FIT-UP INSPECTION REPORT

The Cube: Mountain Top excavation phase


PROJET TITLE Descpition
1
Client Name LIMAK / AECOM / NEOM Part Details.
JOB No. 4527 Materials .
Plate Thk 10,8,16,20 mm Drawing No.
Date. 11/19/2023 Report No.
Thikness MM Root Gap (mm)
SL No.

Joint No. Description Req Act


Req Act Req Act

HEA 200 CURVED


BEAM TO BOTTOM
1 F1 20mm 32nos 32nos 6 6 0 0
CONNECTION
PLATE

STEEL
2 F2 CONNECTION PIPE 1m C/C 1m C/C 6 6 0 0
TO HEA BEAM 200

FLANGES TO WEB 16 16
3 F3 JOINT
6 6 - -
SETS SETS
HEA 200 CURVED
BEAM TO 16mmm
4 F4 CONNECTION
224 224 6 6 - -
PLATE

NAZ STEEL QC Third party Inspector (INAT)


N REPORT
MOB TUNNEL PORTAL
Descpition
CANOPY STEEL RIB FORMATION DETAILS
Part Details. STEEL RIBS
Materials . ASTMA A-36
Drawing No. DRG-000041-02
Report No. 0075

WELD
JOINT TYPE WELD TYPE Result Remarks
PROCESS

FILLET FCAW Continous Accept

STEEL RIBS FITUP


CHECKED AND FOUND
FILLET FCAW Continous Accept ACCEPTED AS PER
APPROVED DRAWING

FILLET FCAW Continous Accept

FILLET FCAW Continous Accept

NAT) QC Engineer (LIMAK)