DIMENSIONAL FIT-UP INSPECTION REPORT
MOB TUNNEL PORTAL
PROJET TITLE The Cube: Mountain Top excavation phase 1 Descpition
CANOPY STEEL RIB FORMATION DETAILS
Client Name LIMAK / AECOM / NEOM PART DESCRIPTION STEEL RIBS
JOB No. 302 Materials ASTMA A-36
Date. 11/20/2023 Drawing No. DRG-000041-02
Report No. 0075
Thickness(mm)
Quantity Length(mm) Height(mm) Width (mm) Radius Holes (if any)
SL No.
Tf Tw Accept
Description Remarks
Reject
Req Act Req Act Req Act Req Act Req Act Req Act Req Act Req Act
HEA 200 Curved BEAM FABRICATION
1 16 16 2540 2540 10 10 6 7.8 190 190 200 200 9430 9431 - - Accept
⌒2.540
HEA 200 Curved BEAM FABRICATION
2 16 16 1063 1063 10 10 6 7.8 190 190 200 200 9430 9427 - - Accept
⌒1.063
3 HEA 200 Curved BEAM FABRICATION
16 16 6167 6167 10 10 6 7.8 190 190 200 200 5920 5923 - - Accept
⌒6.167
HEA 200 Curved BEAM FABRICATION
3 16 16 3624 3624 10 10 6 7.8 190 190 200 200 6980 6982 - - Accept
⌒3.624 STEEL RIBS DIMENSIONS
& FITUP CHECKED ,IT IS
Distance from plate to Holes
Quantity Length(mm) Thickness(mm) Width (mm) Holes (if any) Size Accept FOUND TO BE ACCEPTED
SL No.
Description X Y AS PER APPROVED
Reject
Req Act Req Act Req Act Req Act Req Act Req Act Req Act Req Act DRAWING
STEEL CONNECTION PLATE
1 32 32 250 250 20 20 250 250 2 2 ⌀25mm ⌀28mm 125 125 80 80 Accept
250x250x20mm
STEEL CONNECTION PLATE
2 224 224 250 250 16 160 250 250 4 4 ⌀25mm ⌀28mm 125 125 75 75 Accept
250x250x16mm
3 STEEL CONNECTION PIPE 416(Each Side) 416 50 50 - - 3/4" 3/4" - - ⌀25mm ⌀25mm 1m(C/C) 1m(C/C) 1m(C/C) 1m(C/C) Accept
4 STEEL LAGGING PLATE 80 80 650 650 3 3 150 150 1 1 ⌀25mm ⌀27mm C C 38 38 Accept
Sub Contractor:- NAZ STEEL EST CONTRACTOR :- LIMAK Client :- NEOM