint. Sa archi docu may 4 sheets
Casas Filipinas de Acuzar, yung mga tapos binigay na yung file kay tita para
structure ay binibili nila yung mga maipagawa kay client. Sa 4K kumita
lumang luma nang bahay, yung kayo pero the question ay can you
structure mismo tapos disassemble claim na yung project na yun ay
tapos dadalhin na sa mismong place project nyo or design nyo? You
tapos aassemble na ulit. Yung mga cannot claim na sayo yun tapos inalis
bahay tsaka structure ay kung baga na designed by, etc. Kasi halimbawa
ay brick by brick dinadala nila dun. pinapirma na lang ay engineer.
NOTE: Possibility of restoration. Naeexploit ang mga kakayahan.
Kapag ayaw ni client wala taytong Kapag naman nihire ng instructor ay
magagawa. pwede naman basta Architect. Tapos
drafting lang hindi design mismo.
7.7. Part of our CREDO, if we have Kapag may revision papaulit. May
comments we have to lean our design na idedetail na lang. Sa
comments on a constructive points mentor, design nila at hindi sa
yung di makakasira or student. RA 9266 because of this law
makakadamage sa name ng ating ay pinagbawalan na yung pirma,
colleagues. How we can improve and pirma na lang tapos babayadan na
not to discredit. Huwag yung lahat na lang ng 500. Bale si Ar yung nakikipag
nang nakita ay negative. Huwag deal on his behalf yung naka salary ay
manira at baka makasuhan din ng parang naging staff siya ni Ar Briones
libel. during the project. Tunuruan siya
kung paano ang process sa pagdating
ng profession. Mas makikinabang years need mag renew ng PRC ID -
kayo kasi marami kayong matutunan. reqs need ng IAPOA cert + nandun din
Huwag pipirma kapag wala yung or need din ng CPD points or units.
personal supervision. Arki firm nag Nung nicompute ay 1500 yung
reg sa dole yung apprentice ay chapter dues tapos 600 yung national
pwedeng 50% lang ibayad lalabas na dues penalty + 50%, 900 * 3 tapos
allowance lang. Papaano kapag 1500 * 3 = 7200; nagrereklamo kung
namatay or namatay na yung mentor? bakit ang laki ng babayaran etc.
**Buti na lang may anak na Ar. Advise Before iimplement yung ganun ay
ay huwag muna magtake ng ALE didiscuss during the membership
magpa employ ,muna. meeting. Being part ng profession and
organization responsibility mo na
7.10. Naka minimum kasi ang point maging involve sa advocacy ng org.
ay apprentice ang iba naman ang
kanilang niooffer lang ay allowance 7.13. When you are conducting your
(food and transpo). If arki na di professional practice as arki
pwedeng tanggihan na makaattend ng magpeperform tayo ng ating trabaho
mga seminars and conventions ang being architect. In our performance
staff. He/she shall tutor and mentor. sa practice natin dapat ay
Yung environment nila noon though nakakasunod, siguraduhin na ang
masaya naman kasi kakaunti pa. firm ay supervised ng maayos tapos
Mentorship, guiding you para mas qualified yung staff. Kapag sa hiring
matuto hindi eto dapat kung hindiu tinitingnan if qualified ba or hindi.
dahil sa experience, paano hindi Make sure na ang firm alam mo na
magkakamali igaguide na parang bata under appropriate or under ng proper
na hahayaang madapa para tumayo monitoring. Hire ng staff imonitor ng
ulit or hindi hahayaang madapa. Give maayos yung opisina if okay ba ang
assistance. performance ng trabaho., If qualified
pa ba para magprovide ng services.
7.11. Technical knowledge and Dapat ang kukuhanin na staff ay
experience, walang arkitekto na qualified. Pwede mag function
madamot. Siguro nagkakataon na efficiently ang firm kasi binabayaran
hindi lang fit sa sched. It is about time ni client. Setting standard para sa
management kung anong kayang firm, para sa quality. It is the
pagsabayin ay pagsabayin. Give time responsibility ng Ar. Kapag nag
kung paano masheshare ang perform tayo ng duty as arki dapat
knowledge sa iba. Di lang tungkol sa may naiset tayong standard.
matatagal na sa profession.
Sometimes yung mga bago sila yung 7.14. Intellectual quality, huwag
maraming alam. They are the one kumopya basta basta ng design from
who speaks for the older professional. another arki. Intellectual property law.
Sharing experiences para may If si client ang may bet ay inform the
malearn mula sa kanila. arki before gamitin. Kung walang
permit nung ar na yun di pwedeng
7.12. Personal commitment and gamitin. Mahirap ay how can you
involvement sa organization. prove that, that is idea is your idea.
Dedication and commitment kasi pati Basis sa intellectual ay kapag
yung time mo nagsasuffer. After 3 executed na yung project. Isang proj
sa QC parehas siya pero kapag nag makapagbayad si client para mas
look further ay may pinagkaiba malinaw yung usapan.
naman edi bawal magreklamo. Kapag
may idea ipa patent mo para walang 7.18. Para sa sarili yung sa branding,
basta basta kokopya kapag may magseset ka ng standards may
gumamit na iba pwede mong kasuhan. pagkakakilalanlan ka agad.
Patent dapat ikaw mismo may idea or Excellence, standards ano yung
nagdesign nun. functions, how you practice but also
about yourself. Paano ba magiging
7.15. Reputation mo kasi yung service trainings, practice, etc. Generally for
mo fair dealings tapos maayos the org nandun din na if may standard
trabaho mo tapos nag strive ka para na naset si organization papaano
matuto. Professional know-how mo. naman ang sarili mo? Hindi yung
Pwedeng pumasok ng mga seminars, generic ka lang palagi. Halimbawa
short courses, etc. Improve your pipili ka okay lang eto di na baleng
service. If may achievement tayo mahal basta alam mong okay naman.
hindi atin lang bigyan ng credit yung Respo not just sa org but pati sa sarili.
nakatulong sa atin. The way you talk, carry yourself, and
how you dress. Kapag lalabas ka
7.16. Huwag basta basta magbibigay titingnan ka muna ng tao. Hindi ka
ng quotation lalo na if you don’t have nila ijajudge kung magaling ka ba,
that much info. May nabalitaan, alam titingnan muna nila mula ulo
mong nangangailangan ng estimate hanggang paa.
or value, appraisal report ikaw naman
ay ganun yung price nun nagbigay ka 7.19. napagusapan before yung
ng quotation or fee proposal tapos contribution ano ba yung maibibigay
masyado palang mababa edi sa construction idustry kung ano yung
mababarat si client. Masyadong maiimprove natin. Promote allied arts.
mataas edi under sourcing naman Ishare sa iba.
tapos si contractor ay nitake
advantage sila madam. Nag agree si 7.20. Sa committee of ethics and
contractor ay di naman pala swak edi discipline nagfafile ng report. Yung
siya ang affected. Kaya huwag pabida complain puro client sa atin kasi as
or nosey. Alamin muna ang scope much as possible sabihan muna bago
and nature ng project para makapag mag complain sa ethics and
prep ng tamang fee proposal. discipline. UAP protects the members
hindi yung tanggal lisensya agad
7.17. Proposal is not enough. Yung kapag halimbawa yung substantial
service agreement ay maddl sa info na nadun yung mga proof hindi
internet, scope of work mga ganun. lang siya basta belief or chismis lang.
Kung ang nioffer ay DADS kapag
dating sa scope of work nakaindicate 7.21. Papaano naman po yung aming,
kung anu-ano yun. Mga yung sinasabi sa portfolio or sample
responsibilities, limits and fees of works, syempre papaalam tayo kay
nandun din. How computation, mode mentor at hindi yung kukunin na lang
kung paano isosolve, provision of basta. Halimbawa plano ng bangko or
termination, if magkasakit si Arki or di plano ng bahay ng isang pulitiko or ng
mga pawnshop basta yung
mahahalaga yung security hindi basta
basta pinamimigay. If sayo lang at di
papakita sa iba ay huwag na kunin
kasi para saan pa? Files and docus
hingi ng file kasi may pagkakalilanlan
yan e. Huwag basta kukuha lalo na
ang pinag uusapan dito ay personally
performed by the apprentice or
employee. Basta pinapaalam baka
kasi magkagalit pa dahil dun.
7.22. Hindi pwedeng magkaroon ng
discrimination halimbawa sa age
naghahanap ng employee example ay
we are hiring RLA 25-35 years of age
with 10 years of experience.

SCHED NG EXAM
OCTOBER 22 Saturday 3105, 3106,
3017, 3108 1PM to 2:30PM. Kasi may
exam na kasunod sa BT. 4th flr ng
CEAFA.

Coverage topic 1 to topic 3


references sa UAP webiste
publication, CMO, yung sa log book
ng diversified experience

Di pa sure**
Multiple choice
Identification

No meet next week.

Magtitinginan or mag uusap during


the exam ay bagsak na.

You might also like