Workshop
C
Concept
t
HAZOP
Hazard and risk analysis
Triconex Logic
SIS design
Dynamic simulator
SIS Checkout
1 HAZOP
1.
• HAZOP uses Brain
B i Storming
St i method.
th d
• Case: Furnace process (See P&ID)
<Step 1>
• Define the Node.
– Node1: Crude Line
– Node2: Fuel Gas Line
– Node3: Air Line
– N d 4 Combustion
Node4: C b i Gas G Line
Li
• Let’s talk about Node1: Crude Line.
1 HAZOP
1.
1 HAZOP
1.
1 HAZOP
1.
<Step
St 2>2
• Imagine the situation which crude flow is lower
than normal
normal.
• Define the scenario as much as possible.
• Then,
Th d define
fi the
h following
f ll i things
hi f each
for h
scenario.
– What is the cause?
– What is the consequences?
– What is the safe guards?
• Write down to HAZOP sheet.
1 HAZOP
1.
Example
Project JCCP Training Safety System
Unit Furnace
Node 1
Node 1 description Crude inlet line from crude pumps passing the foure crue lines in furnace to the distillation tower
Deviation Cause Consequnces Safegards
Low or No 1.1.1 Loss of crude oil pumps Crude oil high temperature, possible break in the pipes . Low flow trip FALL-101, 2oo3 high temperure trip TAHH-
flow Pool of crude oil in the furnace lead to a fire and possible 121(122/123/124) A/B/C. High temperature alarm
explosion TI141/142/143/144 TC 131 TI 311 Low flow alarm FI
TI141/142/143/144,TC-131,TI-311. FI-
101,FC-111/112/113/114. Pump trip alarm. Control loop
of TC-131/FC-201.
1.1.2 Failure close on control loop same as above Low flow trip FALL-101, 2oo3 high temperure trip TAHH-
FC-111/112/113/114 121(122/123/124) A/B/C. High temperature alarm
TI141/142/143/144,TC-131,TI-311. Control loop of TC-
131/FC-201.
113
1.1.3 Bl k
Blockage iin oilil liline same as above
b L fl
Low flow trip
t i FALL-101,
FALL 101 2oo3
2 3 high
hi h temperure
t trip
t i TAHH-
TAHH
121(122/123/124) A/B/C. High temperature alarm
TI141/142/143/144,TC-131,TI-311. Low flow alarm FC-
111/112/113/114. Control loop of TC-131/FC-201.
1.1.4 EV-101/102 fails close same as above same as above
1 HAZOP
1.
<Step
S 3
3>
• Imagine crude flow high. And define the scenario,
then describe it’s cause, consequences and
safeguard same as low flow.
<Step 4>
• Define and describe the crude pressure and the
crude temperature same as the crude flow.
<Step 5>
• Define all Nodes.
1 HAZOP
1.
<Practice>
• There are the HAZOP sheets but not completed
p
yet.
• Let
Let’ss try the HAZOP study.
study And finish it
it. (15min)
2 1.00E-02 1 in every 100 years Minor Injury LTI (Lost Time Injury) absence
of less than 6 weeks
6 1 00E-06
1.00E-06 1 in every 1
1,000,000
000 000 years Multiple Fatalities Single Fatality (between 1-3
13
fatalities)
2 LOPA
2.
<Step 5>
• Define Layers
y of Protection (Column
( 7a – 7e))
• Define Failure Frequencies for each Layers of
Protection using following guidelines.
guidelines
– Basic Process control Failure: 1 in 10 years
– Alarm & Operator Response Failure: 1 in 10
– Other SIF Failure (Additional mitigation): 1 in 100
– Safety
f Device Failure
l (ex
( Pressure reliefl f Valve):
l ) 1
in 100
2 LOPA
2.
<Step 6>
• Define the Occupancy (Column 9) around the area.
• Define Occupancy, possibility of Ignition, and Fatality.
– Occupancy: Percentage of time the exposed area is
occupied during a normal working period. Ex. 2hr per 1Day
= 2/24=0.08.
– Possibility
P ibilit off Ignition:
I iti a high
hi h probability
b bilit off catching
t hi a fire
fi
is 0.5, Rupture or explosion is 1.0
– Fatality: No.
No of people present when the area exposed to
the hazard is occupied.
2 LOPA
2.
<Step 7>
• Define all causes for SIF.
• Finallyy yyou can find out the required
q Safetyy Integrity
g y
Level. (SIL)
Column8=Column3*Column(7a*7b*7c*7d*7e)
( )
PFD(probability of failure on demand)=Column7/(Column8*Column9)
Summary of PFD PFD=1/(sum
1/(sum of (1/each event PFD))
Safety integrity level Average probabliy of failure to perform its design
(SIL) function on demand
4 <10‐5 to < 10‐4
3 < 10‐4 to < 10‐3
2 < 10‐33 to < 10‐22
1 < 10‐2 to < 10‐1
2 LOPA
2.
• This is example.
1/(1/1.25*10‐1+ 1/1.25*10‐1 +1/2.5+1/3.13)
=5.98*10‐2 ‐> SIL1
1.25*10‐1
* ‐11
1.25*10
25
2.5
3 13
3.13
2 LOPA
2.
<Practice>
• There are the LOPA sheets but not completed
p yet.
y
• Let’s try to finish the LOPA. (15min)
TI
311 339℃
XI
EV EV FA FI 311
D 101 102 101 101
FC
111 O2
3%
TI TI TI
D
121A 121B 121C
116 m3/h TA TA TA
Crude Pump
121A 121B 121C
340℃
FC MIN.
464 m3/h
112 TI TI TI TI
220℃
141 122A 122B 122C
116 m3/h
TA TA TA
122A 122B 122C
340℃
MIN.
FC
TI
113 TI TI TI
142
123A 123B 123C
116 m3/h
TA TA TA
123A 123B 123C
340℃
MIN.
FC
TI
114 TI TI TI
143
124A 124B 124C
C 116 m3/h
TA TA TA
C
124A 124B 124C
PA 340℃
401A MIN.
TI
PA 144
401B
PA
401C XA
401A
-0.08 kPa-G MEDIAN Frame Detector
PC XA To Topper
401 401B
Frame Detector 340℃
TC
131
EV EV FC 18.4 kPa-G
201 202 201
PA PI
3995 kg/h 201 201
Fuel Gas
F
B B
Methane 29.2%
Propane 41.1%
Butane 26.4%
N2 2.2% 63℃ -1.2 kPa-G
H2O 1.1% TI PI
321 321
ATM
322℃
FA TI
301 301
FC
301 M
Air
56,300 Nm3/h
A M
A
4 3 2 1
4 3 2 1
TI
311 339℃
XI
EV EV FA FI 311
D 101 102 101 101
FC
111 O2
3%
TI TI TI
D
121A 121B 121C
116 m3/h TA TA TA
Crude Pump
121A 121B 121C
340℃
FC MIN.
464 m3/h
112 TI TI TI TI
220℃
141 122A 122B 122C
116 m3/h
TA TA TA
122A 122B 122C
340℃
MIN.
FC
TI
113 TI TI TI
142
123A 123B 123C
116 m3/h
TA TA TA
123A 123B 123C
340℃
MIN.
FC
TI
114 TI TI TI
143
124A 124B 124C
C 116 m3/h
TA TA TA
C
124A 124B 124C
PA 340℃
401A MIN.
TI
PA 144
401B
PA
401C XA
401A
-0.08 kPa-G MEDIAN Frame Detector
PC XA To Topper
401 401B
Frame Detector 340℃
TC
131
EV EV FC 18.4 kPa-G
201 201 201
PA PI
3995 kg/h 201 201
Fuel Gas
F
B B
Methane 29.2%
Propane 41.1%
Butane 26.4%
N2 2.2% 63℃ -1.2 kPa-G
H2O 1.1% TI PI
321 321
ATM
322℃
FA TI
301 301
FC
301 M
Air
56,300 Nm3/h
A M
A
4 3 2 1